Jump to content

Wikimedia Language engineering/Daily/2012–2013

From mediawiki.org

Wikimedia Language engineering team meetings, 2012–2013.

Stand-up meeting 2013-08-30 (14:00 UTC)

[edit]
אמיר (Amir)
  • עשיתי:
    • travel
    • GSoC meeting
  • אעשה:
  • צריך:
કાર્તિક (Kartik)
  • કર્યું:
  • કરીશ:
    • Reviews for story: #3581
  • બાકી છે!:
Niklas
  • Tein:
    • ULS, integration tests
    • Tried to install elastic search
  • Teen:
  • Tarvin:
    • Working google hangout would make my life easier, currently I Windows needs to be restarted before every meeting.
Pau
রুণা (Runa)
  • সমাপ্ত কাজ:
  • চলমান কাজ:
  • প্রয়োজন:
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
  • ചെയ്യും:
  • വേണം:

Weekly team meeting 2013-08-29 (14:00 UTC)

[edit]

1. Sprint update (stories, highlights, blockers) - Niklas - 5 mins

  • MLEB done and released

2. Translatewiki.net outage - Niklas - 5 mins

  • Server crashed; database got corrupted and we lost a few edits; 6 hour downtime

3. MLEB update - Kartik - 5 mins

  • Writing commit messages that can be understood 'stand alone' or referring to bug is a good practise
  • Runa did comprehensive testing +1

4. Font specification update - Kartik - 5 mins

  • Deliverables (like chapters) for the fontbook can be added as stories on the backlog, and will be prioritized appropriately.
  • PAN Indic collaborative effort

5. Bug triage update - Runa - 3 mins

Etherpad got vandalized

8 bugs initially

Attendance was low; had some progress

A practical suggestion from Amir: if there are particular people that we want in the triage, we can invite them personally through Google (incl. team members) +1

6. SV Language Summit at Facebook - Alolita - 5 mins

Alolita will share program details this coming week

7. Admin update - Recent hires - Alolita - 2 mins

  • New hire starting September 3 2013

Stand-up meeting 2013-08-29 (14:00 UTC)

[edit]
אמיר (Amir)
  • עשיתי:
  • אעשה:
  • צריך:
કાર્તિક (Kartik)
Niklas
  • Tein:
    • test refactoring (needs review)
    • restoring twn
    • gsoc meeting
    • bug triage
  • Teen:
    • less today
    • uls stuff?
  • Tarvin:
Pau
  • Fet:
    • Vacation
  • A fer:
    • Catch up with 300 emails
  • Necessitats:
    • More detail on card #3679 Wikimania Blog post - focus on Chinese
রুণা (Runa)
  • সমাপ্ত কাজ:
  • চলমান কাজ:
  • প্রয়োজন:
സന്തോഷ് (Santhosh)

Stand-up meeting 2013-08-28 (14:00 UTC)

[edit]
אמיר (Amir)
કાર્તિક (Kartik)
  • કર્યું:
    • MLEB release at late night. Thanks all for great help! (Amir, Niklas, Runa and ^d)
    • 1:1 with Alolita.
    • Meeting with Runa for Fontbook blog post.
  • કરીશ:
    • Followup for FUEL accomodation and travel.
    • Setting up Ruby envionment for card: 3581.
    • Document the MLEB Release process before I forget any steps.
    • Bug Triage.
  • બાકી છે!:
Niklas
  • Tein:
    • The font story browser tests and they were merged
    • Helped preparing MLEB notes
  • Teen:
    • Update esta
    • ULS has some open patches
    • Main page stuff?
    • gsoc meeting
    • bug triage
  • Tarvin:
Pau(on vacation)
রুণা (Runa)
  • সমাপ্ত কাজ:
    • MLEB
    • Verified the font summary scenarios
    • Passed the scrummaster test
  • চলমান কাজ:
    • Bug Triage this evening
    • MLEB blog (exploring the possibility. Will need help from Kartik and Niklas)
    • Event Report page
    • Font book
  • প্রয়োজন:
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
  • ചെയ്യും:
    • Some more GSOC CR pending
    • Work on Translate or do some research on onscreen keyboards for GSOC/Wikimedia/VE/etc
  • വേണം:

Stand-up meeting 2013-08-27 (14:00 UTC)

[edit]
אמיר (Amir)
કાર્તિક (Kartik)
  • કર્યું:
  • કરીશ:
    • MLEB Release + Testing.
    • Testing: 3581
  • બાકી છે!:
Niklas
  • Tein:
    • Font story GWTs with Runa
  • Teen:
    • Implement those, coordinated with the moving of tests to ULS repo
    • Review MLEB notes?
  • Tarvin:
Pau(vacation)
রুণা (Runa)
  • সমাপ্ত কাজ:
    • GWTs for the font settings story (w Niklas) - 3676
    • started reading up fontbook
    • MLEB patch retests
    • Meeting with the GSoC student
  • চলমান কাজ:
    • ((network went down; wasted some time))
    • Anything more on MLEB
    • Scrum test (the site is back up)
  • প্রয়োজন:
സന്തോഷ് (Santhosh)

Stand-up meeting 2013-08-26 (14:00 UTC)

[edit]
אמיר (Amir)
કાર્તિક (Kartik)
  • કર્યું:
    • Updated lo default font review. Merged.
    • MLEB Release KT with Amir.
  • કરીશ:
    • Review: config.ini for MLEB.
    • Document release process.
  • બાકી છે!:
Niklas
  • Tein:
    • CR etc.
    • (((Learning less))) (of what?) (of CSS :) )
  • Teen:
  • Tarvin:
Pau
  • Fet:
  • A fer:
  • Necessitats:
রুণা (Runa)
  • সমাপ্ত কাজ:
    • MLEB tests
    • started the dialogue for the Sinhalese fonts
  • চলমান কাজ:
    • start looking/working on #3676
    • MLEB testing help document and also recheck if any tests were left out (helplinks) +1
    • Scrummaster test (if the scrummallianc website is up)
    • fontbook
  • প্রয়োজন:
സന്തോഷ് (Santhosh)

Stand-up meeting 2013-08-23 (14:00 UTC)

[edit]
אמיר (Amir)
કાર્તિક (Kartik)
  • કર્યું:
  • કરીશ:
    • Dry MLEB commands + release.
    • Fontbook
  • બાકી છે!:
    • translatewiki.net shell a/c
Niklas
  • Tein:
    • Learning about integration testing
    • Submitted few tests
  • Teen:
    • Continue learning
    • Try to fix one font issue
    • (((Have a meeting)))
    • Account for kartik
  • Tarvin:
    • Need review of tests, one has been waiting soon for two days
Pau(vacation)
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Bug triage prep
    • Javanese blog post ; submitted and waiting on Guillaume for posting. This task can be closed.
  • চলমান কাজ:
    • MLEB manual tests
    • ((Maybe something else if I finish by day end))
  • প্রয়োজন:
സന്തോഷ് (Santhosh)

Weekly Meeting on Aug 22 2013

[edit]

1. Sprint update (stories, highlights, blockers) - Amir - 10min

  • Not a lot of stories because unknown availability of Santhosh
  • MLEB - need to complete soon, Kartik and Runa working with Amir
  • We are writing integration tests for real now
  • Not decided how to fill the remaining of the sprint after current stories completed
  • Probably need help from the testing team

2. Content translation development update - Santhosh, Niklas - 5min

  • Development has not started: working on uls and main page first
  • Some stories in the backlog already

3. VE-IME integration update (accomplishments, next steps) - Santhosh - 5min

  • basic content editable support is live

4. Testing update - Amir - 5 min

  • Niklas has got hands dirty actually writing integration tests and learning a lot
  • We have identified a need for dashboard for status of our own tests
  • Alolita says Timo has developed a dashboard

5. Communications and Outreach update (Blogposts, GSoC, other) - Runa - 5 min

  • three things for Wikimania - want to do it fast
  • event report and 2 blog posts
  • bug triage next wed
  • calender to be updated for the new events - bug triage on the 5th wednesday this month and office hour on the 4th wednesday next month

GSoC:

  • Runa to coordinate with Quim on project demos during the staff meeting week

6. September face-to-face meetings in San Francisco (9/8-9/21) Agenda - Alolita - 10 min

  • agenda building

7. Innovation, Ideas, Pet projects - Team discussion - 10 min

  • skipped

8. Admin & Q-A (ERs, raises should be effective, vacation plans, other) - Team - 10 min

Stand-up meeting 2013-08-22 (14:00 UTC)

[edit]
אמיר (Amir)
કાર્તિક (Kartik)
  • કર્યું:
    • Code reviews of #52322 (c80339), c80017
    • MLEB testing for #52322
    • Misc: Fixed README for ULS.
  • કરીશ:
  • બાકી છે!:
Niklas
  • Tein:
    • mleb bug fix
    • integration test, learning about cucumber etc
  • Teen:
  • Tarvin:
Pau
  • Fet:
  • A fer:
  • Necessitats:
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Mediawiki set up for MLEB testing (\o/)
    • Event Report page set up
  • চলমান কাজ:
    • Review and post the blog post written by Amir
    • MLEB tests, if Kartik and Amir are ready
    • Fontbook reading
    • Prepare for bug triage next week
  • প্রয়োজন:
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
  • ചെയ്യും:
    • will be working today and tomorrow. But no task in sprint planned. let me know which one need to be done.
  • വേണം:

Stand-up meeting 2013-08-21 (14:00 UTC)

[edit]
אמיר (Amir)

wikimedia.org/show_bug.cgi?id=52322 https://bugzilla.wikimedia.org/show_bug.cgi?id=52322]

કાર્તિક (Kartik)
  • કર્યું:
    • MLEB reading and preparation.
  • કરીશ:
    • MLEB with Amir.
  • બાકી છે!:
Niklas
  • Tein:
  • Teen:
    • mleb bug fix
    • integration test for langmenu (bug 51025)
  • Tarvin:
Pau
  • Fet:
  • A fer:
  • Necessitats:
রুণা (Runa)
  • সমাপ্ত কাজ:
  • চলমান কাজ:
    • Event Report for Wikimania. Card 3677
    • Look into card 3676
    • MLEB dicussions
    • Read through the Fontbook documents from Kartik's repository
  • প্রয়োজন:
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
  • ചെയ്യും:
  • വേണം:

Daily scrum notes Date: 2013-08-19

[edit]

Amir

  • did
    • language-selection-method logging
    • code review event logging
    • non-sprint: Yi font, IPA-X-SAMPA keyboard
  • will do
    • finish event logging
  • need
    • clarification about language-selection-method

Kartik

Niklas

  • did
    • some volunteering code review
  • will do
    • expense report
    • eventlogging ?
  • need

Pau

  • did
  • will do
  • need

Runa

  • did
    • Bug tracking and set tracker bugs
  • will do
    • Work on the font specification document (follow up from the discussions during Wikimania) (no story)
  • need

Santhosh

  • did
  • will do
    • Depends on my time availabiliy. Unpredictable. Offline for next 2 days atleast as communicated
  • need

Stand-up meeting 2013-07-31 (14:00 UTC)

[edit]
אמיר (Amir)
  • עשיתי:
    • MLEB
    • Wikimania presentation fixes
    • help links story is Done
    • GSoC - in case you haven't seen it, ULS support is finally merged into VE
  • אעשה:
    • test web fonts refactoring
    • EventLogging
  • צריך:
કાર્તિક (Kartik)
  • કર્યું:
    • Discussion with Santhosh on sizes of webfonts and updated r76689 wrt it.
    • Discussion with Runa and Alolita for GILT FUEL and other things.
    • Discussion with Runa on FUEL GIST 'Paper' abstract and topic. Sent to organizers.
    • Updated AutonymFont for Gujarati.
  • કરીશ:
    • 1:1
  • બાકી છે!:
Niklas
Pau
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Meetings: 1) with RH, 2) with Kartik, 3) with Alolita
  • চলমান কাজ:
    • Wikimania prep blog post about the Language Engineering talks
  • প্রয়োজন:
സന്തോഷ് (Santhosh)

Stand-up meeting 2013-07-30 (14:00 UTC)

[edit]
אמיר (Amir)
  • עשיתי:
    • meetings: 1:1, GSoC update, GSoC evaluation
    • code review
    • met with Niklas about EventLogging, and started working on https://gerrit.wikimedia.org/r/#/c/73953/
    • contenteditable story - DONE
    • help links story - everything works, needs merge
  • אעשה:
    • MLEB
    • test for ULS performance
    • EventLogging
  • צריך:
    • for GSoC - code review for Moriel's patches by VE people
    • merge for the help links test
કાર્તિક (Kartik)
  • કર્યું:
    • #51917: Submitted review + testing.
    • #51098: Worked but hot on git review till submitter's reply.
    • Watched Niklas's i18n deployment.
  • કરીશ:
    • #50846
  • બાકી છે!:
Niklas
  • Tein:
    • I18n deployment (with hangout)
      • Completed migration of translation memory solr to new server
      • WIP: report problem encountered in terbium
    • Non-story stuff: see eva
    • EventLogging session with Amir
    • Asked guidance from Ori about logging link clicks
    • Installing android studio
  • Teen:
    • gsoc
    • presentations
    • ULS perf documentation
  • Tarvin:
Pau
  • Fet:
    • Review Wikimania presentation according to feedback
    • E3 designs
  • A fer:
    • Infobox designs
    • Review Content translation stories and propose ways to split them
    • 1:1 with Alolita
  • Necessitats:
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Guided the GSoC student on adding IME and language search into the dashboard
  • চলমান কাজ:
    • 1:1 with Alolita
    • Complete the Mid-term review
    • Work on bug 51371
    • Follow up on the Hakka Wikipedia font request
  • প্রয়োজন:
സന്തോഷ് (Santhosh)

jquery.i18n/commit/365751efb788c40a06981685bff4a066534fb872 https://github.com/wikimedia/jquery.i18n/commit/365751efb788c40a06981685bff4a066534fb872]

Stand-up meeting 2013-07-29 (14:00 UTC)

[edit]

https://mingle.corp.wikimedia.org/projects/internationalization/cards/3061 was added to the sprint.

אמיר (Amir)
કાર્તિક (Kartik)
  • કર્યું:
    • DoD Meeting.
    • Watched pending 'Wikimania Travel Brownbag' hangout video.
    • Reviewed patches.
    • Working on: #50846, #51917.
  • કરીશ:
    • Working on: #50846, #51917 (and more fontbook work)
  • બાકી છે!:
Niklas
  • Tein:
    • Sprinting to remove 2000+ backlogged emailsemail threads (down to 630)
    • Initiated process for fixing translation memory on WMF
    • Processed some travel related emails
    • Commented Pau's Wikimania presentation
    • Worked on getting merged: https://gerrit.wikimedia.org/r/#/c/73448/
    • DoD meeting, new DoD!
    • Watched travel brown bag without bag
    • Some tweaking to Santhosh' and mine presentation - WIP
  • Teen:
    • Get tasks from Amir about ULS performance
    • EventLogging walkthrough with Amir
    • GSoC
      • Soonest: review and test code
      • Sooner: weekly update
      • Soon: midterm
    • Travel prep
      • Shopping(?)
  • Tarvin:
Pau
রুণা (Runa)
  • সমাপ্ত কাজ:
    • ((No development related work))
    • Completed the storyline for the talk
    • Reviewed the GSoC project status
    • ((Happy about the Definition of Done being completed))
  • চলমান কাজ:
    • Meeting with GSoC student
    • Reworking on the images for the slides
  • প্রয়োজন:
    • Nag 1: Don't forget the GSoC reviews. Try and get the students to write a mid-term blog post
സന്തോഷ് (Santhosh)
Siebrand
:

Worked for another client on Monday. Working for another client on Tuesday.

Stand-up meeting 2013-07-26 (14:00 UTC)

[edit]
אמיר (Amir)
  • עשיתי:
    • code review for Santhosh's patches
    • help docs for Hebrew IME -
  • אעשה:
    • CE tests failing
  • צריך:
    • help from santhosh on CE tests failing<- please work on it, if stuck contact santhosh on Monday morning IST
કાર્તિક (Kartik)
  • કર્યું:
    • CT stories scoring meeting with team.
    • More reading on QUnit.
  • કરીશ:
    • Not well.
  • બાકી છે!:
Pau
রুণা (Runa)(not attending)
സന്തോഷ് (Santhosh)

Stand-up meeting 2013-07-25 (14:00 UTC)

[edit]
אמיר (Amir)
  • עשיתי:
    • little fixes in the testing environment
    • VE RTL bug triage
    • help links test - should work, but fails in the beta site. It's either an issue with configuration there or a bug that was fixed by Santhosh.
    • reviewing code by Santhosh
  • אעשה:
    • finish reviewing code by Santhosh
    • understand why is the help links test failing
    • GSoC meeting
  • צריך:
    • can I access the beta site where the cucumber tests run?
      • <ask hashar>
કાર્તિક (Kartik)
  • કર્યું:
    • Working on fonts bugs: #50846, #51098
    • Reviewed (well tried!) Santhosh's code
    • Learned QUnit framework
  • કરીશ:
    • Learn and add QUnit for my bug
  • બાકી છે!:
Pau
  • Fet:
    • Created stories for content translation
    • Backlog refinement meeting
    • Meeting with Santhosh about UX-tech requirements
    • Infobox design: File:Infobox_redesign_ideas.pdf
  • A fer:
    • Adapt prototype to Bengali
    • 1:1 with Jared
    • Wikimania travel talk
    • Reply to Sumana
  • Necessitats:
রুণা (Runa)
  • সমাপ্ত কাজ:
    • trawling through emails
  • চলমান কাজ:
    • Slides for the Hong Kong DevCamp. Link? (in progress, shall upload to commons when ready with the story-line)
    • Meeting with Communication team member
  • প্রয়োজন:
    • Pau: Response to Sumana's mail?
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
    • multiple performance fixes for ULS - reduce javascript code size by lazy loading scripts
      • No ime code loaded till user click on an editable field -> 'readers' wont get jquery.ime code by default
      • All initailization of ULS is delayed till user interaction from document ready
      • language settings code is not loaded till user clicks on cog icon or till IME menu active first time.
      • For personal position language settings are initialized after user click on bottom links
    • Meeting with Pau to understand the CT more. Notes http://etherpad.wikimedia.org/ct-tech-requirements
  • ചെയ്യും:
    • Some more pefromance fixes for ULS to reduce the javascript footprint
  • വേണം:
    • CR - content editable support, ULS performance fixes
Siebrand

Wikimania Brown bag (in 5 hours). Weekly meeting was cancelled? I don't see it in my calendar. [Kartik says that Alolita told him the meeting is cancelled]. Have meetings with Gayle and Howie today. Last day in SF, will be in tomorrow's daily. Have a fight at 14:00 PDT.

Stand-up meeting 2013-07-23 (14:00 UTC)

[edit]
आलोलिता (Alolita)(not present)
אמיר (Amir)
  • עשיתי:
    • reported more VE RTL bugs
    • reviewed Santhosh's code
    • help links test - committed
    • 1:1
    • GSoC meeting
  • אעשה:
    • ULS bugs, if there's time
  • צריך:
    • help with webfonts test<- tomorrow morning
કાર્તિક (Kartik) (away)
  • કર્યું:
    • Tested #38238 for pending enhancements: Review mostly tomorrow after more tests.
    • Working on fonts bugs: #50846, #51098 and #51159
Niklas (vacation)
Pau
রুণা (Runa)
  • সমাপ্ত কাজ:
    • 1:1 Annual Review
    • Meeting with sucheta
    • Worked with GSoC student to validate some of the functionalities
  • চলমান কাজ:
    • Working on the language portal - this may need a little more time due to the layout complexities
    • ((don't plan to work anymore tonight))
  • প্রয়োজন:
    • GSoC mentors: Mid-term review time; between 29/07-02/08. Please check Quim's mail on Wikitech
സന്തോഷ് (Santhosh)
Siebrand

Observing that no story cards will be done, except for the phase 5 deployment of ULS 2 weeks ago. The same was true the previous sprint. This may indicate there's a big problem with delivering. Still have to send mail to Philippe and Sumana.

Stand-up meeting 2013-07-22 (14:00 UTC)

[edit]
आलोलिता (Alolita)(not present)
אמיר (Amir)
  • עשיתי:
    • replies to a bunch of bugs.
    • reviews for a bunch old patches (see eva).
    • code review for Santhosh's changes
    • worked with Moriel to resolve a critical VE RTL bug (deployment in three days - https://gerrit.wikimedia.org/r/#/c/74835/ )
    • started writing replies to Erik's questions about performance
    • worked with Zeljko to finalize the help links test, still not finished though
  • אעשה:
    • finish those tests already
  • צריך:
કાર્તિક (Kartik) (not present)
  • કર્યું:
    • Learned how to update from upstream from Santhosh. Updated grunt setup. Working now.
    • Reviewed some ULS high priority bugs. Poked Amir and tested it. More on it tomorrow.
  • કરીશ:
    • 1:1
  • મદદ જોઇએ છે:
Niklas(on vacation)
Pau
  • Fet:
    • Design team meeting on infobox redesign
    • Update prototype with pending changes for Translation Center
  • A fer:
    • Update prototype: Translate view smaller changes
  • Necessitats:
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Meeting with GSoC student
    • Meeting with Andre
    • Language Matrix review
  • চলমান কাজ:
    • Language Portal
    • 1:1 Annual review meeting
  • প্রয়োজন:
    • Should last week's record be removed from i18n-eva? (Its already in the mediawiki page and changes ought to be made at only one place)
    • Inputs on bugs: https://bugzilla.wikimedia.org/show_bug.cgi?id=32686 [NL]
    • Need help with scripts with 5 letter Unicode code, like Akkadian.
    • Inputs about the query from the Communication team.
സന്തോഷ് (Santhosh)

Stand-up meeting 2013-07-18 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
  • मैं करूँगी:
  • मुझे चाहिए:
אמיר (Amir)
  • עשיתי:
    • GSoC meeting with Praveen and Santhosh
    • GSoC meeting with Moriel
    • Got the preferences test merged + Unicode fix
  • אעשה:
    • tests - help links, webfonts refactoring
  • צריך:
કાર્તિક (Kartik)
  • કર્યું:
    • Really bad Internet and throat, so did most of time time offline reading.
  • કરીશ:
    • 1:1 with Alolita
  • બાકી છે!:
Niklas(on vacation)
Pau
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Tested gothic fonts - creates conflicts with Burmese script during raw inputs. Needs some reading up.(which feature/bug is this?)
  • চলমান কাজ:
    • Language Matrix - Adding Webfont information
    • Meeting with GSoC student tomorrow morning
    • ((May be irregular for the rest of the evening))
  • প্রয়োজন:
സന്തോഷ് (Santhosh)

Stand-up meeting 2013-07-18 (14:00 UTC)

[edit]
אמיר (Amir)
  • עשיתי:
    • tests for ced, with Santhosh's help from 240 fails to 2
    • the test for https://bugzilla.wikimedia.org/show_bug.cgi?id=50790 is done, needs review by Zeljko or Chris
    • test for helplinks - mostly written, needs debugging help from Zeljko or Chris to complete
    • helped Moriel integrate ULS to VE in compact mode, according to Pau's recommendation
  • אעשה:
    • GSoC meeting
    • team meeting
    • test for webfonts refactoring
  • צריך:
    • review of [https://

gerrit.wikimedia.org/r/#/c/72365/ https://gerrit.wikimedia.org/r/#/c/72365/] by Zeljko or Chris

Niklas(on vacation)
Pau
  • Fet:
    • 1:1 with Jared
    • Design team meeting
    • Wikimania presentation
  • A fer:
    • Team meeting
    • Complete Wikimania presentation
  • Necessitats:
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Blog post reviewed and posted
  • চলমান কাজ:
    • Language Matrix data review (ongoing)
    • Test out Gothic text input using raw unicode
    • Team Meeting
    • Create story trail for the DevCamp presentation
  • প্রয়োজন:
സന്തോഷ് (Santhosh)

Stand-up meeting 2013-07-17 (14:00 UTC)

[edit]
אמיר (Amir)
  • עשיתי:
    • Very bad noise because of construction work - couldn't do much serious work, mostly took care of emails. I'll try to make up in the evening.
    • Reported VisualEditor bugs with complex scripts (51472, 51477).
    • Trying to understand why are the ced tests failing.
    • Started writing Wikimania slides.
    • Reviewed Runa's DoD contributions.
  • אעשה:
    • tests for help links, ULS preferences, ced.
  • צריך:

કાર્તિક (Kartik)

  • કર્યું:
    • ISP changed; New connection still broken!
    • Most of time reading offline documentation for fonts and js (and jquery.ime specs etc)
    • Tried to figure out issue with Gujarati Transliteration on 'ch' and 'chh'. Partial patch submitted.
  • કરીશ:
  • બાકી છે!:
Niklas(on vacation)
Pau
রুণা (Runa)
  • সমাপ্ত কাজ:
  • চলমান কাজ:
    • Finalizing the blog post (thanks Amir)
    • Language Coverage Matrix - review the document
    • Language Portal
    • 1:1 for annual review
  • প্রয়োজন:
    • Not sure if I can do a session (mostly non-tech) for the DevCamp
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
  • ചെയ്യും:
    • Try to understand the grapheme cluster code of VE
    • CR
  • വേണം:
    • qunit test fixes for CE
    • CR
Siebrand
:

Have a meeting with HR and Alolita at 16:00 UTC. We appear to have guests at tomorrow's team meeting.

Stand-up meeting 2013-07-D (14:00 UTC)

[edit]
אמיר (Amir)
  • עשיתי:
  • אעשה:
    • process Runa's additions to DoD
    • try to write more tests for contenteditable
    • write a test for help links
    • write draft presentation slides
  • צ&# 1512;יך:

કાર્તિક (Kartik)

  • કર્યું:
    • Reading of Pothana paper for FontBook. Added some ideas from it. Re-reading it tomorrow.
    • Tried to do some code review from Santhosh's ced. All void for me so far.
  • કરીશ:
    • Relook on pending font bugs.
  • બાકી છે!:
Niklas
  • Tein:
    • ULS deployments
    • ULS event logging (not finished)
    • Wikimania presentations (not finished)
  • Teen:
    • As little as possible
  • Tarvin:
Pau
রুণা (Runa) (canceled)
സന്തോഷ് (Santhosh)(not attending-bandwidth issue)

Stand-up meeting 2013-07-15 (14:00 UTC)

[edit]
אמיר (Amir)
  • עשיתי:
    • reviewed Santhosh's content-editable branch, made some tiny fixes, and had a meeting with Santhosh to understand it better
    • improved the integration test for the preferences saving bug ( https://gerrit.wikimedia.org/r/#/c/72365/ ). Not complete yet. Not in this sprint, but it's quite similar to the test that is needed for the help links, which is in the sprint.
    • fix bugs in the IMEs for Marathi and Hebrew
    • code review for help links
    • code review for i18n code removal
    • tax report
  • אעשה:
  • צריך:
કાર્તિક (Kartik)
  • કર્યું:
    • Updated pending review after feedback of Santhosh and some messed up.
    • Learn more about gerrit, merge process and git rebase via Santhosh, Siebrand, and documentation.
    • Fonts bugs closed: 42421, 46693, 49510.
    • Watched Monthly Metrics Meeting.
  • કરીશ:
  • બાકી છે!:
Niklas
  • Tein:
    • Ime help links
    • Little bit Wikimania talk with Santhosh
    • read twn newsletter
  • Teen:
    • Event logging, Wikimania
    • gsob glob post stuff?
  • Tarvin:
    • Your take on ULS deployment tomorrow?
      • Slight risk in i18n code and help link refactorings. Remaining help link patchset should be merged before deployment.
    • Q: How to proceed with i18n-eva?
      • Runa: mediawiki page that can be linked to sprint roundup blog?
Pau
  • Fet:
  • A fer:
    • Update the prototype with changes from https://trello.com/b/CdJXeyVW :
      • warn auto-translation abusers.
      • Confusion between paragraph and word-level suggestion
  • Necessitats:
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Bug triaging
    • Added DoD information for testing tasks
    • Added information for the GSoC blog post
    • Conversation with Oliver about the LCM project
    • Cleaned up mingle cards
  • চলমান কাজ:
    • Meeting with GSoC candidate early tomorrow
    • Will add a mediawiki page for the i18n-eva information (to be updated at the end of every week; monday morning maybe)
    • ((need to file tax returns))
  • প্রয়োজন:
സന്തോഷ് (Santhosh)

]

Stand-up meeting 2013-07-12 (14:00 UTC)

[edit]
אמיר (Amir)
  • עשיתי:
    • Hebrew Wikipedia 10th anniversary
    • meeting about GSOC
    • started reviewing Santhosh's code:
      • content-editable
      • ULS jquery.i18n support rewriting
    • 1:1
  • אעשה:
    • finish reviewing Santhosh's current code
  • צריך:
Kartik (not present)
Niklas
  • Tein:
  • Teen (monday-tuesday):
    • Get help links Finished
    • Event logging
    • Two Wikimania presentations with Santhosh and Amir
  • Tarvin:
Pau
  • Fet:
  • A fer:
    • Report Language variant discussion as bug to keep track of it.
    • 1:1 with Jared
    • Interview with another UX candidate
    • Create designs for other enhancements from content translation observations https://trello.com/b/CdJXeyVW
  • Necessitats:
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Watched the Metrics meeting video
    • Communication meeting (follow up from SFO visit)
    • Following up on ULS related threads
  • চলমান কাজ:
    • Meeting with Amir about the Definition of done
    • Blog:Finish the section on GSoC project I am mentoring
    • (Waiting for confirmation on a 2 meeting that may happen later in the evening)
  • প্রয়োজন:
    • Inputs from the other members about their GSoC projects
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
    • Refactored jquery.i18n in mw.uls to reduce size
    • Sent a mail to Roan about the current status of our contenteditable support progress
    • Documented some notes on CE support http://etherpad.wikimedia.org/ime-contenteditable
    • Helped Niklas with a starting version for help links(jquery.ime)
    • CR and others http://etherpad.wikimedia.org/i18n-eva
    • Reviewed code of interview candidate
    • GSOC code review and discussions
    • started a shared presentation with Niklas to work on Wikimania presentation
  • ചെയ്യും:
    • weekend. rest.sleep.read
  • വേണം:

Siebrand:

Had a get to know each other talk with Jared. He wants to end designating specific designers to specific teams. Code review. Some process confusion over changing sprint contents. Got mail from Gayle on next steps in team dynamics. Not making notes about the details of that. Plans: twn and more. Need: https://mingle.corp.wikimedia.org/projects/internationalization/cards/3580 "ULS should work as fast as posible and have no known performance issues" is in, https://mingle.corp.wikimedia.org/projects/internationalization/cards/3518 "ULS triggers aren't shown in IE8 in Windows XP on Wikimedia sites" is out? (+8/-8). <- approved by team, and changes made in mingle by SM.

Stand-up meeting 2013-07-11 (14:00 UTC)

[edit]
आलोलिता (Alolita)(not present)
אמיר (Amir)
  • עשיתי:
    • performance debugging
    • expense reports totally completely absolutely done
    • webfonts tests cleanup
  • אעשה:
    • reviewing Santhosh's content-editable changes
  • צריך:
    • some time to discuss Runa's additions to DoD

Kartik (won't attend Daily as per schedule, but may attend)

Niklas
  • Tein:
    • ULS performanceeeee
    • ULS help links with Runa
    • Published my "i18n evangelisation" proposal (link?)
    • Office hours (kind of)
    • GSoC meeting
    • Tech usernames survey
  • Teen:
    • 1:1
    • performance > event logging > help links > wikimania
  • Tarvin:
Pau
রুণা (Runa)
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
  • ചെയ്യും:
    • more research on content editable support,
    • CR
    • (can spent time on content editable feature walkthrough, explanation, issues tomorrow)
    • GSOC, have some replies and CR pending
    • todo: contact Roan about CR+VE
  • വേണം:

Siebrand:

Have to be in San Francisco from 20-27 July. "tldr: Please reserve July 22-23 on your calendar for an offsite where you will get free food in exchange for talking about the future of humankind." Meeting similar to one in which I participated in March 2012, where we came to "Messaging, Identity, Affiliation". Only heard yesterday. Booked ticket and have hotel now. I'm not available on the sprint change day. Can we move the sprint change to 1 or 2 days later?

Stand-up meeting 2013-07-10 (14:00 UTC)

[edit]
आलोलिता (Alolita
VAC):
  • मैंने किया:
  • मैं कर& #2370;ँगी:
  • मुझे चाहिए:
אמיר (Amir)
  • עשיתי:
    • webfonts performance issues
    • process meeting
    • two interviews
  • אעשה:
    • review performance patch
    • meeting with Moriel's supervisor
    • stories
    • office hours
  • צריך:
    • Input from Runa about the Definition of Done
Kartik
  • કર્યું:
    • Learned local webfonts setup + mw and performance testing with Amir.
    • Sprint Process Meeting.
    • Attended FUEL IRC meeting, but left halfway.
  • કરીશ:
    • Will be present in Office Hour.
  • બાકી છે!:
Niklas
  • Tein:
    • Working on ULS performance with Amir
  • Teen:
    • GSoC
    • Office hours
    • 1:1
    • Hoping to deploy ULS performance fix today
  • Tarvin:
Pau
  • Fet:
    • Usability testing performed
    • Summarized usability findings for first test
    • Got more feedback from Jared
    • Process meeting
  • A fer:
    • Summarize findings for second test
    • Process all feedback received to find design solutions
    • Office Hours
  • Necessitats:
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Meetings with Sucheta about lcm-dashboard (continuation of talks from OSBC),
    • Meeting about sprint process
    • Emails
    • Reading through bug reports
  • চলমান কাজ:
    • Office hour
    • ..
    • Following up on a Hakka Wikipedia bug that was reported on my talk page
    • Finish reading Pau's document
    • 1:1
  • প্রয়োজন:
    • Is the team meeting happening tomorrow?
    • Suggestions for the ULS IME Help, template page
സന്തോഷ് (Santhosh
VAC):
  • ചെയ്തു:
  • ചെയ്യും:
  • വേണം:

Stand-up meeting 2013-07-08 (14:00 UTC)

[edit]
אמיר (Amir)
  • עשיתי:
    • PHP fallback
    • Slovak fix
    • some more ULS fixes
    • started a draft for ULS last-used-mapping test, Chris promised to help
    • helped Moriel start integrate ULS into VE
  • אעשה:
    • try to finalize DoD (thanks for the reminder, Niklas)
  • צריך:
Kartik
  • કર્યું:
    • #50782: Updated pull request. Clean one now.
    • #50782: Another pull request based upon Santhosh's request for or/*.js
    • Some code reviews coming from team.
  • કરીશ:
    • Setup remaining node.js on system (currently broken!).
  • બાકી છે!:
Niklas
  • Tein:
    • Some coding on the weekend, only got frustrated
    • ULS Code review session
    • Resting
  • Teen:
    • Trying not to get ill
    • Maybe a little coding, but certainly not able to finish most of my sprint tasks
    • DoD????(ST: did not get time,need time to look at it)
    • ULS deployment phase 5
  • Tarvin:
Pau
  • Fet:
    • Updated prototype for testing with users
  • A fer:
    • Usability testing
    • UX candidate interview
    • Sprint meetings
  • Necessitats:
রুণা (Runa) (not present)
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
    • Worked on sunday - fixed some bugs, review, wrote documentation
    • Bug fixes- ULS, review, testing
  • ചെയ്യും:
    • deployment, testing. nothing else
  • വേണം:

Siebrand:

ULS.

Stand-up meeting 2013-07-05 (14:00 UTC)

[edit]
אמיר (Amir)
  • עשיתי:
    • Fallback in jquery.i18n PHP API.<-to be completed by Amir
    • Code review
    • Fixed custom field exclusion by selector ( https://bugzilla.wikimedia.org/show_bug.cgi?id=41675 )
    • Taught Kartik about QUnit
    • First version of the translatewiki.net iPhone app is released! \o/
  • אעשה:
    • Fallback in jquery.i18n PHP API
  • צריך:
Kartik
  • કર્યું:
    • #50782: Two bugs: 1. Tested for Chrome+Mac OS X, 2. Give feedback on where to fix it to user (as user is also familiar with process and native language user of bug in the question)
    • Discussion and learned jquery.IME tests + QUnit introduction from Amir.
    • Submitted patch to Github for #50782.
  • કરીશ:
  • બાકી છે!:
    • Review patch for #50782 based upon Santhosh/Submitter's feedback
Niklas
Pau
রুণা (Runa)( on leave)
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
    • jquery.i18n message store for ULS, follow ups
    • ULS bug fixes
    • CR
  • ചെയ്യും:
    • Meeting with Gayle
    • Weekend
  • വേണം:

Stand-up meeting 2013-07-04 (14:00 UTC)

[edit]
אמיר (Amir)
  • עשיתי:
    • addressed code review comments on a bunch of my commits
    • writing a test for help link
    • 1:1
    • testing TUX and ULS with an Android Tablet
  • אעשה:
    • sk keyboard bug in GitHub.
    • GSoC meeting
    • help with communication?
    • what else?
  • צריך:
Kartik
  • કર્યું:
    • #50032: Updated + Feedback from Siebrand. Thanks!
    • #50648: Did some search for homepage, read discussion at various places about license etc and submitted review.
  • બાકી છે:
    • Feedback on two reviews + changes according to it.
Niklas
  • Tein:
    • Had 1:1 with Alolita
    • Watched tech talk about search
    • Prepared ULS phase 5 patch
    • Reviewed few ULS commits with crossbrowsertesting
    • Found an issue in ULS event logging with Opera
  • Teen:
    • (Stockpiling from earlier dailies)
    • Code review meeting stuff
    • ULS event logging, new events and trying to solve the Opera issue
    • Read DoD
    • Got reminder that I still have some annual review related stuff to do
  • Tarvin:
Pau
রুণা (Runa) (not present)
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
    • politics
    • some content editable debugging.
    • Writing a custom message store for MW.ULS i18n- to avoid loading issues with big articles
  • ചെയ്യും:
    • finish message store for jquery.i18n
  • വേണം:
    • motivation, encouragement etc
    • can somebody do fallback mechanism in APIULSLocalization?

Stand-up meeting 2013-07-03 (14:00 UTC)

[edit]
אמיר (Amir)
Kartik
  • કર્યું:
    • First 'git review' :)
      • congrats
    • #50649: Add missing license and url for Madan
    • Reviewed other 'font license' bugs
  • કરીશ:
    • Review other font license bugs and submit reviews
  • બાકી છે!:
Niklas
  • Tein:
    • GsOc meeting
    • Ori merged my first event logging patch for ULS - yay
  • Teen:
    • Tech talk about search tonight
    • The event logging stuff I didn't get to today
    • Organize code review meetings
    • Read DoD
    • ULS phase 5 patch by tomorrow noon UTC+3
  • Tarvin:
Pau
রুণা (Runa)
  • সমাপ্ত কাজ:
  • চলমান কাজ:
    • Meeting with GSoC student
    • send out the office hour announcement (this time for real)
  • প্রয়োজন:
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
  • ചെയ്യും:
    • Content editable div
  • വേണം:

Siebrand:

  • ULS deployed y'day on en.wp. I checked TVP. Some muttering about that it cannot be disabled, and that it may cause script timeouts (no evidence for this, though) on very long pages, like Barack Obama. No high priority issues reported.
  • Updated the communication for phase 5 deployment with Runa. Communication is most probably ready and will be sent to well over 500 wikis.
  • Sent mail to JamesF yesterday requesting VE fontend dev to work together with us on VE IME support. No answer yet.
  • Briefly granced at, and commented on the DoD proposal.
  • Happy with the 3 more ready stories.
  • gave Kartik proper bugzilla access.
  • Future plans:
    • Talk to Kartik, try to get some more structure in the onboarding.
    • Complete the ULS deployment communication. ETA for phase 5 configuration patch?
    • Have my annual reiview w/ Howie today at 22:00
    • Was contacted by Gayle for a chat on team dynamics. May have that chat today, depending on her availability.
    • Plan a backlog refinement meeting for next sprint of 1 hour with a goal of 6 stories that are not as ready as the previous ones were. Yay for challenging goals!

Stand-up meeting 2013-07-02 (14:00 UTC)

[edit]
אמיר (Amir)
  • עשיתי:
    • meetings - GSoC * 2, backlog and stories, but no 1:1
    • working on definition of done ( http://etherpad.wikimedia.org/i18n-dod )
    • tried reviewing the GitHub IME patch, but GitHub was broken. will try again.
    • a lot of email
    • ULS pixels tweak
  • אעשה:
    • code review
    • work on DoD
    • try to review the GitHub IME patch again
    • address code review comments
  • צריך:
Kartik
Niklas
  • Tein:
    • Earlier
      • Techops weekly meeting (20+ people!)
      • Playing with the jQuery online course
    • Today
      • ULS testing
      • ULS deployment (so far so good)
      • Deployment coaching to Santhosh and presentation to Siebrand
      • Story work
      • ULS event logging
  • Teen:
    • Tuesday
      • GSoC meeting with Quim & al
      • ((( WMFI weekly )))
      • 1:1
    • Wednesday
      • Getting ULS event logging code merged
      • More story work?
      • Try implementing the other events besides the one where I'm blocked
  • Tarvin:
    • Proposal for definition of done so it can be discussed.
      • Amir working on it.
    • Are office hours for next week wednesday certain?
      • Yes
    • Completion of the mainpage related tasks is unclear, since they have been waiting code review for a long time and ULS is taking priority.
    • The development team collectively has about 30 unmerged patchsets. Do you have any ideas how to get that number down?
      • I'll schedule code review meeting.
Pau
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Meetings - backlog and task assignment
    • ULS testing
  • চলমান কাজ:
    • ULS input method help documentation - task 3557
    • ((finalize the ime gap analysis doc - inscript 2 was the blocker))
    • More reading of the agile books
    • 1:1
    • send out the office hour announcement
  • প্রয়োজন:
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
    • ULS testing - 2 patches about webfonts for buttons in the settings panel
    • ULS deployment- watching Niklas deploying, some testing after that
    • Continuing on Contenteditable div support for jquery.ime. Have a working version for Firefox.https://github.com/santhoshtr/jquery.ime/commits/ced
    • Sprint preparation meetings
  • ചെയ്യും:
    • Continue contenteditable div support
    • GSOC meeting with Quim Gill
    • 1:1(?)
  • വേണം:

Siebrand:

twn support, has ULS on en.wp, tested IE8/Xp - one issue reported, some triaging on ULS issues and backlog refinement. Planned: twn newsletter. Didn't get to it today. Need to put out ULS deployment phase 5 announcement, backlog refinement meeting.

Stand-up meeting 2013-07-01 (14:00 UTC)

[edit]
आलोलिता (Alolita) (not present)


אמיר (Amir)
  • עשיתי:
    • MLEB release
    • GSoC:
      • code review
      • experiments with RTL on Mac OSX
    • expense reports
    • reading books about Agile
  • אעשה:
    • expense reports
    • GSoC meetings
    • 1: 1
    • code review
  • צריך:
    • can you look at uk-kbd and qunit tests?
Kartik (not present)
  • કર્યું:
    • Product backlog meeting
  • કરીશ:
    • looking at: uk-kbd bug
  • બાકી છે!:
Niklas
  • Tein:
    • Backlog meeting
    • Prepared for ULS deployment
    • Learnt how to add latency to my connection
  • Teen:
    • Deploy ULS
    • Backlog meeting
    • 1:1
    • GSoC meeting wth Quim
  • Tarvin:
Pau
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Annual review documents
    • Expense reports (took longer than i expected)
    • backlog meeting
    • Updated the ULS FAQ
  • চলমান কাজ:
    • Working on the IME GAP page
    • Portal work
    • Read the books about agile and Scrum test
  • প্রয়োজন:
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
    • Fixed high priority bug https://bugzilla.wikimedia.org/50391 during weekend
    • ((attending a MIT opencourseware on meta maths))
    • ((pet projects))
    • Sprint preparation meeting
    • jquery.ime content editable support
    • wrote faq proposal for font, input tool selection, others improved it
    • bugzilla stuff
  • ചെയ്യും:
    • jquery.ime content editable support
    • en.wiki gets ULS
  • വേണം:

Siebrand:

Worked on getting 3 stories ready in the backlog with dev team. Timebox was 10 minutes per story. We needed 30 minutes for 1 story. Sorting out of story scoring isn't working yet. Have to think if there are ways to get better at this - looking forward if anyone else has ideas we can try in the next meeting. Struggling with the implication of Erik's email and what this means for 1:1 interactions. Tomorrow is about more backlog refinement, translatewiki.net newsletter and ULS deployment. Will be working out of WMNL office for a while. Installing latest XCode, which should have an application to limit network characteristics in OSX to test issues that make claims about performance with slow and/or high latency connections. I was wondering if the dev team is still planning on delivering a definition of done by the end of the sprint.


Stand-up meeting 2013-06-28 (14:00 UTC)

[edit]
आलोलिता (Alolita)(not attending)


אמיר (Amir)
  • עשיתי:
    • catching up on email
    • code review
    • MLEB release notes
    • annual review meeting
  • אעשה:
    • finish MLEB
  • צריך:
Kartik
  • કર્યું :
    • Reading Scrum documentation :)
    • More work on font specification (common+Gujarati)
  • કરીશ :
  • બાકી છે:
    • can you check the uk-kbd and other keyboards with tests?
Niklas
  • Tein:
    • Had my annual review
    • Watched tech talks
    • Worked on ULS event logging
      • ime-enable, ime-disable
  • Teen:
    • Preparing for ULS deployment
      • Please note that there will be no new new wmf branch next Thursday
  • Tarvin:
    • Got stuck with ime-change, need help
Pau
রুণা (Runa)
  • সমাপ্ত কাজ:
  • চলমান কাজ:
    • Preparing a list of m17n IMEs that are missing from ULS (outcome of the last meeting with RH Lang Eng on 26/06)
    • Annual Review forms
    • Expense report
    • Meeting with GSoC student and Quim
    • ((Heads up: On leave from 4th-8th July; shall send mail later in the evening))
    • ((Write up a post on my personal blog about the experiences at SFO/Portland)) Nice.
  • প্রয়োজন:
സന്തോഷ് (Santhosh)

Siebrand:

I booked my ticket for Hong Kong a few days ago, sent in the expense report for it, did some backlog refinement for the ULS related stories and work/cleanup in bugzilla after a joint bug triage session by Jared and Howie; I sent them an email asking them to not assign issues, because assigned in our context means someone is working on it and that we expect to resolve it soonish. Have a meeting with Howie later today. Need to know if the following stories are ready, and if they are, they need scoring and adding to the backlog of the current sprint:

Needs to be brought to ready so we can assess as team. Takers? < Niklas

Stand-up meeting 2013-06-24 (14:00 UTC)

[edit]
आलोलिता (Alolita) (may not be able to join in due to late night work session)
  • मैंने किया:
    • Participated, presented at Open Source Bridge last week
    • Meeting with Amir, Runa on ULS integration tests, QA strategy
    • Catching up on email
    • Followed up with Kartik, Pradeepto
  • मैं करूँगी:
    • Annual Reviews
    • ULS update
    • Hiring followup w HR, recruiter, candidates
    • Sprint closing meeting + retrospective + new sprint planning
  • मुझे चाहिए:
אמיר (Amir)
  • Did:
    • Transport, motorways and tramlines, starting and then stopping, taking off and landing
    • Lunch with my GSoC mentee in Manhattan :)
  • Will do:
    • Email
    • Try to write some more tests
  • Need:
Kartik
  • Did:
    • Bugs: #50032 and #49936 as Sathosh had limited network bandwidth
    • Fontbook: Learning on ctex syntax (!) and more Gujarati font updates
  • Will do
    • Pending screenshots/images for Fontbook update
  • Need
Niklas
Pau
Pradeepto (not present)
রুণা (Runa) (Unable to join due to travel)
സന്തോഷ് (Santhosh)(may not attend if power is not back)
  • ചെയ്തു:
    • affected by power, internet outage -heavy rains
    • ULS bugs
  • ചെയ്യും:
    • Sprint meetings
  • വേണം:
Siebrand
  • Done:
    • Product owner training. Was very, very useful. I'll share more in tomorrow's retrospective. I think we have to change a good many things in they way we work to become more agile, as we appear to have slid down into waterfall like patterns over the past year.
    • twn exports and updates
  • Will do:
    • Remaining ULS deployment communications Phase 3
    • ULS deployment communication phase 4 (only English language Wikipedia)
    • Prepare proposal for in retrospective
  • Need:
    • Seem to have trouble integrating the new team members at the moment; not really clear what they will do, how much time they are available, when they will attend dailies, etc. This makes it hard for them to get productive IMO.

Stand-up meeting 2013-06-21 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
  • मैं करूँगी:
  • मुझे चाहिए:
אמיר (Amir)
  • עשיתי:
  • אעשה:
  • צריך:
Kartik
  • Did:
  • Will do:
  • Need:
Niklas
  • Tein:
    • Attended mediawiki release management irc office hours
    • day off
  • Teen:
  • Tarvin:
Pau
Pradeepto
  • Did:
  • Will do:
  • Need:
রুণা (Runa)
  • সমাপ্ত কাজ:
  • চলমান কাজ:
  • প্রয়োজন:
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
  • ചെയ്യും:
  • വേണം:
Siebrand (not present)
  • Done:
    • CSPO training
    • Lots of bugzilla traffic related to ULS
  • Will do:
    • Weekend things
  • Need:

Stand-up meeting 2013-06-20 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
  • मैं करूँगी:
  • मुझे चाहिए:
אמיר (Amir)
  • עשיתי:
    • OSB
    • Tagalog bug
  • אעשה:
    • Address Niklas's comments about the Tagalog bug
    • OSB
  • צריך:
Kartik
  • Did:
  • Will do:
  • Need:
Niklas
  • Tein:
    • Watched TravisCI presentation
      • Seems complementary to our Jenkins stuff
      • Also included composer and packagist, which I were more interested in
    • ULS
    • Code review
  • Teen:
  • Tarvin:
Pau
Pradeepto
  • Did:
  • Will do:
  • Need:
রুণা (Runa)
  • সমাপ্ত কাজ:
  • চলমান কাজ:
  • প্রয়োজন:
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
    • Updated Lohit font and added many fonts
    • attempted 47875 again, but not good
    • CR
  • ചെയ്യും:
    • off
  • വേണം:
Siebrand
  • Done:
  • Will do:
  • Need:

Stand-up meeting 2013-05-19 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
    • Open Source Bridge
    • Worked on presentation
  • मैं करूँगी:
    • Language Coverage Matrix review, meeting w Sucheta
    • Open Source Bridge + presentation
  • मुझे चाहिए:
אמיר (Amir)
  • עשיתי:
    • committed another test
    • fixed a bug in the Ukrainian keyboard
    • conference
  • אעשה:
    • conference
  • צריך:
Kartik
  • Did:
    • Font spec conversation with Santhosh
    • jQuery code - understanding and learning
  • Will do:
    • Continue jQuery immersion this week
    • Sync up with Runa on bugs for jQuery
  • Need:
Niklas
  • Tein:
    • ULS
      • Opera
      • Wikidata issue
      • CR
    • Main page
      • Fixing and rebasing my existing patches
    • Trying to get my patches reviewed
  • Teen:
    • ULS and MainPage
    • Midsummer incoming, reduced availability depending on the weather
  • Tarvin:
Pau
  • Fet:
    • Back from Bratislava
    • Lots of emails
  • A fer:
    • Review Opera-related patchsets
    • Content translation prototype
  • Necessitats:
Pradeepto (not present)
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Attended OSBC day 1 - delayed arrival. Ruby beginner's BOF.
    • ((Not much done yday))
  • চলমান কাজ:
    • Finish all pending work from yesterday
  • প্রয়োজন:
സന്തോഷ് (Santhosh)(not attending - traveling)
  • ചെയ്തു:
    • IME updates for uz, uk, be, ru
    • default ime = system fix
    • Opera cog icon issue
    • checked the
  • ചെയ്യും:
    • rest of the cards
  • വേണം:
Siebrand (CSPO training)

Stand-up meeting 2013-05-18 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
    • Agile/scrum discussions w Amir, Arthur, Runa
    • Runa interview followup
    • Candidate followup
    • Google conf call
    • EMgt meeting
    • Annual review scheduling
  • मैं करूँगी: At OSB, Portland June 18-21
  • मुझे चाहिए:
אמיר (Amir)
  • עשיתי:
    • meetings about GSoC (Or, Moriel)
    • meetings with Chris:
      • the first test merged
      • one more test written, will commit after a bit of cleanup
    • discussions with Alolita and Arthur about how to do Scrum better
      • any outcomes? - brainstorming
  • אעשה:
    • Open Source Bridge, Portland
  • צריך:
Niklas
  • Tein:
    • Engineering/TechOps meeting
      • Gave brief ULS deployment update
      • Mentioned IE8 issue -> no actions
      • Mentioned ULS for anon issue -> Need to wait for Varnish 4 and continue on wikitech
    • GSoC syncup
      • so good so far, he will start coding after exams
    • ULS deployment
      • One new bug was found during pre-deployment testing, no other issues
      • Was expecting more people to be around and testing
        • (who? we are just 3 available)
        • Following people had ULS pre-deployment testing related tasks: Kartik, Pau, Runa (preparation), Niklas, Siebrand, Santhosh
      • Send Runa and Siebrand list of phase 3 wikis
    • ((( Shopping )))
    • One of my JavaScript patches for core was merged!!!!11one
    • Bug fixing (Translate): https://gerrit.wikimedia.org/r/69162
  • Teen:
    • Usual stuff: main page and ULS (cr and phase 3)
  • Tarvin:
    • Travel...
Pau (not present)
Pradeepto (not present)
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Meetings (3 scheduled, hallways)
    • Some bit of work on the Language Portal
  • চলমান কাজ:
    • More work on the portal as per Pau's recommended design (File:Sketch_for_the_language_portal_page.png)
    • Prepare message delivery list for the next phase of the wikis
    • Publish the blog
    • ((Travel to Portland. They are charging for the bags!!))
    • Attend OSBC day 1
  • প্রয়োজন:
സന്തോഷ് (Santhosh)
Siebrand
  • Done:
    • Following deployment, yay
  • Will do:
    • Prepare ULS comms for enwiki and have it checked by Howie
  • Need:

Stand-up meeting 2013-05-17 (14:00 UTC)

[edit]
आलोलिता (Alolita) (not present)


אמיר (Amir)
Niklas
  • Tein:
    • Bit of event logging during the weekend
    • ULS
    • A bit of the main page
    • Continued my efforts to get my patches reviewed
  • Teen:
    • GSoC meeting
    • Late Engineering and TechOps Projects and Deployment Review Meeting
      • discuss ULS for anons
    • ULS deployment Phase 2
    • Main page
  • Tarvin:
Pau (days off)
রুণা (Runa)
  • সমাপ্ত কাজ:
  • চলমান কাজ:
    • More meetings
    • Language Portal update and possible meeting about it
    • ((Last day at the office for this trip))
    • Update mingle cards
  • প্রয়োজন:
    • go-ahead for the blog post (its shared)
    • phase 3 wiki list
    • ((TZ difference with everyone else is very disorienting)) :)
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
    • some socializing in bugzilla
    • investigated the IE8->IE7 issue.
    • Fixed blacklisting for old browsers
    • Updated jquery.i18n, jquery.uls to upstream(for fxing some other bugs)
    • ((wrote documentation for ULS,IME in ml wikipedia))
    • send updated task list to interview candidate
    • did expense report
  • ചെയ്യും:
    • if possible do something else - TWN tasks
  • വേണം:
    • No more bug fixes, new stuff! ;)
Siebrand
  • Done:
    • twn support, exports, updates.
    • ULS triage. Wrote email in IE8 compat thread on engineering@, but it's not getting delivered. See needs below.
    • i18n/L10n code review
  • Will do:
    • Communication ULS stage 3 and 4.
  • Need:
    • WMF email needs to work. It's been down for more than 16 hours

Stand-up meeting 2013-05-14 (14:00 UTC)

[edit]
आलोलिता (Alolita) (not present)


אמיר (Amir)
  • עשיתי:
    • ULS bugs
    • Interview
    • bug triage: migrated or closed all WebFonts bugs and all Narayam bugs but two
    • Cucumber
  • אעשה:
    • Cucumber
    • Meeting about Arabic Webfonts
  • צריך:
    • Time for mobile meeting that would be good for Pau, Or and Yuvi (emailed)
Niklas
Pau (not attending)
  • Fet:
  • A fer:
    • Take a couple of days off at Slovakia
  • Necessitats:
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Meeting with Philippe about communication
    • Triaging all webfonts and narayam bugs.
    • Email backlog
    • Pending tasks related to requests from QA on gerrit
    • Met more people
  • চলমান কাজ:
    • More meetings today
    • Blog post for sprint 43
    • Communication set up for the phase 2 wikis - all pending work (all done I think, but won't hurt to double check - starting inventory for phase 3 would be useful)
    • (figure out how the table lamp works)
      • There's a tiny little knob that looks like a screw. Turn it clockwise.
  • প্রয়োজন:
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
    • Thursday night meeting with interview candidate
    • GSOC 1:1
    • ULS bug fixes
  • ചെയ്യും:
    • weekend
  • വേണം:
Siebrand
  • Done:
    • EventLogging for ULS with Pau and Niklas
    • Team interview with job candidate
    • Some ULS bug triage. Asked Andre Klapper to look at one specific bug, and removed LangEng people from the issue.
    • Code review for ULS/TwnMainPage/Translate
  • Will do:
    • twn exports, support, code review and more
  • Need:

Stand-up meeting 2013-06-13 (14:00 UTC)

[edit]
आलोलिता (Alolita) (not present)


אמיר (Amir)
  • עשיתי:
  • אעשה:
    • Cucumber
    • Interview
  • צריך:
    • The CAPTCHA fix should be merged. It doesn't stop me from doing any other cards, but it gets in the way of creating accounts.
      • Team was not able to reach a decision on how to go forward on this. Let's try again tomorrow.
Niklas
  • Tein:
    • Office hours
    • General CR
    • ULS CR
    • Poking people to get my patches reviewed
  • Teen:
    • Perhaps something about TranslationStash
    • Weekly interview
  • Tarvin:
    • Somewhat blocked on many tasks (not many to choose)
      • schema event logging (knowledge transfer, meeting scheduling) -> scheduling for tomorrow
      • twn newsletter: need to be written first ;)
      • gsoc: time based
      • uls deployment: time based
      • main page (partially): cr, designs
Pau
রুণা (Runa)(not attending)
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
    • default font for tamil is 'system' font
    • Updated Lohit tamil fonts to latest versions
    • Explained the font specification to Kartik
    • Added Linux Libertine and UnifrakturMaguntia to uls
  • ചെയ്യും:
    • gsoc 1:1 meeting
    • weekly meeting tonight
  • വേണം:
    • technical ambassadors is must for each language <- explain?
Siebrand
  • Done:
    • Archived team etherpad to monthly pads.
    • ULS comms:
      • VP messages on 10 wikis done
      • Updated announcement and FAQ
      • Sent out translation notifications for the announcement for the 10 languages in question, as well as an additional request to ensure that the UI is translated at translatewiki.net.
    • Arranged for a last minute Certified Scrum Product Owner training next week Thu/Fri. I don't think I can cut down on any tasks in the sprint, so now 50%+ overcommitted in planning even... (64 instead of 40 hours planned this sprint)
    • Code review and ULS related discussions, created a few issue reports for ULS.
  • Will do:
    • Weekly
    • As much as I can.
  • Need:
    • Clarity on if we're going to continue trying to use Google Hangout as persistent team chat instead of Skype. What are your thoughts?
      • I support. I want to stop using skype
      • hangout is not a replacement. Other alternatives?

Stand-up meeting 2013-06-12 (14:00 UTC)

[edit]
आलोलिता (Alolita) (absent)


אמיר (Amir) (SCRUM master training)
Niklas
  • Tein:
    • GSoC meeting on Monday evening
    • ULS CR
    • ULS phase 2 patch
    • MainPage - fixing images and crashing for IE
  • Teen:
    • Office hours
  • Tarvin:
    • Hotels...
Pau
  • Fet:
    • Translation prototype
    • Design meeting about AMS hackathon
    • shaved
  • A fer:
    • Design meeting: content translation
    • office hours
    • Designs for user's sandbox
  • Necessitats:
রুণা (Runa) (SCRUM master training)
  • সমাপ্ত কাজ:
    • Training day 1
  • চলমান কাজ:
    • Training day 2
    • Meeting with GSoC student
  • প্রয়োজন:
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
    • Bug 47977 Use Tipsy on "Language settings" tooltip
    • BUg 49380 Input settings - language selection cleanup
    • Bug: 49427 Scroll to viewport after input methods list is rendered
    • Bug 49447 IE8: text missing from ULS "Display language"
    • CR
  • ചെയ്യും:
    • rest of the cards
    • office hours(may be)
  • വേണം:
Siebrand
  • Done:
    • Nothing since sprint meeting
  • Will do:
    • Office hours
    • ULS communication
  • Need:

Stand-up meeting 2013-06-10 (14:00 UTC)

[edit]
आलोलिता (Alolita) (absent without note)


אמיר (Amir) <in the office>

  • עשיתי:
    • email catching up
    • a useful conversation with James about VE internationalization
    • bits of code review and bug fixing (core, Echo, AFTv5)
    • learning Cucumber
    • Talked to Moriel about how to use ULS in VE
  • אעשה:
    • Twn main page RTL testing
    • Cucumber
  • צריך:
    • Twn main ready for RTL testing?
Niklas
  • Tein:
    • ULS code deployment (hurrah)
    • Cursing
    • Code review / fixing own commits / simple bugs
    • Cursing
    • Main page browser testing
    • Cursing
  • Teen:
    • GSoC meeting
    • Sprint stuffies
    • ULS deployment
    • No cursing
  • Tarvin:
    • Working tools and help from ops so that they do not need to complain later when stuff breaks
Pau
  • Fet:
    • Testing ULS
    • Content translation prototype
  • A fer:
    • Content translation prototype
    • Sprint meetings
  • Necessitats:
রুণা (Runa)
  • সমাপ্ত কাজ:
    • (( arrived at SFO ))
  • চলমান কাজ:
    • Finish the pending work from Friday and any other remaining cards
    • Get introduced to people at the office
    • work with Amir on the cucumber tests
  • প্রয়োজন:
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
    • ULS bugs
  • ചെയ്യും:
    • sprint meetings, watch ULS going live, work on issues any
  • വേണം:
    • 2 ULS patches in review queue
Siebrand
  • Done:
    • twn support/exports, code review, ULS
  • Will do:
    • New sprint, ULS
  • Need:
    • Running into issues with getting Solr changes needed for reenabling of TTMServer on Wikimedia again
    • Gerrit is very problematic at the moment, being restarted multiple times a day for maintenance, and requiring a restart multiple times a day, because the interfacing with Jenkins get stuck.
    • Where are we on moving team chat to Google Hangout?

Stand-up meeting 2013-06-07 (14:00 UTC)

[edit]
आलोलिता (Alolita) (not present)


אמיר (Amir)(Working from Office)
Niklas
  • Tein:
    • Watched TED talks etc on queue
    • Checked waymarked-trails export on twn
    • Wikimania registrations
    • More inbox cleanup
  • Teen:
    • Hopefully have a weekend
    • ULS deployment on Monday
    • GSoC meeting on Monday
  • Tarvin:
    • Unable to work, patches not getting tested or merged, filed a bug and email engineering-l – there are many ULS patches waiting
Pau
রুণা (Runa)
  • সমাপ্ত কাজ:
    • (Reached Mumbai, flight is delayed)
    • Weekly meeting
  • চলমান কাজ:
    • Remaining cards
    • Try to set up a meeting with the GSoC candidate. Meeting was cancelled earlier due to conflicting travel schedules
    • Complete the ULS installation - local
    • Update the GSoC page
    • Send out the translation request for the ULS announcement to the translators-l list
  • প্রয়োজন:
    • Phase 2 wiki communication -
      • should this be drafted out in the same format as the phase 1 wiki (including VP spam)?
    • Any special format etc that may be required for translation requests sent to the translators-l list?
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
    • more bugs
    • booked flight tickets for wikimania
    • some pet stuff since I am AFK during weekend
    • ULS patches did not get merged because of gerrit out of office.
  • ചെയ്യും:
    • bugs or remaining cards for sprint
  • വേണം:
Siebrand
  • Done:
  • Will do:
  • Need:

Weekly Team Meeting 2013-06-06 (1700-1800 UTC; 10:00 - 11:00 PDT)

[edit]

Sprint Highlights, Major Deliverables, Blockers, Deployment

[edit]

Santhosh [5 mins]

Lots of unplanned activity in this sprint

ULS update

[edit]

Code check - freeze, bug fixes, blockers - Santhosh [5 mins]

All bugs addressed, waiting in gerrit for CR, no major blockers

Communications check - update - Runa [5 mins]

  • Communication sent to:
    • VPs
    • Blog
    • Meta-Wiki
    • Mailing lists

Testing / GWT test session - update - Runa [3 mins]

Deployment - Niklas [2 mins]

Translatewiki Home Page

[edit]

Update - Niklas [3 mins]

  • Spent some time at the beginning of the sprint
  • Some patches in Gerrit
  • Overflows to next sprint

Content translation requirements update

[edit]

Update: Pau [5 mins]

GSoC update

[edit]

Update - Runa [5 mins]

  • Mentor updates - [1. Communication plan with student, 2. Any blockers]
    • Amir:
    • Niklas: Scheduled first meeting for Monday
    • Santhosh: After June 11
    • Runa: Meeting had to be postponed due to travel schedule of student and mentors

Hiring update

[edit]

Candidate update - Alolita [2 mins]

  • Niklas and Santhosh interviewed a candidate today
  • 2 other interviews did not happen.

Other notable items

[edit]

[10 mins]

- Hong Kong Wikimania 2013 team meetings + participation

https://docs.google.com/a/wikimedia.org/spreadsheet/ccc?key=0Ar8ziwjAnNjWdGluVEs5YXN6cl9vaThMUVBHdTN1WUE&usp=sharing

--- in that spreadsheet please add my name too(santhosh)

Things to do at HK

  • Brainstorming for content translations
  • Retrospective & brainstorming for comms (and other things?)
    • Testing prodecures and writing code for testing
  • Discuss our roadmap
  • (Runa is allowed to do Belbin with Santhosh)
  • Knowledge transfer between team members ()

- Travel: Runa, Amir at WMF SF June 10-23

- Travel: Alolita at TEDGlobal UK June 8-15

- Vacation plans for July - please send Alolita tentative plans by June 24.

- Expense reports are due by June 15. Submit your expense reports asap.

Annual Reviews

[edit]

[5 mins]

Thanks everyone for doing your goals, self assessments and colleague feedback!

Reviews for folks reporting to Alolita will be done in the week of June 24-28.

Questions, Comments, Discussion

[edit]

Team - [5 mins]

Stand-up meeting 2013-06-06 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
    • ARs, 1:1s, ULS, Onboarding, Hiring, Meetings
  • मैं करूँगी:
    • Team meeting, Metrics Meeting, AR meetings, Hiring followup, Amir in SF
  • मुझे चाहिए:
אמיר (Amir)
  • עשיתי:
    • Planes, Trains and Automobiles
    • Björk in Hollywood <- met her? Seen her perform, what? Exciting!
  • אעשה:
    • Travel to SF
    • Complete reviews
  • צריך:
Niklas
  • Tein:
    • Interview
    • Working with Siebrand
    • Spring cleaning of my inbox
  • Teen:
    • review uls
    • weekly
  • Tarvin:
Pau
  • Fet:
    • ULS patchset review
    • Started content translation prototype
  • A fer:
    • Meetings: design and weekly
    • More work on prototype
  • Necessitats:
রুণা (Runa) (travelling)
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
    • 1:1
    • ULS bug fixes(no major bugs in bugzilla)
    • tech interview
  • ചെയ്യും:
    • get the reviews done for the patches (9)
    • weekly
  • വേണം:
Siebrand
  • Done:
    • Travelled to Helsinki, flying home Fri evening.
    • Solr performance optimisations for Translate (and probably also for geo for Mobile)
  • Will do:
    • Not available rest of Thrusday and Friday. Have to use weekend to do a lot of administrative catchup (AR/ER)
    • Getting a new bed after 5 months of waiting on Sat.
  • Need:

We will start piloting Google Hangouts for persistent chat.

Stand-up meeting 2013-06-05 (14:00 UTC)

[edit]

Guest: Antoine Musso (muted).

आलोलिता (Alolita)
  • मैंने किया: ARs, 1:1s, ULS, Hiring, Meetings
  • मैं करूँगी: ARs, 1:1s, ULS, Onboarding, Hiring, Meetings
  • मुझे चाहिए:
אמיר (Amir) (travel)
Niklas
  • Tein:
    • 1:1
    • Annual reviews late night and this morning
    • Requested deployment window for Monday
    • Slept
  • Teen:
    • Interview
    • Working with Siebrand
  • Tarvin:
Pau
  • Fet:
  • A fer:
    • Content translation prototype
  • Necessitats:
রুণা (Runa)
  • সমাপ্ত কাজ:
    • uls bug report sent
    • peer reviews completed
    • helped Siebrand send out the announcement to the VPs
    • meeting with Alolita
  • চলমান কাজ:
    • FAQ page
    • Portal page
    • Preparations for travel
  • প্রয়োজন:
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
    • browser testing with Kartik and Pradeepto(y'day night)
    • ULS bug fixes(unplanned sprint activity)
    • completing annual review
  • ചെയ്യും:
    • 1:1 with Alolita
    • Rest of TWN main page cards.
  • വേണം:
    • Please flag any ULS bugs to be fixed, otherwise I will continue with planned cards in sprint
    • Can runa test the bug fixes?(to avoid regressions too)
      • Do another test session on Monday? We can go through 3 combinations in 1 hour per person now, I think? I think this is also useful input for the GO/NOGO meeting I have with Alolita on Monday.
Siebrand

Stand-up meeting 2013-06-04 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
    • GSOC mtg
    • ARs
    • 1:1s
    • ULS followup
  • मैं करूँगी:
    • ARs
    • 1:1s
    • ULS followup, prep
  • मुझे चाहिए:
אמיר (Amir)
  • עשיתי:
    • ULS testing
    • code review
    • packing
    • A little discussion about testing with Željko
  • אעשה:
    • Offline until Thursday
  • צריך:
Niklas
  • Tein:
    • gsoc meeting
    • ULS fixing
    • ULS testing
  • Teen:
    • Annual reviews (as much as I can)
    • 1:1
    • MainPage testing
  • Tarvin:
    • EventLogging meeting time
    • There is still a chance to make a bunny happy
Pau
রুণা (Runa)
  • সমাপ্ত কাজ:
    • ULS testing - 1st round
    • Meeting with the GSoC students and mentors
  • চলমান কাজ:
    • ULS testing - 2nd round
    • Setting up ULS on the local system
    • Meeting with Alolita and Siebrand about the communication plan
    • 1 x 1 with Alolita
    • Peer review for requests received
  • প্রয়োজন:
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
    • gsoc meeting
    • bug fixing, reviews
    • Language selector for signup form(TWN Mainpage)
    • wrote annual goal. self review and review for 5 colleagues
  • ചെയ്യും:
    • rest of the review stuff
    • GWT testing meeting- need briefing on what exactly we are going to do(2 hours at night) - document shared with the test cases
    • Note: since I am spending more time on ULS, TWN Mainpage tasks get low priority.
  • വേണം:
Siebrand
  • Done:
    • ULS, ULS, ULS
      • 9 issues fixed today
      • 10 or so identified in testing; none critical as far as we can tell, it seems, but definitely things that need fixing (inconsistent state between triggers)
    • Code review
  • Will do:
    • More ULS
      • Triage
      • Test
      • Communication
    • Receive the new goodie I ordered
    • Annual review
  • Need:
    • Bugs found in 1st round of testing reported, so they can be triaged and worked on tomorrow.
    • Deployment plan change. Request lightning deployment window for Monday. Niklas to email GregG.

Stand-up meeting 2013-06-03 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
    • ULS followup
    • Review ULS documentation
    • AR goals
  • मैं करूँगी:
    • AR meetings, goals, peers, self-review
    • GSoC meeting
    • ULS rollout checks
    • HR interviews followup
  • मुझे चाहिए:
אמיר (Amir)
  • עשיתי:
    • "Apply settings" - fix committed
    • Code review for Santhosh's commits
    • Started the annual review work
    • Learning Cucumber
  • אעשה:
    • Learning Cucumber
    • Manual testing of ULS
    • GSOC meeting
    • Packing
  • צריך:
Niklas
Pau
রুণা (Runa)
  • সমাপ্ত কাজ:
  • চলমান কাজ:
    • ULS FAQ document
    • Meeting this evening
    • Mingle cards
    • Communication plans for tomorrow - discussion with Siebrand
  • প্রয়োজন:
    • Community and Outreach activity report for the Engineering monthly report?
    • Peer review - no mails received to seek peers
    • How do I delete a page on mediawiki.org? (UniversalLanguageSelector/FAQ ) - DONE
    • Beta is sometimes unreliable
സന്തോഷ് (Santhosh)
Siebrand
  • Done:
    • Prepared comms for phase 1 rollout. Have to discuss with Runa how to communicate tomorrow. Ready for translation.
    • Code review
    • twn support, imports/exports, etc.
    • Annual review review requests
  • Will do:
    • More ULS comms
    • Code review
  • Need:

Stand-up meeting 2013-05-31 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
    • Team Meetingkart
    • Talk prep
    • Fluent conference prep
    • Meeting with Jimmy
    • Followup - for annual reviews, contracts, oDesk
    • ULS Deployment discussion with release eng - all ok
  • मैं करूँगी:
    • Deployment update for Greg
    • Monthly status report update
    • 1:1
    • W3C followup
    • Care Bear meeting
    • Review comm plan
    • Localization hackathon in Silicon Valley (participate if I have time)
  • मुझे चाहिए:
אמיר (Amir)
  • עשיתי:
    • dentist
    • met Bishakha from the WMF board
    • GSOC: initial discussion about lang support in VE
    • code review Santhosh's patches
  • אעשה:
    • finish code review
    • fix Apply settings
  • צריך:
Niklas
  • Tein:
    • Weekly
    • Working on the main page for logged out users story (temporary storage of translations)
    • Read LWN weekly (and pasted interesting article about font licensing to team chat)
  • Teen:
    • Help with ULS as needed
  • Tarvin:
Pau
রুণা (Runa) (not present)
സന്തോഷ് (Santhosh) (not present)
Siebrand
  • Will do:
  • Need:

Weekly Team Meeting 2013-05-30 (1700-1800 UTC; 10:00 - 11:00 PDT)

[edit]

Sprint Highlights, Major Deliverables, Blockers, Deployment

[edit]

We have a new sprint!

Update - Amir, Siebrand [5 mins]

  • ULS: "pretty much everything is done"- Bug fixing going on.
  • TWNMainpage: Niklas started working
  • Testing - Amir to learn Cucumber
  • MLEB released - yay!

ULS update

[edit]

Code check - are we on target for code freeze on Monday June 3 - Santhosh [5 mins]

  • just 2 major issues in bugzilla, both in progress or waiting for review
  • will do another round of testing/code check tomorrow too
  • https://bugzilla.wikimedia.org/show_bug.cgi?id=48203 need some more investigation. Cog icon not appearing for anon users on random pages in beta. Santhosh has a patch, but Niklas doubts some other reason. Chris MacMahon commented it affects automated testing too.

Communications check - update - Runa [5 mins]

  • Communication for phase 1 wikis - need to check with Siebrand on this
    • Text to be written based on the ULS blog post [RB]
    • FAQ text/page [RB]

Test development - update - Runa, Amir [3 mins]

  • Manual tests - Runa will ping 3 volunteers to help out

Deployment readiness - Niklas [2 mins]

  • working on the last remaining high priority bugs
  • do we have ok/nok from ops? -yes from ops and platform

GSoC update

[edit]

Update - Runa [5 mins]

Content translation requirements update

[edit]

Update: Pau [5 mins]

  • Planning for creating the prototypes done.
  • selected Wiki pages as example: Curiosity (rover), Dharamsala, Queen (band), Ludwig Mies van der Rohe

Communications update

[edit]

Improving participation in outreach events - office hours, bug triages, maven sessions - Team Discussion led by Runa [10 mins]

Some ideas:

  • Take note of request that we get and add them to our next event agenda (+ ask the interested people to join)
  • Allow people to add events in their calendar. Example: https://developers.google.com/live/
  • Consider a mixed dev event: a bit of bug triage, a bit of office hours, a bit of announcements.

Hiring update

[edit]

Kartik and Pradeepto will be joining next week. Onboarding in progress.

Current candidate update - Alolita [2 mins]

Other notable items

[edit]

[8 mins]

- We are now officially members of Ecma and participating in the i18n workgroup [not yet in http://www.ecma-international.org/memento/NFP.htm though?]

- Expense reports are due by June 15. Submit your expense reports asap.

- Hong Kong Wikimania 2013 team meetings + participation

https://docs.google.com/a/wikimedia.org/spreadsheet/ccc?key=0Ar8ziwjAnNjWdGluVEs5YXN6cl9vaThMUVBHdTN1WUE&usp=sharing

- Other travel coming up

- Runa, Amir at WMF SF June 10-23

- Alolita at TEDGlobal UK June 8-15

- Niklas unlikely to go to Spain in July

=== Annual Reviews == [5 mins]

Dates for our team:

By June 3: Everyone submits 3 names of peers to provide feedback on your review.

  • Has anyone seen instructions where and how to submit these?

June 4 by 7pm PDT: Everyone does their self review (HR will send this link out), draft goals for next year, complete 360 peer feedback from 1-5pm PDT.

June 6-7: All info will be collated by HR and provided to Alolita (manager)

Week of June 24-28: Alolita does manager's 1:1 review with each team member

Questions, Comments, Discussion

[edit]

Team - [5 mins]

Stand-up meeting 2013-05-30 (14:00 UTC)

[edit]
आलोलिता (Alolita) (may not be able to join but will see everyone at team meeting)
  • मैंने किया:
    • Paperwork
    • Hiring followup
    • Talk prep
    • Annual review planning
    • Bug triage
    • ULS Communications followup w Howie
    • Travel prep for Amir and Runa
  • मैं करूँगी:
    • Team Meeting
    • Talk prep
    • Fluent
      • ?
    • Meeting w JW
      • Jay? Jimmy?
  • मुझे चाहिए:
אמיר (Amir)
Niklas
  • Tein:
    • General code review
    • Bug triage
  • Teen:
    • Weekly
    • More code review
  • Tarvin:
Pau
  • Fet:
    • Bug triage
    • Translate mobile app meeting
    • Prototyping planning
  • A fer:
    • General prototype
  • Necessitats:
রুণা (Runa) (Not in the daily today)
  • সমাপ্ত কাজ:
    • Blog post sent for review
    • Bug Triage
  • চলমান কাজ:
  • প্রয়োজন:
    • Please make any changes to the blog post that you feel necessary. Waiting on me may delay things as I will be traveling.
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
    • Bug Triage meeting
    • CR
    • ULS bugs
      • Avoid setting inline style for the element when reset applied
      • If the ULS position is interlanguages, always add dummy language links
  • ചെയ്യും:
    • weekly team meeting
    • tech interview
    • remaining stuff
  • വേണം:
Siebrand(not attending)

Stand-up meeting 2013-05-29 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
    • Sprint planning meetings
    • 1:1s
    • Hiring followup
    • Travel planning for Amir + Runa
    • Annual review planning
  • मैं करूँगी:
    • Paperwork
    • Hiring followup
    • Talk prep
    • Annual review planning
    • Bug triage
  • मुझे चाहिए:
אמיר (Amir)
  • עשיתי:
    • 1:1
    • Helped Runa plan the travel.
    • GSOC:
      • Reviewed a VE RTL fix by Moriel in with the help of test scenarios I wrote a few months ago. It was merged by Roan.
      • More mentoring about "community bonding" with both the MW dev community and the Wikipedia editors community, and the current state of RTL VE bugs.
    • MLEB testing done.
    • Started moving ULS auto-scrolling code upstream to Milkshake (task 3058).
  • אעשה:
    • Bug triage.
    • Finish MLEB release - see needs.
    • Thursday morning - dentist.
    • Finish moving ULS auto-scrolling code upstream to Milkshake (task 3058).
    • Thursday afternoon - mobile mentoring.
    • Probably more GSOC mentoring.
  • צריך:
    • Decision whether to fix the "Apply settings" issue for the MLEB release.
Niklas
  • Tein:
    • 1:1
    • gave a review for mleb rel notes
    • added new story card to this sprint
    • some mainpage tasks
    • submitted expense report
  • Teen:
    • bug triage
  • Tarvin:
Pau
রুণা (Runa)
  • সমাপ্ত কাজ:
    • GSoC Meeting invitations sent
    • Meeting with Pau to clarify a few points about the Language Portal review
    • 1 x 1 with Alolita
  • চলমান কাজ:
    • Blog post sprint 42
    • Rewrite the ULS announcement blog based on the reviews made by Pau
    • Bug Triage event
    • Set up ULS on my local machine
  • প্রয়োজন:
സന്തോഷ് (Santhosh)
Siebrand
  • Done:
    • Sprint meetings, etc.
    • Reviewed MLEB release notes
  • Will do:
    • ULS deployment communication preparation
    • Bug triage
    • twn exports
  • Need:

Stand-up meeting 2013-05-27 (14:00 UTC)

[edit]
आलोलिता (Alolita) (holiday)


אמיר (Amir)
  • עשיתי:
    • upcoming travel planning with Alolita
    • meeting with C&Z about testing
    • 3185: Remove the checkbox from the Font settings - merged
    • Updated the design of Language_portal a bit
    • Updated ULS GWT scenarions in mediawiki.org
    • 3175: Input method list is displayed under the wrong language button - committed
    • code review
    • started MLEB release notes
  • אעשה:
    • uls panel scrolling fixes
    • go on with MLEB
  • צריך:
Niklas
  • Tein:
    • Back home from hacking
  • Teen:
    • Rest for tomorrow
  • Tarvin:
Pau (traveling)
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Bug Triage prep - all done
    • LCM first round of content is now in github. Depending upon project implementation plans, the next set of contents will be committed.
    • Reviewed the LCM dashboard design document sent by Pau - nothing looks to need a change for now
    • Display and input scenarios verfied - based upon the changes proposed
  • চলমান কাজ:
    • Explore the new bugs that seem to have creeped in for the input settings
    • Remaining cards - maven handbook content, communication strategy
  • প্রয়োজন:
    • Notification to phase 1 and phase 2 wikis - Siebrand was writing some document last sprint. Not sure if it has to be based on that.
സന്തോഷ് (Santhosh)(going out, might miss the daily, If I am not returning on time)
  • ചെയ്തു:
    • Get the saved font using the fontSelector defined in mw.webfonts.setup (Merged)
    • Remove document from anon cover function (Merged)
    • Update linktrails for Hindi and Odia(core)(in review)
    • CR
  • ചെയ്യും:
    • CR, meetings
  • വേണം:
Siebrand (taking it easy)

Stand-up meeting 2013-05-24 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
    • Hiring, Interviews, Contracts followup
    • Content translation for RTL communities - Education group
    • RedHat Language Summit followup
  • मैं करूँगी:
    • Weekly emgmt meeting
    • Talk prep
    • GSoC followup
    • Recruiting front-end devs at JS conference
  • मुझे चाहिए:
אמיר (Amir)
  • עשיתי:
    • first TLV hackathon, organized mostly by myself, much better than I expected it would be \o/
    • closed a couple of ULS bugs
  • אעשה:
  • צריך:
    • clarity about ime preferences in ULS - need to discuss it with Santhosh
Niklas(at AMS hackathon)
  • Tein:
  • Teen:
  • Tarvin:
Pau(at AMS hackathon)
  • Fet:
  • A fer:
  • Necessitats:
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Put the manual testing scenarios in a google doc. A Google form is inadequate.
    • Meeting with Alolita and RH team about language summit etc
  • চলমান কাজ:
    • Language Matrix document - review
    • Display settings and input settings test scenarios
  • প্রয়োজন:
    • bug 48533 - seems to have a problem. Does it need more work? (Santhosh)
സന്തോഷ് (Santhosh)
Siebrand (at AMS hackathon)
  • Done:
  • Will do:
  • Need:

Stand-up meeting 2013-05-23 (14:00 UTC)

[edit]
आलोलिता (Alolita) - (Could not join)
  • मैंने किया:
  • मैं करूँगी:
  • मुझे चाहिए:
אמיר (Amir)( hackathon)
  • עשיתי:
  • אעשה:
  • צריך:
Niklas(traveling)
  • Tein:
  • Teen:
  • Tarvin:
Pau(traveling)
  • Fet:
  • A fer:
  • Necessitats:
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Manual testing scenarios
  • চলমান কাজ:
    • Putting the testing scenarios into a form
    • Review the display and input test scenarios
    • Maven program communication strategy document
    • Bug triage event notification
  • প্রয়োজন:
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
    • Bug 48703 - Multiple continous API requests
    • Reset the dirty bit after preferences are saved.
    • Filter group from Special:LanguageStats when group is not a priority language
  • ചെയ്യും:
    • CR(github, gerrit)
  • വേണം:
    • CR
Siebrand(traveling)
  • Done:
  • Will do:
  • Need:

Stand-up meeting 2013-05-22 (14:00 UTC)

[edit]
आलोलिता (Alolita)(not attending)


אמיר (Amir)
  • עשיתי:
    • code review
    • positioning and scrolling near the cog - need to test with the latest patches
    • disabling ULS for people without JS
    • tipsy with weird uselang - amended
    • 1:1
  • אעשה:
    • Hackathon Tel-Aviv.
  • צריך:
Niklas
Pau
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Language portal - proof of concept sent to Pau
    • Blog sent for publication
    • 1 x 1 with Alolita
  • চলমান কাজ:
    • Manual testing plan
    • Reply to Pau's review
  • প্রয়োজন:
    • Any changes that need to be flagged for the testing scenarios (Pau and Santhosh)
സന്തോഷ് (Santhosh)
Siebrand (not attending)

Stand-up meeting 2013-05-21 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
    • Class all day
    • Google India
    • Contracts + Hiring followup
  • मैं करूँगी:
    • 1:1s
    • Interview with candidate
    • Follow-up on ULS development + testing
    • i18n talk at IMUG (followup to see if released video?)
  • मुझे चाहिए:
אמיר (Amir)
Niklas
  • Tein:
    • Completed non-translator signup task
    • Interview
    • Small things, responding to emails, bugs, questions on mw.org and little bit of code review
    • ((( Cycled around 40 km )))
    • ((( Cooking filled lettu )))
  • Teen:
    • Hit publish for blog post
    • TODO:
      • Special:TranslateSandbox task
      • Language fallbacks patch review ongoing
      • twn housekeeping
      • gsoc comms?
    • Hackathon coming soon!
  • Tarvin:
Pau
রুণা (Runa)
  • সমাপ্ত কাজ:
  • চলমান কাজ:
    • Manual test plan : card 3188
    • Publish the blog post
  • প্রয়োজন:
    • Blog post signoff
    • Review of the bug list (there is also a list of bugs that can probably be closed)
    • Link to Alolita's talk at i18n mug/adobe
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
    • investigated https://bugzilla.wikimedia.org/show_bug.cgi?id=45958, tried RL and API, posted question in bugzilla to Krinkle about approach
    • Addressed some CR, fonts for Syriac language added
    • Allow ULS language settings accessed from user preference screen.- after reverting second preference for ULS ime
  • ചെയ്യും:
    • 1:1 with Alolita
    • more cards
  • വേണം:
Siebrand(not attending)

Stand-up meeting 2013-05-20 (14:00 UTC)

[edit]

आलोलिता (Alolita) - (can't join standup today due to early meeting in SF)

  • मैंने किया:
    • Hiring followup
    • Contracts, interviews followup
    • Content translation document review
    • Reviewed ULS test scenarios
  • मैं करूँगी:
    • HR session all day today
    • Contracts
    • Candidate team meeting feedback awaited
  • मुझे चाहिए:
אמיר (Amir)

jquery.ime/pull/165 https://github.com/wikimedia/jquery.ime/pull/165]

Niklas
  • Tein:
    • Course is over, blog post coming soon (after review and fixes)
    • First review of the new language fallbacks patch
    • Test and review of ULS fixes
    • Working on the developer signup feature for the main page
  • Teen:
    • Interview
  • Tarvin:
    • Info for interview wbn
Pau
রুণা (Runa)
  • সমাপ্ত কাজ:
    • (sick day on friday)
    • mail
  • চলমান কাজ:
    • sprint 41 blog
    • bug day prep
    • interview
  • প্রয়োজন:
    • Amir's reply for the GSoC candidate
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
  • ചെയ്യും:
    • investigate bug 45958
    • rest of the cards
  • വേണം:
Siebrand (public holiday in NL; visiting family, not in daily)
  • Done:
    • twn support, exports
  • Will do:
    • Group interview at 17:00 UTC
  • Need:

Stand-up meeting 2013-05-DD (14:00 UTC)

[edit]
आलोलिता (Alolita) (absent without notification)


אמיר (Amir)
  • עשיתי:
    • sprint planning
    • not much today - had to take care of some medical stuff
    • started reviewing Santhosh's patches
  • אעשה:
    • review Santhosh's code
    • finish the patches that I started - "weird bubble" and auto-scrolling
  • צריך:
    • Siebrand: It would be nice if you could double-check that the tasks and the cards are all set properly and make sense, that there are no stray cards etc.
      • There are stray cards. Also see meetings in bfaofs, which I think we agreed not to to anymore (at Amir's request). Do stories have: epic story, priority, owner? Do tasks have: owner, estimation? Do stories have acceptance criteria and a narrative (only needed if there are not already bug reports that are (fairly) complete, etc.).
Niklas
  • Tein:
    • Kven-Finnish machine translation system
  • Teen:
    • Weekend
    • Interview
    • Write a report of the course (hopefully in a lbog form)
  • Tarvin:
    • Sunny weekend for cycling <- Have fun!
Pau
  • Fet:
    • Sprint meetings
    • Content translation talk with Alolita
    • Translate mobile app meeting
    • 1/2 introspection meeting with Product group
    • Keyboard icon for IME redesign
    • Several emails (responded to Praveen)
  • A fer:
    • 1:1 with Jared
    • Design team review
  • Necessitats:
রুণা (Runa) (visa and fever)
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
    • sprint meetings & weekly meeting
    • Wikimania talk with Niklas accepted
    • For review
      • Simplify the language settings display
      • Cog icon can be used to close the language settings panel
      • Update jquery.ime from upstream
      • Remove redundant focus handler
      • Provide disable input tools option in IME menu
      • Display notification when disabling input methods from keyboard icon menu
  • ചെയ്യും:
    • Rest of the cards(35 hours remaining)
  • വേണം:
    • Need to book wikimania tickets(self booking). So need confirmation on our plan at HK
Siebrand
  • Done:
    • Nothing but a bit of mail reading and 3 hours of meetings y'day evening.
    • got news that my grandmother died this morning. It was time for her and she deserved her rest after a long life (92). Still distracted me the whole day. Funeral is Wednesday.
    • Got news about accepted Wikimania session submissions.
      • Ask the developers: accepted
      • Wikimedia translation sprint: accepted
      • Supporting content translation: waitlisted (surprised!)
  • Will do:
    • Weekend work (twn support, exports, etc.). Raimond Spekking who does the daily MediaWiki exports is going to be on holiday for the next few weeks. Will have to take over that job from him.
  • Need:

Weekly Team Meeting 2013-05-16 (1700-1800 UTC; 10:00 - 11:00 PDT)

[edit]

ULS update

[edit]

Development update (bug fixes, refactoring, impact assessment etc) - Amir, Santhosh [5 mins]

UX Design updates for signoff from Howie - Pau [10 minutes]

ULS Test Scenarios - Runa [10 mins]

Communications Plan - Runa [2 mins]

Next steps, sign off - Alolita [3 mins]

There is extra time in ULS tasks intented to be used for refactoring.

Santhosh should have a look at the overall ULS architecture.

"our content translation tools will be integrated to ULS"

Content translation requirements update

[edit]

Walkthrough of major scenarios: Pau [5 mins]

Communications update

[edit]

Mavens program, Blog posts, Language Portal, Bug Triage - Runa [5 mins]

GSoC 2013 update

[edit]

Runa [5 mins]

Amsterdam hackathon update

[edit]

Siebrand [2 mins]

Activities, Projects list to accomplish walkthrough - Pau, Niklas [3 minutes]

Sprint Highlights, Major Deliverables, Blockers, Deployment

[edit]

We have a new sprint!

Siebrand [10 mins]

Added: mleb, tech interviews

Postponed: uls deployment

Hiring update

[edit]

Team interviews coming up with 1 candidate on Monday,

Technical interviews w 2 candidates - Alolita [5 mins]

Other notable items

[edit]

- Welcome back Santhosh! Good to have you back!

- Talks coming up:

-- TODAY iMUG: http://www.meetup.com/IMUG-Silicon-Valley/events/95269972/?action=detail&eventId=95269972 - Alolita

Questions, Comments, Discussion

[edit]

Team - [5 mins]

Stand-up meeting 2013-05-15 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
    • 1:1s
    • ULS followup (finalize Wed mtg time w Howie)
    • Hiring followup - contracts, paperwork
    • May 16 talk prep
    • Google-RedHat followup on Indic fonts
  • मैं करूँगी:
    • ULS syncup
    • Hiring followup - contracts, paperwork
    • Google IO starts today!
  • मुझे चाहिए:
אמיר (Amir)
  • עשיתי:
  • אעשה:
    • Finish the last task
  • צריך:
    • review for my patches to ULS
Niklas (following a course)
Pau
  • Fet:
    • Meeting with Vibha on ULS
    • 1:1 with Alolita
    • Updated ULS documentaccording to Vibha input
    • Meeting with Santhosh to update on ULs
  • A fer:
    • Prepare content translation overview
    • Review current ULS status
    • ULS walkthrough with Howie
  • Necessitats:
রুণা (Runa)
  • সমাপ্ত কাজ:
    • ((lost some hours in the morning due to power+wiring work in the building))
    • Meeting with Alolita
    • Maven program activities reworked
    • Some parts of the Language Portal
  • চলমান কাজ:
    • More updates to the Portal page
    • The setlang tests
    • Complete the additions to the github repo
    • Maven program communications
  • প্রয়োজন:
    • Confirmation about the (non)implementation of input method settings in Special:Preferences
Siebrand
  • Done:
    • translation rally follow-up (578/1000 euro paid now)
    • code review and patches merged
    • had 2 2 hour workshops earlier today not related to Wikimedia.
  • Will do:
    • ULS meeting
    • AMS hackathon meeting, will be deciding on the workshops during the hackathon
    • sprint end/start
    • 15 hour work day ahead with 8 hours of meetings (06:30-23:00). I don't really like it when days are this long.
  • Need:
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
    • catching up with the stuff
    • CR and some code cleanup(simpify language settings)
  • ചെയ്യും:
    • new sprint
    • (away for 2 hours at noon time)
  • വേണം:

Stand-up meeting 2013-05-14 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
  • मैं करूँगी:
    • 1:1s
    • ULS followup (finalize Wed mtg time w Howie)
    • Hiring followup - contracts, paperwork
    • May 16 talk prep
    • Google-RedHat followup on Indic fonts
  • मुझे चाहिए:
אמיר (Amir)
  • עשיתי:
    • non-tech interview
    • worked with Steven Loomis on CLDR fixes
      • a meeting with Runa about Mavens and testing
    • code review
    • mentored Praveen a bit on installing the Translate extension and fixing a ULS/IME bug
    • ULS positioning - partially fixed
  • אעשה:
    • remaining cards:
      • finish fixing ULS positioning and weird tipsy behavior
      • IE bug TUX
  • צריך:
Niklas
  • Tein:
    • Bilingual dictionaries, twol rules
  • Teen:
  • Tarvin:
Pau
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Interview
    • Discussion with Amir about some tasks for the Maven program;
    • Did some sketches for the Language portal redesign
  • চলমান কাজ:
    • Working on a draft page with the redesigned layout for the portal
    • 1 x 1 with Alolita
    • Couple of test scenarios for setlang
    • Update the mingle cards
  • প্রয়োজন:
Siebrand (not present)

Stand-up meeting 2013-05-13 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
    • ULS followup
    • Hiring followup
    • Interviews
  • मैं करूँगी:
    • ULS syncup
    • Hiring followup
    • Interviews
    • MariaDB meeting
  • मुझे चाहिए:
אמיר (Amir)
  • עשיתי:
    • task 3058 - Fix positioning issues when opening from cog - started
    • task 3070 - Cog icon appears misaligned with the text on the left - committed, needs review
    • addressed Niklas's comments about the IME preference
    • Git support for Runa.
    • Taxes stuff.
    • Code review.
    • Submitted some corrections to the Hebrew locale through the CLDR survey tool! It's still very weird and buggy, but hopefully some long-standing annoying mistakes will finally be corrected.
  • אעשה:
    • finish ULS tasks, start TUX tasks
  • צריך:
Niklas (in class)
Pau
  • Fet:
  • A fer:
    • Review CSS cog positioning by Amir
    • Explore ideas for ULS issue "IME feedback"
    • Add Content translation notes to document
  • Necessitats:
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Pushed all HIGHEST priority test cases to gerrit (thanks Amir)
    • ULS announcement blog updated (covered the primary point from the deployment plan + Niklas' suggestions)
  • চলমান কাজ:
    • Language Portal redesign
  • প্রয়োজন:
    • phase 1 deployment communication
    • Anything more needs to go in to the ULS announcement blog?
    • (Special:Preferences and setlang tests) : Pau
Siebrand (not present)
സന്തോഷ് (Santhosh) (on leave)

Stand-up meeting 2013-05-10 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
    • ULS followup
    • Hiring followup + Interviews
    • Catch up on email backlog
    • 1:1s
  • मैं करूँगी:
    • ULS signoff from Howie
    • Hiring followup + Interviews
    • Catch up on email backlog
  • मुझे चाहिए:
אמיר (Amir)
  • עשיתי:
    • not much today - attended a wedding
    • code review
    • 1:1
    • the ULS bug updates are very interesting
  • אעשה:
    • ULS bugs
  • צריך:

Niklas (traveling for Mother's day - might not attend)

  • Tein:
    • ((( Had day off )))
    • ((( Had a meeting WMF+twn+Apertium+OmegaWiki )))
    • Got confirmation for the Apertium course
      • Course language is mostly English
      • There might be a dinner on Wednesday
      • I prolly work in Finnish-Kven language pair
    • Had a content translation meeting with Pau (good stuff)
    • Prepared ULS deployment phase 1 config
  • Teen:
    • Start reading the material for Apertium course
    • 2 TUX tasks
    • Language fallback patch
    • Given that lectures end at 1700 UTC+3, I do not know if I am able to attend dailies next week.
  • Tarvin:
    • Something that would be nice to experiment with: compiling nginx with mod_spdy and mod_pagespeed (both are Google originated additions that should improve speed)
Pau
  • Fet:
    • Content translation meeting with Niklas
    • Cucumber test scenarios
    • More ULS design explanation by email
  • A fer:
    • More design emails
    • ULS walkthroug meeting
    • Hackathon meeting
  • Necessitats:
রুণা (Runa)
  • সমাপ্ত কাজ:
  • চলমান কাজ:
    • Push the highest priority items into gerrit
    • ULS blog post
    • Update the mingle cards
  • প্রয়োজন:
    • Confirmation on the bug-triage date move
    • The Maven meeting can't happen during this sprint. Responses did not come through. Can we (Runa and Pau) defer the card? I can send a separare mail to get some momentum about the usability tests.
Siebrand
  • Done:
    • Disabled AdSense on translatewiki.net. Thanks for clicking ads! \o/
    • Lots of L10n/i18n review and fixes
    • Fixes for TwnMainPage repo https://gerrit.wikimedia.org/r/#/q/status:open+project:mediawiki/extensions/TwnMainPage,n,z
    • It appears that by now both Erik and Howie have not raised any blockers for phase 1 deployment. There is still no sign from Greg or Robla. This means that we have to conclude that deployment plans have to be pushed forward 1 week because of missed deadlines.
    • I have missed the deadline for preparing communication for phase 1. Have to do that during the weekend. There's some more room now (RB:I can help)
  • Will do:
    • Hackathon lunch meeting (21:00)
    • ULS walkthrough meeting (22:30)
    • Other weekend chores and tasks.
    • Will have low availability Mon-Wed. May miss the dailies, will most probably be online most of the day.
  • Need:
    • Okay from platform group on our deployment intentions,

Weekly Team Meeting 2013-05-09 (17:00 UTC; 10:00 - 11:00 PDT)

[edit]

Sprint Highlights, Major Blockers, Deployment

[edit]

Siebrand [5 mins]

ULS update

[edit]

Development update (bug fixes etc) - Amir [2 mins]

ULS Test Scenarios - Runa, Pau [10 mins]

Communications Plan - Runa [4 mins]

Impact assessment - CentralNotice (Translate) and ULS - Siebrand [2 mins]

Next steps, sign off - Alolita [2 mins]

Content translation requirements update

[edit]

Pau [5 mins]

GSoC proposals update

[edit]

Runa [5 mins]

Communications update

[edit]

Mavens program, Blog posts, Language Portal, Office Hours, Bug Triage - Runa [5 mins]

Amsterdam hackathon update

[edit]

Siebrand [5 mins]

Hiring update

[edit]

Team interviews/conversations with 3 candidates next week - Alolita [5 mins]

Other notable discussion items

[edit]

Red Hat followup on Language Summit Fall 2013 (targeted for Nov 2013 currently) - Alolita [2 mins]

Google dialog on Indic webfonts - Alolita [2 mins]

Adobe dialog on web fonts - Alolita [2 mins]

Talks coming up:

- TedGlobal 2013: Invited to participate in session on i18n, L10n and crowdsourced translations - Alolita [1 min]

- iMUG: http://www.meetup.com/IMUG-Silicon-Valley/events/95269972/?action=detail&eventId=95269972 - Alolita [1 min]

- Open Source Bridge 2013: [http://opensourcebridge.org/

sessions/954 http://opensourcebridge.org/sessions/954] - Alolita [1 min]

Scrum master training in June

[edit]

Amir and Runa will be in San Francisco for scrum master training. As discussed earlier with Siebrand, Amir and Runa, Siebrand will be also onboarding Runa and Amir for sprint planning the next couple of sprints. We will switch over to the new and shiny scrum master and sioux scrum master :-) after June 15.

Questions, Comments, Discussion

[edit]

Team - [5 mins]

WMF engineering members leaving (Peter Gehres, CT), joining (Jared - Director of UX)

Care Bear program

Stand-up meeting 2013-05-09 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैं&# 2344;े किया:
    • HR Training sessions (2 days - T&W)
    • ULS followup with Howie
    • Interviews and candidate followup
  • मैं करूँगी:
    • ULS followup with Howie, various teams (QA, Platform, Ops)
    • Candidate followup, team interviews scheduling
    • 1:1s
    • Review ULS test scenarios, deployment plan, bugs
    • Catchup on email, communications
    • Team meeting
  • मुझे चाहिए:
אמיר (Amir)
  • עשיתי:
    • code review for patches by Niklas - Translate, ULS, TWN main page
    • meeting with Pau about content translation
    • meeting about the mobile TWN app
  • אעשה:
    • attending a wedding tomorrow, so not sure about the daily
    • team meeting
    • more code review for code by Niklas (3 patches left)
    • ULS bugs
  • צריך:
Niklas (day off)
Pau
  • Fet:
    • Designs for Niklas cards
    • Content translation meeting with Amir
    • Mobile translate app meeting
    • Cucumber test definitions
  • A fer:
    • Complete detail for cucumber scenarios
    • 1:1 with Jared
    • Weekly meeting
    • Review ULS status and prepare walkthrough
  • Necessitats:
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Office hour
  • চলমান কাজ:
    • ULS test scenarios for the display and input
    • Re-sort the tests to be in sync with Pau's simplified sorting
    • 1 x 1 with Alolita
    • Weekly Meeting
    • Maven communication
  • প্রয়োজন:
Siebrand
  • Done:
    • Office hours
    • Caught up on mail. Looks like Erik is okay with the deployment plan. No clarity about the feature set yet, but *looks good*
    • Prepared small talk about potential temptations in Amsterdam for hackathon briefing on Friday; had to check with legal counsil, for example.
    • twn support, code review and code maintenance.
  • Will do:
    • update deployment plan with URLs for testing
    • team meeting
    • Review ULS/Translate
    • Comms for ULS deployment
  • Need:

Stand-up meeting 2013-05-08 (14:00 UTC)

[edit]
आलोलिता (Alolita) (not present)


אמיר (Amir)
  • עשיתי:
    • lecture about MediaWiki in Ben-Gurion University
    • IE IME bug - fixed for IE 9 and 10 with Praveen, tested and merged. ;)
    • Reviewing code by Niklas.
  • אעשה:
    • ULS bugs
  • צריך:
Niklas
  • Tein:
    • General code review
    • Debugged frontend problem at translatewiki.net reported by multiple users
  • Teen:
    • Office hours
    • Day off tomorrow
    • Content translation mtg on Friday
    • TUX stories, and few other remaining tasks before Monday
  • Tarvin:
    • I'm waiting for final confirmation for the course I signed up for
Pau
  • Necessitats:
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Blog published
    • Office hour prep
    • Meeting with Pau about content translation design
    • Corrected some of the ULS tests
  • চলমান কাজ:
    • More tests
    • Office hour
    • Follow up with the QA team on the ULS tests
  • প্রয়োজন:
    • Waiting for mediawiki.org to stabilise
Siebrand
  • Done:
    • Had a few days off. Only tried to read email and replied to the most important ones.
    • Was mostly ill during the days off. Probably a stomach flu that took 3 days.
    • Slowly catching up.
  • Will do:
    • Office hours
    • AMS hackathon meeting
    • Planning to do lots of review on the open patch sets.
  • Need:
    • Looks like our planning for getting sign-offs for ULS deployment plan and feature status is not being met. Need a status update from Alolita. It seems however, that things are already shifting by one week.

Stand-up meeting 2013-05-07 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
  • मैं करूँगी:
  • मुझे चाहिए:
אמיר (Amir)
  • עשיתי:
    • fixed an urgent issue with ULS for anon users
    • code review
    • trying to fix the IE 9 IME bug, had some progress
  • אעשה:
    • finish the IME IE 9 bug
    • other ULS issues
  • צריך:
Niklas
Pau
  • Fet:
    • ULS clarifications on email
    • Schedule content translation talks
    • Meeting with Runa on cucumber tests
  • A fer:
    • Define cucumber tests
    • Office hours
    • Content translation designs
    • Designs for Niklas
    • Content translation meeting with Runa
  • Necessitats:
রুণা (Runa)
  • সমাপ্ত কাজ:
    • ULS test scenarios
    • Meeting with Pau about the ULS test cases
    • (Travel documents, date for interview and tickets)
  • চলমান কাজ:
    • Office hour prep on etherpad
    • More ULS tests and rewrite some with the new beta URL
    • Publish the blog post
    • Review the content translation document
  • প্রয়োজন:
    • Waiting for a sign-off for the blog-post
Siebrand
  • Done:
  • Will do:
  • Need:

Stand-up meeting 2013-05-06 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
    • At OSBC open source conference last week (M-W)
    • Sprint planning sessions
    • Interview followup with software engineer candidates
    • At HR Training on Thursday
    • Presented talk at SF Globalization meetup - 50+ attendees, went well
    • At TED localization meeting on Friday
    • Reviewed blog posts
    • GSoC proposal review
  • मैं करूँगी:
    • ULS deployment followup discussion w Howie
    • Lots of interviews with candidates (4)
    • GSoC proposal review contd., followup on VE proposal
    • Follow up on administrative stuff
    • LCM, Language portal thinking
    • Meetings at WMF SF
  • मुझे चाहिए:
אמיר (Amir)
Niklas
  • Tein:
    • Filed a bunch of bugs for Translate and ULS
    • Multiple TUX bug fixes
    • TWN stuff (mainly migration of main page to regular extension)
  • Teen:
    • Deployments
    • ULS on beta
  • Tarvin:
    • My remaining TUX cards need UI related decisions before coding starts
Pau
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Blog post sprint 40: sent for review
    • Created the activity page for Lang Eng communication: Language_engineering_communications_and_outreach
    • Interacted with a possible OPW candidate
    • Office hour prep document sent
    • ULS cog behaviour for logged in and anonymous users
  • চলমান কাজ:
    • ULS test cases - Language settings panel (display and input settings) for logged in users
    • Put everything into gerrit
    • office hour prep etherpad
    • Work on test scenarios with Pau
  • প্রয়োজন:
    • Sign off on the office hour agenda. Need to send out the announcement (details on the team mailing list )
    • Review and sign-off on the blog post (any suggestions for the image to use?)
    • Inputs for the ULS blog post (document link on team mailing list)
    • Pau: Some help about the expected workflow sequence for the input settings options
Siebrand (on leave)
സന്തോഷ് (Santhosh) (on leave)

Stand-up meeting 2013-05-03 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
  • मैं करूँगी:
  • मुझे चाहिए:
אמיר (Amir)
  • עשיתי:
    • Moving
    • Mobile meeting
  • אעשה:
    • More moving
    • GSoC stuff
    • Hopefully, ULS bugs
  • צריך:
Niklas
  • Tein:
    • Set some stories to ready for development
    • Assigned bugs to devs
    • Created story for my course (It inflates my hours by 16 because it spans two sprints, but I didn't want to split it either)
    • Fixed my only "Must have ULS fixes" bug
  • Teen:
  • Tarvin:
Pau
  • Fet:
    • Metrics meeting presentations +1
    • Mobile app meeting
  • A fer:
    • ULS related tasks
    • Prep for testing tasks
  • Necessitats:
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Meeting with Zeljko about ULS priorities
  • চলমান কাজ:
    • Blog post : Sprint 40
    • Office hour prep
    • GSoc/OPW followups
    • Fix some mediawiki pages that Guillaume marked
  • প্রয়োজন:
    • why doesn't mingle have 0.5 marks?
    • Blog post review (I'll submit it for review by the next hour)
Siebrand
  • Done:
  • Will do:
  • Need:
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
  • ചെയ്യും:
  • വേണം:

Weekly Team Meeting 2013-05-02 (17:00 UTC; 10:00 - 11:00 PDT)

[edit]

GSoC proposals

[edit]

Team [60 mins]

Questions? Comments? Feedback?

[edit]

Team [5 mins]

Stand-up meeting 2013-05-01 (14:00 UTC)

[edit]
आलोलिता (Alolita) (not present)


אמיר (Amir)
  • עשיתי:
    • MLEB release
    • Meeting with Patricia Pena about internationalization problems in banners (mostly right-to-left)
    • ULS bugs
    • writing test scenarios for ULS and Translate
    • GSoC: writing comments and sync-up with Runa
    • helped Moriel (mooeypoo) resolve two RTL bugs
  • אעשה:
    • one more ULS bug
  • צריך:
Niklas (day off)
Pau
  • Fet:
    • Metric meeting prep
      • Updating slides
      • Training with Siebrand
  • A fer:
    • Review ULS
    • 6.5 hours of meetings tomorrow (with a 5 min. presentation)
  • Necessitats:
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Meeting with Alolita about the GSoc project we are mentoring
    • Made some more updates to the Language portal
    • Sent the blog for publishing
    • Prepared a checklist for the Mavens. Still more to do about the Program page
    • Replied to all the new Mavens (also cleared the spam entries)
    • GSoC
  • চলমান কাজ:
    • More GSoC
    • Finish the Maven pages
    • Review the updated document for the dashboard from Pau
    • Push all the test scenarios to gerrit (nearly done)
  • প্রয়োজন:
    • #2856 and #2857 - I wont be able to do it this time because I got diverted to the GSoc work
Siebrand
  • Done:
    • Tried to tie up a lot of loose ends and clear my sprint tasks
    • Prepared some work and cleared some backlogs I had everywhere and nowhere
  • Will do:
    • Follow-up on translation rally (really have to do this tonight, because I won't get to it in the next sprint)
  • Need:


Stand-up meeting 2013-04-30 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
  • मैं करूँगी:
  • मुझे चाहिए:
אמיר (Amir)
  • עשיתי:
    • MLEB
      • packaging
      • testing
      • last-minute bugs
    • ULS cog - troublesome
    • GSoC communications
  • אעשה:
    • upload and announce MLEB
    • ULS bugs
  • צריך:
Niklas
  • Tein:
    • Deployments
    • Little bit of code review/gsoc
    • not much else
  • Teen:
    • Not much
  • Tarvin:
Pau
রুণা (Runa)
  • সমাপ্ত কাজ:
    • GSoc project review and interactions
    • Language Portal page update
    • Reviewed the testing strategy document
    • Visa/Travel related work
    • ( Took a break during the day - too hot!)
  • চলমান কাজ:
    • Updating the Maven documents (checklist and main page)
    • Reply to the newly signed up Mavens
    • Check through the GSoc project proposals for appropriate tagging (requested by Quim)
    • One more look at the Wikimania proposals
  • প্রয়োজন:
Siebrand
  • Done:
    • Planned to not work. Failed partially.
    • Meeting with Pau on content translation (he'll soon share the current status)
    • Meeting with Pau on presentation for Thursday. Presentation is now mostly done. We're going to pratice tomorrow.
    • Lots of dog fooding of page translation on Wikimedia wikis. Found and reported a few issues.
  • Will do:
    • Practise Thursday presentation
    • Prepare next sprint.
  • Need:

Stand-up meeting 2013-04-29 (14:00 UTC)

[edit]
आलोलिता (Alolita) (not present)


אמיר (Amir)
  • עשיתי:
    • fixing a lot of ULS issues
    • replying to GSoC applications
  • אעשה:
    • MLEB
  • צריך:
Niklas
  • Tein:
    • Created lcm-dashboard repo on github
    • update milkshake group on github per request of Alolita
    • ULS from different angles
    • Started writing a blog post
    • ((( Got a job offer )))
  • Teen:
    • Deployments
    • Finish blog post?
    • So much to do....
    • Decide on Apertium course
  • Tarvin:
    • Kiwis (shopping tomorrow)
Pau
রুণা (Runa)
  • সমাপ্ত কাজ:
    • GSoc traffic
    • Blog post sent for review
    • Reviewed Language Matrix UI design
    • Had a meetign with Andre -- what about?
  • চলমান কাজ:
    • Review the GSoc proposals
    • Update the Portal page
  • প্রয়োজন:
Siebrand
  • Done:
    • twn support, exports
    • code review
    • GSoC proposal review. Pushed for unit/browser testing as part of the iterations, instead of at the end of the project plan.
  • Will do:
    • Meeting with Pau
    • Metrics meeting presentation prep
    • Enjoy an almost day off. Not sure if I'll be in the daily. Don't count on it...
  • Need:

Stand-up meeting 2013-04-26 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
    • Weekly team meeting
    • 1:1s
    • Language Mavens blog post review/rewrite
    • LCM walkthrough w Runa
    • Google meeting on webfonts
    • GSoC proposals review
    • A2K workplan feedback
  • मैं करूँगी:
    • Language Portal thinking
    • Webfonts followup
    • Talk prep
    • Hiring roundup w recruiting
    • 1:1 w Howie
    • GSoC proposals review (contd.)
  • मुझे चाहिए:
    • ULS deployment schedule
    • Roadmap focus areas
    • translatewiki.net home page launch schedule
אמיר (Amir)
  • עשיתי:
    • keys for my new apartment
    • 1:1 - fixed a bunch of issues in the QA roadmap document
    • team meeting
    • bug 46841: JavaScript error in ULS in getScript: TypeError: Cannot read property '0' of undefined
    • ULS positioning - some surprises there
    • mobile meeting
  • אעשה:
    • ULS positioning
    • ULS for anonymous
    • ULS bugs
    • GSoC replies
  • צריך:
    • review of ULS gerrit and Github commits
Niklas
Pau
রুণা (Runa) (may be a few minutes late because of the other meeting)
  • সমাপ্ত কাজ:
  • চলমান কাজ:
    • Review the Language coverage dashboard UI spec
    • Finish the scenarios
  • প্রয়োজন:
    • andre wants to know: if there are any technological reasons why Narayam is being preferred in some wikis, when ULS is clearly going to replace it? And if there is any deployment policy, based on which users can be guided to make a choice? (Ref bug: https://bugzilla.wikimedia.org/show_bug.cgi?id=32515)
    • github repo for the LC dashboard
Siebrand
  • Done:
    • Haven't been in a bunch of dailies.
    • Happy about the prepared presentation w/ Pau.
    • Was in Poland
    • Code review for Translate and ULS, some code quality for core and jQuery.Webfonts
    • Dreamt that Pau was resigning. Made me wake up. Please don't! Not in my planning for the sprint ;-)
  • Will do:
    • Weekend tasks for twn
    • Assess and comment on GSoC proposals in melange
    • ULS deployment plan and distribute in team
    • Update text for metrics presentation.
  • Need:

wikimedia.org/r/#/c/60831/2 https://gerrit.wikimedia.org/r/#/c/60831/2] /seems to fail (does not fix the problem in the scenario from https://bugzilla.wikimedia.org/45327 )

Weekly Team Meeting 2013-04-25 (1800 UTC; 10:00 - 11:00 PDT)

[edit]

Sprint Highlights, Major Blockers

[edit]

Amir, Niklas [5 mins]

Two stories are ready for testing. (13 in progress, 3 not started)

ULS: Update on UX testing and development progress

[edit]

Pau, Amir [5 mins]

Testing session scheduled for Monday. If the new implementation is publicly accessible, I'll test it instead of the prototype.

translatewiki.net: Update on home page development progress

[edit]

Niklas [5 mins]

Nothing to update.

Deployment blockers:

  • Integration with sandbox (or alternatively do it without sandbox at first)
  • Check performance
  • Developer signup
  • RTL validation
  • L10n ;)
  • Browser support
  • screen width support
  • ( automatic adaptation based on screen width?)

Communications, Outreach, Bug Triage, GSoC update

[edit]

Runa [5 mins]

  • GSoC - jquery.ime (7 students) (there are 2 jQuery.IME related projects, more details?)
    • jQuery.IME extensions for Firefox and Chrome
    • jQuery.IME next big release improvements
  • 2 on email
  • Someone just submitted a proposal related to translation. Quim explained that GSoC is about development. Same person that I quoted from in Skype.
  • Bug triage summaries - are available on mw.org
  • Mavens followup - Runa had followed-up with Mavens
  • Communications update
  • Testing update - WMFLabs instance
  • LE team calendar - dates for team to remember to submit comments on and release dates etc.

Translate workflow presentation at May 2 metrics meeting dry-run

[edit]

Pau, Siebrand [10 mins]

Misc Updates (for topics too small to have their own section)

[edit]
  • Roadmap (onscreen keymaps)
  • Language Summit in Fall 2013
  • QA and test plans for language features
  • Scrum master training
  • LevelUp update
  • WMF engineering team updates (who's joined, who's leaving)
  • Fostering teamwork across teams - discussion
  • Hiring update (Candidates status, Internships)

Alolita, Team [10 mins]

Team Questions? Comments? Feedback?

[edit]
  • Expense reports
  • GSoC github project setup
  • <any other topics>

Team [5 mins]

Stand-up meeting 2013-04-25 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
    • LCM walkthrough
    • 1:1s
    • Follow up with Red Hat FUEL team
    • Hiring syncup
    • Bug triage session
  • मैं करूँगी:
    • Weekly team meeting
    • 1:1s
    • Language Mavens blog post review
    • Google meeting on webfonts
    • Language Portal thinking
    • GSoC proposals review
    • A2K workplan feedback
  • मुझे चाहिए:
    • ULS deployment schedule
    • Roadmap focus areas
    • translatewiki.net home page launch schedule
    • Note: Wikimania 2013 CFP closes April 30
אמיר (Amir)
  • עשיתי:
    • RTL issues session with Wikia developers - asked by Siebrand
    • ULS scrolling fixes
    • QA strategy review
    • GSoC proposals reading
    • started doing the ULS caret (tip)
    • bug triage
  • אעשה:
    • Excited about the VisualEditor deployment!
    • Mobile meeting (IL students meeting)
    • ULS issues
    • team meeting
    • 1:1
  • צריך:
Niklas
Pau
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Gathered all the bug triage session notes since 2011 (that were available). URL: Language_Testing_Plan#Bug_Triage . Also linked from the language portal page now.
    • Bug triage last night
    • Responding to GSoc candidates
    • Language Maven blog post sent for review (its already shared)
  • চলমান কাজ:
    • Send out the notes from last nights triage
    • More GSoc query resolution
    • Weekly
    • 1 x 1 with Alolita
    • Fill out visa forms and gather the documents
    • Finish all the pending test scenarios and gerrit submissions
  • প্রয়োজন:
    • github repo for LC dashboard
    • is it ok to put a youtube video into a mediawiki.org page? (jquery.ime code decoded)
    • if yes, then the 'EmbedVideo' extension is not working [screenshot+url]
    • review of the blog post - Can be done until tomorrow.
Siebrand (in Poland - did not join)
  • Done:
  • Will do:
  • Need:

Stand-up meeting 2013-04-24 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
    • LCM UI design proposal notes
    • Reviewed GSOC student requests
    • Hiring syncup with recruiters
    • Roadmap update discussion
    • Open Type Spec review
    • Wikimania proposals w Mozilla
  • मैं करूँगी:
    • 1:1s
    • Follow up with Red Hat FUEL team
    • Hiring syncup
    • Bug triage session
  • मुझे चाहिए:
    • Can Niklas make it today for 1:1 else we can reschedule
אמיר (Amir)
  • עשיתי:
    • task 2942 - ULS settings panel tweaks
    • addressing code issues
  • אעשה:
    • 2919 - Review LangEng QA strategy document
    • bug triage
    • ULS tasks
    • GSOC replies
  • צריך:
Niklas (not present)
  • Tein:
    • Two translate bug fixes
    • Code review
    • Started gsoc communications
    • Reading the discussions started by Erik.
  • Teen:
    • ULS/Translate bugs
    • gsoc stuff
      • Planning to discuss multilingual semantic mediawiki idea on smw-devel
    • Wish you a good bug triage
    • Looks like Alolita wants to have our 1:1 today
    • ((( WMFI general assembly )))
  • Tarvin:
Pau (not present)
  • Fet:
  • A fer:
    • More detailed sketches on content translation
    • 1:1 with Alolita
  • Necessitats:
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Handling queries over email/IRC/IM/FB from GSoc students
  • চলমান কাজ:
    • Talk:Language_portal -> Language Portal page update
    • Rewriting the Maven blog
    • Attend and host the bug triage
    • Organise the bug triage related pages for our archive (great!)
  • প্রয়োজন:
    • Language Portal page: Ideas about the showcase video/media
    • github or gerrit? which one to choose (what for? GSoc project -- Gerrit is preferred for Wikimedia only)
Siebrand (not present - in Poland)

Stand-up meeting 2013-04-DD (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
  • मैं करूँगी:
  • मुझे चाहिए:
אמיר (Amir)
Niklas
  • Tein:
    • Got a nice tan (well, even burned a little)
    • Processed a week's worth of emails (~1000)
    • Some associated code review
    • Trying to get Foundation to accept IBAN
    • Cancelled i18n deployment window this week
  • Teen:
    • GSoC communications
    • Catch up with remaining code review as needed
    • Start coding
    • Partially unavailable tomorrow (multiple non-work meetings)
  • Tarvin
    • Did anyone write summary of QA meeting?
    • I have task to provide feedback for BugTriage but I don't remember seeing explicit email from Runa about it.
Pau
রুণা (Runa) (traveling in the afternoon)
  • সমাপ্ত কাজ:
    • Language Portal update
  • চলমান কাজ:
  • প্রয়োজন:
Siebrand
  • Done:
  • Will do:
  • Need:
സന്തോഷ് (Santhosh)

Stand-up meeting 2013-04-22 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
    • 1:1s
    • QA Strategy first draft
    • Candidate followup
    • ECMA TC39 ad-hoc meeting
    • Reviewed blog post
    • Reviewed bug triage announcement
    • Reviewed roadmap with Erik
    • Reviewed ULS deliverables
  • मैं करूँगी:
    • Review QA Strategy draft 1 with team
    • EMgt meeting
    • Hiring / Candidate followup
    • Review Language portal
  • मुझे &# 2330;ाहिए:
    • Its Earth Day
    • LCM UI design from Pau
      • File:Language_matrix_spec.pdf - How is this design to be implemented? How will the data entry be done? (With a GSoC internship + Sucheta if she joins as an intern for our team in June)
אמיר (Amir)
  • עשיתי:
    • 2940, 2941: the cog icon and the settings variables - done, needs review
    • 2951: display settings layout - functionality done, needs review and styling
    • Dogfooded TUX and fixed some minor bugs.
    • Fixed some messages in Echo, VE and Wikidata.
    • Cleaned up ULS extension repo - https://gerrit.wikimedia.org/r/#/c/60251/
  • אעשה:
    • QA meeting today
    • 2952 - Tweak the tab contents
    • ULS for anonymous users tasks
  • צריך:
Niklas - on leave
Pau
  • Fet:
  • A fer:
    • Slides for metrics meeting
    • Explore content translation ideas
    • Language QA meeting
  • Necessitats:
রুণা (Runa)
  • সমাপ্ত কাজ:
    • (Had to run errands in the morning and afternoon, am working late afternoon+evening)
    • Rewrote the ULS test scenario descriptions (struggling with some gerrit specifics)
    • Read through the QA strategy document
  • চলমান কাজ:
    • Commit these scenarios into gerrit
    • Language QA strategy meeting
    • Respond to GSoC queries
    • Language Portal page update
    • Traveling to Pune tomorrow, won't be around after noon.
  • প্রয়োজন:
    • Help with gerrit bits
Siebrand
  • Done:
    • twn support, exports.
    • added support for VicunaUploader and blockly in twn
    • code review
    • maintenance for jQuery.IME. Mostly fixing JSHint issues.
    • bug 45605 (Odia spelling in ULS and Narayam)
    • Reported Jenkins brokenness in ULS repo. Antoine fixed it on the spot.
    • Reviewed QA document
  • Will do:
    • Test/QA meeting
    • Meeting about the hackathon in NL tonight. Registrations will probably be closed. Close to 40 people will get a scholarship. Setting up the program is next. Maarten Dammers is responsible for that. I may help if I have time.
    • Travel to Poland. Not in daily tomorrow.
  • Need:
സന്തോഷ് (Santhosh) - on leave

Stand-up meeting 2013-04-19 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
  • मैं करूँगी:
  • मुझे चाहिए:
אמיר (Amir)
  • עשיתי:
    • More work on the ULS cog and the configuration variables
    • Mobile meeting
    • 1:1
  • אעשה:
    • More work on the cog and the config variables
  • צריך:
    • Siebrand: Apple developer account for Or and Tomer < account ordered.
    • Pau: cog icon image file
Pau
  • Fet:
    • Sumarize and share testing results
    • Mobile translate app meeting
    • Preparing TUX talk with Siebrand
    • Content translation meeting with Siebrand
    • Initial design for language matrix
  • A fer:
    • Complete designs for language matrix
    • Explore design concepts for content translation.
    • Reply to compact interlangage links
  • Necessitats:
    • Instructions/help on how to try the ULS integration into WP to be able to review it.
রুণা (Runa)
  • সমাপ্ত কাজ:
    • (Several power and network outages during the day)
    • Completed the sprint 39 blog post and sent out for review
    • Moved the ULS and Translate scenarios to a mediawiki page Language_Testing_Plan#Test_Scenarios]
    • Meeting with Alolita
    • Meeting with Pau about UI feature tests
    • Meeting with Željko
  • চলমান কাজ:
    • Send the blog for publication
    • Adding the feature files to gerrit
  • প্রয়োজন:
    • Sign off for the blog
    • May need help with gerrit
Siebrand (came in 10 mins late, forgot while working...)
  • Done:
  • Will do:
    • Usual weekend work
    • Review sprint 39 post
  • Need:

Weekly Team Meeting 2013-04-18 (1800 UTC; 10:00 - 11:00 PDT)

[edit]

Sprint Highlights, Major Blockers

[edit]

Siebrand [5 mins]

Sprint started 2 days ago. Will last 2 days longer than usual.

Observed curious pratice by Amir. He set 15 hours worth of tasks to estimated 0 hours remaining[1], motivating it by "The task list was very long, and I closed some that were not really about coding." Report in the daily was "not much today [..] exploring how Wikidata handles the language links [..]". I think this completely defeats the purpose of our meticulous and detailed planning, partially at the request of Amir.

Setting the tasks to 0 hours remaning, artificially decreases the number of remaning hours, and will result in overspending time on tasks with estimates over 0, and severely underspending, or at least invisibly spending time, on activities that more than two full working days of a sprint were allocated for. I don't mind changing something in our workflow and planning if that is needed, but I feel very strongly this is *not* the way to go.

[1] https://mingle.corp.wikimedia.org/projects/internationalization/history?filter_user=31&period=yesterday

Amir observes that the "My Work" list paginates, and to circumvent, he closed tasks he thought were of lower priority wrt to output. Siebrand to look into how to make the list not paginate.

Update on ULS UX testing/development

[edit]

Pau, Amir [10 mins]

  • Latest changes tested successfully
  • Main problem: initial discoverability
  • Change specification at [https:
//docs.google.com/a/wikimedia.org/document/d/1mamlzJEUtcPAqH5GAqVbCk1nEpvx8cOjn_hso2J7AH4/edit https://docs.google.com/a/wikimedia.org/document/d/1mamlzJEUtcPAqH5GAqVbCk1nEpvx8cOjn_hso2J7AH4/edit]

Communications, Outreach, Bug Triage update

[edit]

Runa [5 mins]

Siebrand removed three invitations for future bug triages and sent notifications to invitees. Calendar items, etc, around bug traiges to be planned and owned by Runa.

Hiring update

[edit]

Alolita [5 mins]

One strong cadidate unfortunately has personal circumstances that prevent us from being able to hire him.

Alolita will write up and share feedback from the devs that did the interview as well as the recruiting team, to be sent to team early next week.

Questions? Comments? Feedback?

[edit]

Team [5 mins]

  • GSoC
  • Expense reports
    • SM: I submitted SF 2012-09, Pune 2013-02, Brussels 2013-02. Decided not to submit for Bangalore 2012-11. Todo: SF 2013-03.
  • & nbsp; Roadmap update: 6 days after announcing the first version, there are 0 comments. I'll send a desperate request for feedback today. Not getting any feedback from my direct peers in product makes me feel very insecure.

Stand-up meeting 2013-04-18 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
  • मैं करूँगी:
  • मुझे चाहिए:
אמיר (Amir)
  • עשיתי:
    • ULS cog icon - committed first draft
  • אעשה:
    • finish the ULS cog icon
    • ULS configuration variables for the new changes
  • צריך:
    • cog styling help from Pau
Niklas
  • Tein:
  • Teen:
  • Tarvin:
Pau
  • Fet:
    • Testing on usertesting.com
  • A fer:
    • Sumarize and share results
    • Review CSS for Amir
    • Designs for the language matrix
  • Necessitats:
রুণা (Runa)
  • সমাপ্ত কাজ:
  • চলমান কাজ:
    • More bug triage prep work - send out the announcements
    • Complete the sprint 39 blog post and send out for review
    • Move the ULS and Translate scenarios to a mediawiki page and get started on putting them into gerrit
    • Weekly meeting
    • 1 x 1 with Alolita
  • প্রয়োজন:
    • The bug list needs a look-over
Siebrand
  • Done:
    • Mostly code review. I have 155 incoming reviews. For 64 of those, the latest patch set does not have a score. I reviewed some 25 patch sets (est.) since we ended the sprint planning.
    • Did some QA on Chrome, as Tilman mentioned on Skype it didn't work. Tested extensively on twn, meta and mediawiki.org. On the latest two as logged in and anonymous. No issues found.
  • Will do:
    • 1-on-1 w/ Alolita
    • Weekly team meeting
    • Have meeting with Pau on presentation and content translation.
  • Need:
    • Will address some planning/execution pratices I found today using mingle in the weekly meeting.

Stand-up meeting 2013-04-17 (14:00 UTC)

[edit]
आलोलिता (Alolita) - could not join
  • मैंने किया: Linux Summit, Sprint planning
  • मैं करूँगी: Linux Summit, Sprint planning
  • मुझे चाहिए:
אמיר (Amir)
  • עשיתי:
    • not much today - signed apartment contract
    • exploring how Wikidata handles the language links, so that the addition of the ULS cog will work well with it.
  • אעשה:
  • צריך:
    • Code review for commits in Translate. All are supposed to be ready to megre.
Niklas - in Milan - on leave
  • Tein:
  • Teen:
  • Tarvin:
Pau
  • Fet:
  • A fer:
    • Testing on usertesting.com
    • Usability test
  • Necessitats:
রুণা (Runa)
  • সমাপ্ত কাজ:
  • চলমান কাজ:
    • GSoC prep documents and communication
    • Sprint completion blog
    • Bug day prep (including announcement message)
    • Communicate about the Maven meeting
  • প্রয়োজন:
സന്തോഷ് (Santhosh) - on leave
  • ചെയ്തു:
  • ചെയ്യും:
  • വേണം:
Siebrand - did not join
  • Done:
  • Will do:
  • Need:

Stand-up meeting 2013-04-15 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
  • मैं करूँगी:
  • मुझे चाहिए:
אמיר (Amir)
  • עשיתי:
    • another doctor visit on Sunday.
    • little fixes in Main page and TUX.
    • 46786 Dev: Incorrect message when nothing to proofread - committed first step, which covers most of Proofread scenarios
    • Skip / Cancel button
    • language mavens intro meeting
  • אעשה:
    • Independence day tomorrow - I'll attend the meetings, but probably not more
    • try to finish the two low-priority bugs
  • צריך:
Niklas
  • Tein:
    • Sandbox stuff
  • Teen:
    • Fix my commits
    • Prepare a suitable task for interview
  • Tarvin:
Pau
রুণা (Runa)
  • সমাপ্ত কাজ:
  • চলমান কাজ:
  • প্রয়োজন:
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
  • ചെയ്യും:
  • വേണം:
Siebrand
  • Done:
    • Sent out newsletter. Thanks to Amir for review.
    • twn export/import
    • twn support
    • L10n QA
    • Code review and some fun stuff
    • wrote invoces and did all overdue expense reports. Yay.
    • Caught up with Pau. Reviewed documents Pau produced after meeting with Howie and Munaf.
    • Got demo from Niklas on the translator sandbox.
    • Fiddled with my bad wireless for hours. Made me get into more delays than anticipated. Apple support was awesome.
    • Had a meeting with Lingoport on Friday. I met them at the conference in Santa Clara where I presented in March. They have an "i18n/L10n linter" they offered to train for MediaWiki and extensions. They plan to run it every 24 hours and envision they will host the reports themselves. Looks very interesting. For us, it could save us developing the linter, for them it's training for junior staff and possibly some PR because they help Wikipedia. I gave them all the disclaimers about logos, word marks, not endorsing anything, etc.
  • Will do:
    • 1. prepare new sprint
    • 1. translation rally follow-up (probably not going to happen)
    • 2. assess blockly for twn (probably not going to happen)
    • 3. assess Fina for twn (probably not going to happen)
  • Need:
    • Please e-mail me your availability for next sprint (16/4-1/5) -- will send mail.

Stand-up meeting 2013-04-12 (14:00 UTC)

[edit]

आलोलिता (Alolita) - (50-50 chance of joining in due to early morning errand)

  • मैंने किया:
    • Translate workflow walkthrough w Pau and design team
    • ULS scenarios review
    • Review Language Maven blog post - needs rework
    • 1:1s
    • Weekly team meeting
    • HR recruiting followup
    • GSOC meetup
  • मैं करूँगी:
    • ULS discussion
    • Hiring followup
    • LCM followup w Runa
    • Language Maven blog post - needs rework
    • Testing tools - follow up with CMM
  • मु&# 2333;े चाहिए:
אמיר (Amir)
  • עשיתי:
    • message tools CSS refactoring - finished
    • TWN Main Page review and i18n - finished
    • TWN newsletter review
  • אעשה:
    • sandbox code review
    • 46786 Dev: Incorrect message when nothing to proofread
    • 46099 Last search result has active button "Skip to next"
    • if I have time:
      • 43904 jQuery.ime jumps forward after every character when there is pre-existing text in IE
      • 45686 Implement used X times
  • צריך:
    • a grunt question to Santhosh
Niklas
  • Tein:
    • weekly
    • Helped reviewing mainpage stuff
    • Committed first version of Special:TranslateSandbox
  • Teen:
    • Etherpad move
    • Remaining tasks do while time
  • Tarvin:
Pau (not attending
left bag at office and :
  • Fet:
    • Team meeting
    • Panel interview with UX director candidate (overlaps with weekly 30 min.)
    • TUX designs with the design team
    • Weekly design meeting
    • GSoC meetup
    • Bowling
  • A fer:
    • ULS meeting
    • CSS styling
  • Necessitats:
রুণা (Runa) (off)
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
    • twn main page- some polishing, and remaining stuff
    • weekly
  • ചെയ്യും:
    • not much. will check emails less frequently.
    • vacation till May 15
  • വേണം:
Siebrand
  • Done:
  • Will do:
    • Send out newsletter
    • twn export/import, support
    • translation rally follow-up
  • Need:
    • Niklas to move etherpad back to where it once was and worked.

Weekly Team Meeting 2013-04-11 (1800 UTC; 10:00 - 11:00 PDT)

[edit]

Sprint Highlights, Major Blockers, Deployment

[edit]

Siebrand, Team [5 mins]

  • IE
    • Cannot integrate account creation properly
    • Needs testing in various browsers
    • Maybe start with logged in users?

Open hours:

Amir: 22 (2-3d to go. looks fairly doable)

Niklas: 18 (2d to go, doable?)

PG: 13 (not doable, it seems)

RB: 11 (...?)

ST: 8 (doable)

SM: 25 (lot of work...)

Update on translatewiki.net homepage features w Demo

[edit]

Siebrand, Niklas, Pau [10 mins]

Not much has changed since last week, patches waiting for view.

https://translatewiki.net/wiki/Special:MainPage

Many CSS adjustments pending. Hope to have time before sprint ends.

ULS update

[edit]

Latest update from SF - Alolita, Pau [5 mins]

Can't do anything before the are decisions. Might have to rush. Nothing more to say about it than we already did during today's daily.

HR Q&A notes + hiring update

[edit]

Alolita [5 mins]

Summary: no work no pay. *nod* That's basically how contracting works.

Summary: can compensate for overtime hours in next weeks by working less.

Did HR confirmed explicitly thet the following is correct: Not working during Independence day (4 July) and reporting 8 hours to ODesk with the "Vacation" concept?

Will this handbook preparation process try to involve us for comments, feedbacks?

It's a wiki, be bold, and send a mail if you think it needs clarification...

Questions? Comments? Feedback?

[edit]

Team [5 mins]

  • AMS Hackathon prep (topics, bugs, Wikidata)
  • GSoC mentor signup
  • Expense Reports
  • WebFonts question
    • At the moment there is no priority in this area. Amir wrote a fairly comprehensive overview, I think. We need communities to indicate they want it and they need to be sponsors for this feature. Given the current ULS discussion, I'd rather not spend time on this.
  • Back to old etherpad? +1+1 -> Tasked for Niklas
  • recruitment updates?

Stand-up meeting 2013-04-11 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
    • LE Office hours 10-11A PDT
    • ULS discussion w Pau, Siebrand, Howie
    • LCM discussion
    • 1:1s
    • Pending ERs - followup
    • Review ULS testing scenarios
    • Worked on roadmap document
  • मैं करूँगी:
    • Review and sign-off for Language Maven blog post
    • Testing tools - follow up with CMM
    • Translate workflow walkthrough w Pau and design team
    • 1:1s
    • Weekly team meeting
  • मुझे चाहिए:
אמיר (Amir)
Niklas
  • Tein:
    • Deployments
      • Translate fixes
      • Translation memory rebiult
      • No issues in tm
      • Did not b run l10n cache because was unsure because of the recentt emails
    • Fixed twn repo for siebrand
    • Office hours
    • Mostly finished coding the new main page
    • Got tickets to AMS
  • Teen:
    • Started working on admin interface of translator sandbox
  • Tarvin:
    • Can we go back to the old etherpad in the meantime?
    • Does pau hvae time to style the mainpage?
Pau

Santhosh

  • did
    • catching up with emails
    • Code review
  • will do
    • team meeting
Siebrand
  • Done:
  • Will do: ** Last pass over roadmap before distributing ** twn support ** bug fixing and other fun stuff ** write twn newsletter
  • Need:

Stand-up meeting 2013-04-10 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
    • Reviewed India programs docs + 2 hour conference call
    • Followup with Google India on fonts evaluation
    • Reviewed roadmap doc
    • Candidate follow-up
    • Drafted and sent recognition letters for prize winners at Blore DevCamp
  • मैं करूँगी:
    • LE Office hours 10-11A PDT
    • ULS discussion w Pau, Siebrand, Howie
    • LCM discussion
    • 1:1s
    • Pending ERs - followup
    • Review ULS testing scenarios
    • Review and sign-off for Language Maven blog post
    • Testing tools - follow up with CMM
  • मुझे चाहिए:
אמיר (Amir)
  • עשיתי:
    • IE stuff
    • code review
    • refactoring CSS for message tools
  • אעשה:
    • bugs
    • office hours
  • צריך:
    • dates for my flight (scrum training SF in June)
Niklas
  • Tein:
    • IE stuff
    • Main page
  • Teen:
    • Deployments again :)
  • Tarvin:
    • Positioning of the group selector is problematic
    • Travel for AMS hackathon (respond to Doreen's questions)
Pau
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Office hour preparations; Reminders sent
    • Communications for the meeting for Language Mavens (can you please [B]CC Siebrand on all of these?)
    • Sent the Translate test scenarios to Zeljko
  • চলমান কাজ:
    • Updating the Language Portal Page
    • Write a few more test scenarios for Translate
    • Write a summary of the work done for Level Up
    • Office hour
  • প্রয়োজন:
    • Review and sign-off for the Language Maven blog post
സന്തോഷ് (Santhosh) (day off)
Siebrand
  • Done:
    • Lot of code review and testing, inside and outside of team scope.
    • twn support
    • Worked for another client
    • Sore throat...
    • Looks like we've managed to tackle the known critical issues on IE. Ready for tomorrow's deployment.
  • Will do:
    • More work for another client on Thu
    • Office hours
    • ULS meeting with PG, AS, HF
  • Need:

Stand-up meeting 2013-04-09 (14:00 UTC)

[edit]
आलोलिता (Alolita) (not present)


אמיר (Amir)
  • עשיתי:
    • last night - some IE bug fixes
    • code review
    • card 2871 - Incorrect message when nothing to proofread (with Pau's design)
    • more IE bugs, now working on 47039
  • אעשה:
    • finish 2871
    • more bugs
  • צריך:
Niklas
  • Tein:
    • Deployments with the usual amount of issues and confusion
    • Read monthly engineering report
    • setTimeout call issue
    • tried to help with the IE bus
  • Teen:
    • Send a reminder to engineering -l
  • Tarvin:
Pau
রুণা (Runa)
  • সমাপ্ত কাজ:
    • Sprint 37+38 blog publication - set up for publication on Friday and followed up with Tilman
    • Language Maven blog - out for review
    • Translate test scenarios
  • চলমান কাজ:
    • Office hour preparation
    • Send the Translate test scenarios to Zeljko for evaluation
    • Follow up on the meeting date/time for the Language Mavens
    • Language Portal update
    • Send reminder for the office-hour (tomorrow morning)
    • 1 x 1 with Alolita
  • প্রয়োজন:
    • Waiting for the engineering communications backlog to clear
    • Blog review and sign-off
സന്തോഷ് (Santhosh) (not present in daily)
  • ചെയ്തു:
    • IE bug fixes
  • ചെയ്യും:
    • off tomorrow
Siebrand

Stand-up meeting 2013-04-08 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
    • Internship conversation w OPW participant - Sucheta
    • Team questions March 29 HR meeting notes
    • CMM/ZF testing followup
    • Gerrit problems
  • मैं करूँगी:
    • Work on LCM spec
    • CMM/ZF testing followup contd
    • Hiring followups
    • Setup meeting w Sucheta - for JS test
    • Roadmap update - complete components for release on Wednesday
    • Promote office hours coming up on Wednesday
  • मुझे चा हिए:
אמיר (Amir)
  • עשיתי:
    • recovering from illness
    • bug 42383 Search filter is not cleared when search text is deleted - committed
    • bug 45833 "More warnings" tab does not disappear - committed
    • 46778 IME layout name is incorrectly aligned in RTL - committed to GIThub
    • review Niklas' sandbox commits
  • אעשה:
    • More TUX bugs
  • צריך:

projects/internationalization/cards/2870 https://mingle.corp.wikimedia.org/projects/internationalization/cards/2870] (my task depends on it)

Niklas
  • Tein:
    • Not much
    • Helped Siebrand to free space on twn
    • lending my dev to Santhosh
    • Filed new bugs
  • Teen:
    • Deployments (looks like solr schema change is not yet reviewed)
  • Tarvin:
Pau
  • Fet:
    • Travel to SF and almost recovered jet-lag
    • Iconathon and talk (will practise the "mirror" pronunciation)
  • A fer:
    • Empty message design
    • CSS review
  • Necessitats:
রুণা (Runa) (off)
സന്തോഷ് (Santhosh)
Siebrand
  • Done:
    • twn export/import was very time consuming this time. A bug surfaced in the export. That was resolved, but it took another 2-3 hours to get everything consistent again. Also found an issue in updates of repos for supported projects on twn.
    • took care of some disk space shortages on twn
    • Support
    • Finalised roadmap
  • Will do:
    • twn support
    • code review
  • Need:

Stand-up meeting 2013-04-05 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
    • Team meeting
    • Metrics meeting
    • Blogpost review
    • Officehours prep review
    • 1:1s
  • मैं करूँगी:
    • LCM spec
    • Internship conversation w OPW participant - Sucheta
    • Team questions March 29 HR meeting notes
    • CMM/ZF testing followup
    • Gerrit problems
  • मुझे चाहिए:
אמיר (Amir)(not well)
Niklas (not joining in today)
Pau (in flight - not joining in)

রুণা (Runa) (Not attending today)

  • সমাপ্ত কাজ:
    • Sprint blog post - sent for publication
    • office hour announcement sent
  • চলমান কাজ:
    • Writing test scenarios for Translate (using google doc this time)
    • Level up session with Zeljko (would be complete right ahead of the daily)
  • প্রয়োজন:
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
    • CR, CR followups
    • prepared coding excercise for candidate
    • bugzilla stuff
    • attended weekly meeting
    • interviewed a candidate
    • Better adapt textarea to content(to be reviewed https://gerrit.wikimedia.org/r/57712)
  • ചെയ്യും:
    • ring
    • (15hrs of work remaining)
  • വേണം:
Siebrand
  • Done:
    • Not much
  • Will do:
    • Regular weekend stuffs

Weekly Team Meeting 2013-04-04 (1800 UTC; 10:00 - 11:00 PDT)

[edit]

Sprint Highlights, Major Blockers

[edit]

Team [5 mins]

Sprint progress is as expected. No roadblocks so far.

Demo translatewiki.net homepage features progress

[edit]

Niklas, Pau [10 mins]

https://dev.translatewiki.net/wiki/Special:MainPage

ULS update

[edit]

Community discussion, criticism - gist of issues and suggested solutions - Siebrand [5 mins]

Update from SF - Alolita [5 mins]

Alolita promises to put all verbal demands by manager in writing to the team to take out possibile ambiguity, so that demands can be clearly understood by those things are demanded of.

Communications update

[edit]

Runa [5 mins]

Design Iconathon in SF

[edit]

Pau [5 mins]

The Noun Project (http://thenounproject.com/ ) organise Iconathon with others

More info on out Iconathon: http://meta.wikimedia.org/wiki/Iconathon_2013

HR / hiring update

[edit]

Alolita [5 mins]

Questions? Comments? Feedback?

[edit]

Team [10 mins]

Amir send an extremely interesting link. Refresh your agile/SCRUM knowledge and understanding: http://pluralsight.com/training/courses/TableOfContents?courseName=agile-team-practice-fundamentals

How long? Worth spending the time? There is almost 4 hours of material. They are portions up to 10-15 minutes. I listen while travelling on the bus, etc. Just like reading the paper. Listen to a few parts, and decide for yourself if and which parts you want to watch. Can be downloaded for plane viewing? I don't think so... Haven't tried.

Stand-up meeting 2013-04-04 (14:00 UTC)

[edit]
आलोलिता (Alolita)
  • मैंने किया:
    • 1:1s
    • Interviews
    • Budget meetings
    • ER/HR followup
  • मैं करूँगी:
    • Team meeting
    • Metrics meeting
    • LCM spec
    • Blogpost review
    • Officehours prep review
    • 1:1s
  • मुझे चाहिए:
אמיר (Amir)
  • עשיתי:
    • translatewiki.net app meeting - proofreading done, the guys are starting to work on translation. I suggested releasing a beta to the AppStore.
    • CSS fixes in TUX
    • message tools menu fixes
    • started code review of TWN sandbox (by Niklas)
    • interview - reported to Alolita
    • Blogpost review
  • אעשה:
  • צריך:
Niklas
  • Tein:
    • Sandbox
    • Rewrote CLDR xml parser
    • Few bugfix cards
    • Some code review for Translate & new main page
  • Teen:
    • interrview
    • weekly
    • send deployment plans via email
  • Tarvin:
    • Code review for sandbox before rebasing becomes too difficult
Pau
  • Fet:
    • 1:1 with Alolita
    • CSS adjustments for Homepage
    • Meeting for Mobile Translate App
  • A fer:
    • Meeting with Howie
    • Weekly
    • Packing and traveling to SF
  • Necessitats:
রুণা (Runa)
  • সমাপ্ত কাজ:
    • sprint blog written
    • bugzilla meeting with Andre
    • 1 x 1 with Alolita
    • Office hour preparation
  • চলমান কাজ:
    • Cucumber test scenarios for Translate
    • Weekly meeting
    • Send the announcement for the office-hour
  • প্রয়োজন:
സന്തോഷ് (Santhosh)
  • ചെയ്തു:
    • In proofread mode, after editing, update the stats (Merged)
    • Plugins cleanup, documentation
    • CR, rebases, addressing review comments
    • Interview with candidate
    • Reviewed and merged Marshallese input method. Also read about those islands
  • ചെയ്യും:
    • Interview with candidate
    • weekly team meeting
    • rest of the cards
    • (20hrs remaining)
  • വേണം:
Siebrand (judo class)

Stand-up meeting 2013-04-03 (14:00 UTC)

[edit]
अलोलिता (Alolita)
:
  • मैंने किया:
    • Sprint Planning meetings
    • 1:1s
    • Interviews / recruitment followup
    • Followed up w OPW candidates for internship
  • मैं करूँगी:
    • 1:1s
    • Interviews
    • Budget meetings
    • ER followup
  • मुझे चाहिए:
אמיר (Amir)
  • עשיתי:
    • message tools - submitted a draft
    • an RTL bug in Special:Magic
  • אעשה:
    • interview
    • probably Bug 46335 - Uncaught TypeError: Cannot read property 'properties' of undefined
  • צריך:
    • review, testing and styling of the message tools
    • do we have best practices for z-index value?(relative bigger/smaller values will work most of the time. no recommendation for exact values to be used. )
Niklas
  • Tein:
    • 1:1 with Alolita
    • Got lost in Bugzilla (reporting and fixing bug properties)
    • Caught up with email backlog and assortiment of minor bug fixes and code review
    • First part of Translate Sandbox
  • Teen:
    • More sand cakes
    • Interiew
    • Weekly
  • Tarvin:
Pau
রুণা (Runa) (off)

In Kolkata

സന്തോഷ് (Santhosh)
  • ചെയ്തു:
    • TWN main page, ULS+IME bug fixes, improvements
      • Do search on pressing enter key
      • Update jquery.ime from upstream
      • Avoid a division by zero possibility
      • Logged-in widget and misc link fixing, css fixes
      • Use a form for the searchbox
      • Integrate ULS for interface language change
      • Login form
    • 1:1
    • (power and internet back) Yay!!!
  • ചെയ്യും:
    • interview with candidate
    • more cards
    • (25 hours remaining)
  • വേണം:
Siebrand
  • Done:
    • Been working for another client today
    • Testing patches and code review. Provided some feedback on patch sets in Skype channel.
    • Reported a few issues, fixed an issue in core in twn, little bit of twn support
    • Someone was particularly rude to Niklas in a bugzilla issue last night. I hid 3 comments from the issue from public view (and decided not to reply, unless things ignite again)
    • Updated my patch sets that needed updates.
    • Pointed out a page on office wiki for your information. Does this need any discussion or feedback? Will elaborate verbally.
      • Concept seems sane to me. -NL
  • Will do:
    • Not present in tomorrow's daily, as announced. Going to judo with my son.
    • roadmap, twn, code review
  • Need:

Stand-up meeting 2013-04-01 (14:00 UTC)

[edit]

आलोलिता (Alolita): (unable to join in person today due to having to drive to dr appt at same time)

  • मैंने किया:
    • LCM spec work
    • Hiring meeting
    • Meeting with HR on intl contractors policies
    • Talked w Asher to respond to Amir's request
    • Internships followup
  • मैं करूँगी:
    • Phone interviews with candidates
    • HR recruiters meetings
    • LCM spec review
    • ALG mtg
    • Monthly update
    • Sprint planning meetings
  • मुझे चाहि&# 2319;:

אמיר (Amir)

  • עשיתי:
    • TranslationNotification bugs:
      • preview - committed
      • same username - merged
      • self-deleting preferences - working on it - Hashar helped
    • fixed an RTL bug in Wikidata
    • MLEB released. Added some tests.
  • אעשה:
    • finish self-deleting preferences
  • צריך:

Niklas (day off)

Pau

  • Fet:
    • Pending design tasks and emails
  • A fer:
    • Usability testing
    • Summarize last round of tests
    • "Design at WMF" meeting
  • Necessitats:
    • Howie feedback on latest designs (dating from when?)

রুণা (Runa)

  • সমাপ্ত কাজ:
    • Language Matrix tech spec meeting with Alolita
    • Language Matrix report
    • Language Support group form, checklist document, pilot timeline document, emailed the candidates for the pilot round
    • TUX browser support matrix - created a spreadsheet with a list of browsers based upon the mediawiki grade 'A' browser support list - bug #45602 -> VisualEditor/Target_browser_matrix
    • Updated mingle cards
  • চলমান কাজ:
    • Writing some patches for the IME tests
    • Language Test plan document - review and check if any parts of the IME/ULS tests can be add to the manuat test cases
  • প্রয়োজন:
    • Need to send emails to a few more candidates for the pilot round, but today's date is a problem
    • Blocked on this: https://github.com/wikimedia/jquery.ime/pull/152
    • Blogs delayed because Guillaume is in hospital <-- There should be a backup, or you should be able to publish yourself.

സന്തോഷ് (Santhosh)(cannot attend- power and internet fallure)

  • ചെയ്തു:
    • Compact long message group facet lists on search - need more testing with more data. UI is complex.
    • lot of pet stuff
    • many bug fixes (see gerrit review log)
    • CR
  • ചെയ്യും:
    • CR/address CR comments
    • Try to get my internet and power back :(
  • വേണം:
    • review of patches -10 patchsets waiting for review

Siebrand


Stand-up meeting 2013-03-29 (14:00 UTC)

[edit]

अलोलिता (Alolita):

  • मैंने किया:
    • GSoC project planning discussion with team
    • Weekly Team Meeting w roadmap discussion
    • 1:1s
    • Initial interviews with 2 candidates (thumbs down)
    • Language Mavens plan walkthrough
    • Followup on administrivia (expense reports, hr etc.)
  • मैं करूँगी:
    • LCM spec work
    • Hiring meeting
    • Meeting with HR on intl contractors policies
    • Talk abstracts
    • Monthly update
  • मुझे चाहिए:

אמיר (Amir) (cant join)

  • עשיתי:
    • prbably can't be in the daily - driving to Haifa
    • a lot of meetings - TWN app, team, gsoc, 1:1
    • MLEB release - did the testing and the release notes. Had some trouble with testing, Siebrand helped. Going to upload and announce after I arrive to Haifa.
  • אעשה:
    • TranslationNotifications bugs
  • צריך:

Niklas (not joining on break - Easter holiday)

Pau

  • Fet:
  • A fer:
    • Update prototypes
  • Necessitats:

রুণা (Runa) (late joining in)

  • সমাপ্ত কাজ:
    • Support volunteer contact details gathered
    • Level Up meeting with Zeljko
    • Meetings
    • Listed tasks for the Support team plan
  • চলমান কাজ:
    • Email the volunteers
    • Prepare and send the Support team form and document to Alolita and Amir
    • Language Matrix tech spec meeting
    • Language Matrix report
  • প্রয়োজন:

സന്തോഷ് (Santhosh)(may not be in hangout becaus of bandwidth issue)

Siebrand (cannot join - on Easter holiday)

Weekly Team Meeting 2013-03-28 (1800 UTC; 10:00 - 11:00 PDT)

[edit]

Sprint Highlights, Major Blockers

[edit]

Team [5 mins]

TUX Deployment update - We updated last Tuesday and on Thursday on Wikimedia wikis. The switch "TUX default" was flipped earlier today by Niklas and accepted by Amir. Shortly after, Siebrand updated that code on twn production, and it is also default in MLEB 2013.03.

Remaining committed work (2 days in sprint)

  • Amir: 19
  • Niklas: 14 (~0 hours work time left)
  • Pau: 18.5
  • Runa: 39 (34 hours of task work started). Now corrected to 25 after explaining that the estimated number of hours can be adjusted while a task is in progress.
  • Santhosh: 10
  • Siebrand: 18.5 (Easter, other stuff, will probably not complete everything)

WMF ED announcement

[edit]

Alolita, team questions [5 mins]

Roadmap review

[edit]

Siebrand, Alolita [45 mins]

Questions? Comments? Feedback?

[edit]

Team [5 mins]

Stand-up meeting 2013-03-28 (14:00 UTC)

[edit]

अलो&# 2354;िता (Alolita):

  • मैंने किया:
    • ED Announcement meetings
    • GSoC project details
    • LCM dashboard spec
    • Candidates follow-up
    • Followup with Howie on ULS - rescheduled due to unavailability
  • मैं करूँगी:
    • Monthly status update
    • Wikimania talk proposal
    • Candidates follow-up
    • GSoC team discussion
    • 1:1s
    • Weekly Team Meeting w Roadmap walkthrough
  • मुझे चाहिए:
    • etherpad at wmflabs.org followup w mark h - usecases
    • Pad is still unusably slow
      • Devs suggest 750 lines is too much - should we try to archive?
        • Old pad went well up to 1100 lines. We do more than 100 lines per day, so this product does not match our requirements.

אמיר (Amir)

  • עשיתי:
    • MLEB release mostly done. Draft release notes emailed to Niklas for review.
    • code review
    • sprint blog post review
    • TranslationNotifications bugs
    • Merged TUX as default
  • אעשה:
    • meetings
    • TranslationNotifications bugs
  • צריך:

Niklas

  • Tein:
    • Tried to fix the language fallback patch - no success
    • Deployed Translate update
    • Rebased one of my ULS patchsets
    • Did the magical commit of setting $wgTranslateUseTux = true after resurrecting my lost commit from the git manala
    • Prepared for GSoC meeting
  • Teen:
    • Meetings
    • Maybe: LQT workaround
    • Maybe: Missing part of project tiles for the main page
    • Maybe: Missing part of background image for the main page
    • Read Amir's notes
  • Tarvin:
    • Pad is still unusably slow
      • Devs suggest 750 lines is too much - should we try to archive?
        • Old pad went well up to 1100 lines. We do more than 100 lines per day, so this product does not match our requirements.
      • Devs also suggested I should upgrade my CPU (i5-347U) which is a bit hard for a laptop
    • Likely not doing interview in this sprint
    • Deployment stuff messed my sprint plans

Pau

  • Fet:
    • Summarize findings
    • Prepare for additional Hangout-based tests
    • Preparation for GSoC and Roadmap meetings
  • A fer:
    • Meetings
    • Usability testing
    • ULS designs per Howie's request
  • Necessitats:

রুণা (Runa)

  • সমাপ্ত কাজ:
    • Blog post for sprint 37 completion - sent for review (we're a week into the sprint, can we get these out quicker somehow?) (Usually set for sign-off on the Friday following the sprint meeting and publication on the following Monday. Got delayed this time) I'm not sure if this blog post is still useful now.
    • Blog post for jQuery.ime - first draft done and sent to Santhosh for the next part
    • Blog post/support document for the Language Support Team - sent to Alolita and Amir for discussion in tonight's meeting
    • 1 x 1 with Alolita
    • ULS Pilot test with Pau
    • (Took the day off on Wednesday)
  • চলমান কাজ:
  • প্রয়োজন:
    • The meeting with Andre on Monday has been cancelled by him. As a result I get 1.5 free hours which I'd like to use to update the Language Portal. How do I shuffle the cards?
      • If a meeting doesn't happen, and it will not happen in this sprint, you can mark the card completed, as there's nothing more to be done. Then complete your other cards. If then time remains, do something useful with the remaining time. Sounds like a plan? Yes, Thanks.;)
    • Image suggestion for sprint 37 blog post. We have been using TUX screenshots for the last ones. Continue with it or something different?
      • Proofread mode in page view. Did we have that yet? Not yet. Thanks.

സന്തോഷ് (Santhosh)

  • ചെയ്തു:
    • addressing cr comments
    • twn main page polishing
    • CR
    • GSOC idea details - Added more project ideas and details
  • ചെയ്യും:
    • meetings - worried that my internet is not ready for high bandwidth communication :(
      • What's happened? Are you using mobile instead of wired these days?
        • wired is down for the last 3 hours :
        • yesterday night my power backup gone- burned smell and smoke :(
  • വേണം:

Siebrand

  • Done:
    • My planned 1-on-1 w/ Howie was cancelled because directors, comms and C-levels were being briefed on Sue's departure
    • Attended the Analytics showcase. It's a weekly meeting. Not planning on being there every week, as they have no deliverables for us anyway.
    • Asked for a lightning deployment windows with Greg late last night, because there was an outlook of progress on bug 46579 (tweaks for recent fallback changes). Also asked to deploy latest Translate, because some major bug fixes were made, mainly in moving pages. We ended up only deploying Translate, because there was no way we could get Matt's patch set to work as wa thought it should. Niklas did fix a bug or two, and we communicated status back. We advise to revert. I submitted a patch set for that.
    • Code review, twn support done.
    • Had a hangout with http://en.wikipedia.org/ wiki/Ellen_Spertus of Google about Blocky, a "building blocks based programming language for kids" (my words). She left a note on twn's support page about possibly using twn for localisation. Very interesting opportunity. They now use string extraction to gettext. I plugged jquery.i18n as that seems to be particularly appropriate for their use case. We're going to stay in touch and see if we can add Blocky to our supported products as soon as possible. See http://blockly-demo.appspot.com/static/apps/maze/en.html for a demo. Now think any language! (and an "upgrade path" to real JavaScript)
    • Submitted some maintenance patch sets in the special pages area.
    • There was a bug in an export of magic words localisation for Hebrew in ParserFunctions. Alolita phrased it as follows: Subject: "l10n bot updates and build breakage" Body text: The l10n-bot aka translater- updater-bot broke the MW build today with a generic update to ParserFunctions for the Hebrew magic words section. All third parameters were removed in the update. The platform team is unhappy (obviously) with this breakage. Is there any way to have a blacklist of extensions to skip over when running such a change-all bot? I would appreciate a detailed explanation." Detailed explanation follows:
      • Facts indicate that the buzz is quite uninformed.
      • a. "All third parameters were removed in the update." is totally not the reason for breakage. The English strings should be removed. They're legacy.
      • b. the build was not broken, otherwise Jenkins would have whined ( http://stackoverflow.com/questions/1988742/what-exactly-is-considered-breaking-the-build ) It didn't ( https:// gerrit.wikimedia.org/r/#/c/53671/ )
      • c. Hebrew (language code "he") content language wikis had a limited number of localised parser function extension magic words broken, in that a space was replaced by an underscore. This is unfortunate, as are all introductions of bugs, but this situation is hardly unique in our software environment.
      • As for proposed solutions: "Is there any way to have a blacklist of extensions to skip over when running such a change-all bot?": This makes no sense to me at all. See my previous remark on introducing bugs.
      • Personally, I propose we drop the "replace space by underscore on save" for magic words (not for namespace names and special page names) and I think that means we're done with it.
  • Will do:
    • 1-on-1 w/ Alolita
    • GSoC projects prep meeting
    • Weekly team meeting
    • Finally do the twn rally follow-up
    • Process roadmap input and distribute to team for last read before distributing to Product team
  • Need:

Stand-up meeting 2013-03-27 (14:00 UTC)

[edit]

अलोलिता (Alolita):

  • मैंने किया:
    • Software Engineer candidates followup
    • 1:1s
    • Language Portal w Runa
    • GSoC project details - ongoing
  • मैं करूँगी:
    • 1:1s
    • Monthly status update
    • GSoC project details
    • LCM dashboard spec
    • Work on Wikimania talk proposal
    • Followup with Howie on ULS

אמיר (Amir)

  • עשיתי:
    • two days off
    • code review
    • TranslationNotifications bugs
  • אעשה:
    • TranslationNotifications bugs
    • MLEB release
  • צריך:
    • any special considerations about which versions of Translate and ULS to release in MLEB?
      • Latest, as we're still fixing issues, so the later, the better.

Niklas

  • Tein:
    • PT stuff
    • Little bit of main page
    • Signed up to jobvite and got spam
  • Teen:
    • Hungryyy
    • Interrogations
    • rest of tasks except tn +echo
  • Tarvin:
    • This pad is slooooooow
    • Too much to do

Pau

  • Fet:
    • Pilot test with Runa
    • Initial tests on Usertesting.com
  • A fer:
    • Summarize findings
    • Prepare for additional Hangout-based tests
    • 1:1 with Alolita
  • Necessitats:

রুণা (Runa) (day off)

സന്തോഷ് (Santhosh)

  • ചെയ്തു:
    • was off for first half of the day
    • Addressing review comments of patchsets (and they got merged. Nice work)
  • ചെയ്യും:
    • close the review comments and close the cards
    • CR
    • something to do with jobvite
    • read roadmap in details
  • വേണം:

Siebrand

  • Done:
  • Will do:
    • Will probably not be available for about half the day
    • 1-on-1 w/ Howie
    • Join Analytics weekly showcase
    • twn rally follow-up
    • Code review, twn support, ...
  • Need:
    • Less space in the etherpad... This looks really too spacious.

Stand-up meeting 2013-03-26 (14:00 UTC)

[edit]

अलोलिता (Alolita):

  • मैंने किया:
    • Recovering from cold :-(
    • LE SE Candidate resumes followup with recruiters
    • GSoC project details - ongoing
  • मैं करूँगी:
    • Complete GSoC project definitions
    • Candidate followup
    • 1:1s
    • Language coverage specification
    • Expense reports
    • Follow-up w ULS reqs on thread
  • मुझे चाहिए:

אמיר (Amir) (day off)


Niklas

  • Tein:
    • Deployments & followup & prep (Yay! TUX)
  • Teen:
    • main page or page translation issues
  • Tarvin:
    • At this point it looks I wont be finishing some tasks

Pau

রুণা (Runa)

  • সমাপ্ত কাজ:
    • (unproductive first half of the day due to out-of-work circumstances)
  • চলমান কাজ:
    • Blog post for sprint 37
    • Working with ruby for patches for the test scenarios
    • 1x1 with Alolita
    • Not working on wednesday (in sync with a holiday India)
  • প্রয়োজন:

സന്തോഷ് (Santhosh)-(may not attend if bandwidth is not ok for video)

  • ചെയ്തു:
    • ULS modules fix
    • CR
    • addressing cr comments
  • ചെയ്യും:
    • 1:1 with alolita
    • Not available for first half of wednesday
    • (no power and landline internet after heavy rain. in backups for both)
  • വേണം:

Siebrand

  • Done:
    • Addressed early comments on roadmap document
    • Helped Niklas getting twn main page patch sets accepted/merged
    • Helped with code testing and review of deployed patches for Translate and ULS. Did testing of anonymous and logged in translations on Meta, as well as proofreading test in multiple page modes. thanks!
    • Code review on L10n/i18n and code formatting related patch sets, as well as a few general patch sets by IAlex.
    • Submitted some patch sets related to code formatting, did some maintenance on the twn configuration repo.
    • twn support
  • Will do:
    • Look into PT page move scenarios with Niklas
    • twn rally follow-up
    • twn support
    • code review
  • Need:

Stand-up meeting 2013-03-25 (14:00 UTC)

[edit]

अलोलिता (Alolita): Not present. Cold.


אמיר (Amir)

  • Away on Monday and Tuesday - Passover holiday
  • עשיתי:
    • "Recent Additions" filtering:
      • tested my fix, improved it, should be ready for merging
      • learned more about group definition on the way, and improved the documentation
    • Read a paper about Wikipedia articles translation and reviewed it for the Wikimedia Research Newsletter
    • worked on TranslationNotifications bugs
  • אעשה:
    • on Wednesday - TranslationNotifications bugs
  • צרי ך:

Niklas

Pau

রুণা (Runa)

  • সমাপ্ত কাজ:
    • Meeting with Alolita for the Language Matrix visualization specifications
    • Submit the TUX blog post
    • Complete the installations to configure the environment to write the browser tests
  • চলমান কাজ:
    • Study to create browser tests
    • Sprint 37 completion blog
  • প্রয়োজন:
    • The IME awaits a comment

സന്തോഷ് (Santhosh)

  • ചെയ്തു:
    • Allow translation in page mode
    • addressing code review comments
    • (Bug 45480) [TUX] Provide descriptions for statsbar(Need Pau's review)
    • Fix broken long message documentation compact mode.
    • (some urgent pet stuffs, GSOC stuff for my community project)
  • ചെയ്യും:
    • workflow state fix
    • work on tux bugs, patches requiring fixes
    • ULS modules
    • group selector in Special:SearchTranslation(more complex than imagined)
    • (21.5 hours remaining)
  • വേണം:

Siebrand

  • Done:
    • Travelled back home.
    • Jet lag almost gone.
    • Took a day off last Friday.
    • Did imports/exports and some twn support during the weekend.
    • Prepared rough GSoC proposals at request of Quim on mediawiki.org, even though we are supposed to discuss them only on Thursday. Mentorship_programs/Possible_projects#Internationalisation_and_localization
    • Code review on i18n/L10n things in Gerrit
    • OT: Sold my first piece of standard software today! (2 years after I've completed it - 3 whole licenses)
  • Will do:
    • Address early comments on roadmap document
    • Help Niklas getting twn main page patch sets accepted/merged
    • Help Niklas with analyzing Translate PT page move issues
  • Need:
    • Please stay on top of updating reviewed patch sets. Currently 5 PS with -1 in Translate.
    • Discuss how to come to tux=1 default
    • Deployment on Tuesday

Stand-up meeting 2013-03-22 (14:00 UTC)

[edit]

अलोलिता (Alolita):

  • मैंने किया:
    • Weekly team meeting
    • Reviewed TUX blog post for Runa
    • Iterated w HR re: clarifications on remote employee policies
    • Facebook's HipHop VM talk and discussion
    • Hiring followup - Reviewed resumes for open team positions
    • 1:1s
  • मैं करूँगी:
    • Language Coverage Matrix update w Runa
    • Hiring followup
    • Meetings
    • Catchup on pending work, followups today
    • Font specification followup w RHT
  • मुझे चाह&# 2367;ए:

אמיר (Amir)

  • עשיתי:
    • not much - headache all morning
    • bug triage
    • TWN app meeting. The guys are making good progress - proofreading works now. Next tasks: better language selection and project selection (currently it's very rudimentary), proper skipping. After that - start implementing actual translation of messages
    • Added a Hebrew font to jquery.webfonts.
    • Learned a bit of Cucumber from Chris McMahon
  • אעשה:
    • finish task 2564
    • translation notifications bugs
  • צריך:

Niklas

  • Tein:
    • Main page
    • Meetings
    • HipHop from youtube
  • Teen:
    • Weekend
    • Plan deployments
  • Tarvin:

Pau (not attending)

  • Fet:
  • A fer:
    • Complete prototype:
      • Setting changes
      • Annonymous vs. logged user changes
      • Separation of Fonts and UI language selection.
    • Define test plan
  • Necessitats:

রুণা (Runa)

  • সমাপ্ত কাজ:
  • চলমান কাজ:
    • Meeting with Alolita for the Language Matrix visualization specifications
    • Submit the TUX blog post
    • Complete the installations to configure the environment to write the browser tests
  • প্রয়োজন:
    • Ping Santhosh about jquery.ime code

സന്തോഷ് (Santhosh)

  • ചെയ്തു:
    • weekly meeting
    • addressed review comments on my patches
    • group selector in special:searchtranslations
    • bug triaging
    • CR
  • ചെയ്യും:
    • some pets if time permits
    • ULS - more finer level modules
    • CR
    • (24.5 hours of work remaining)
  • വേണം:

Siebrand (day off)

Weekly Team Meeting 2013-03-21 (1800 UTC; 10:00 - 10:30 PT)

[edit]

Sprint Highlights, Major Blockers

[edit]

Amir, Team [5 mins]

Santhosh has 33 hours

Niklas has 50 hours

Amir has 40 hours

Pau has 40,5 hours

Runa has 52,5 hours

Blockers if any - TWN main page tasks have dependencies.


TUX editor improvements update

[edit]

Santhosh [5 mins]

Work on new main page started

Communications, Outreach, QA update

[edit]

Language Team plan, Language Testing, Blog posts, blockers if any.

Runa [5 mins]

ULS update

[edit]

Pau, Alolita [5 mins]

Initial prototype for ULS integration in Wikipedia: http://pauginer.github.com/ prototype-uls/

Update: it's not about ULS anymore.

Deploy to Wikipedia first (UGH!)

ULS is dependency of Translate.

Roadmap update

[edit]

Alolita [5 mins]

Reminders

[edit]

GSoC, Wikimania talk proposals

Alolita [2 mins]

You had "gsoc" box or similar for the roadmap. Can we have that as basis to avoid repeating projects in it?

Yes.

We should have grasp of what we want of Wikimania by April.

Questions? Comments? Feedback?

[edit]

Team [3 mins]

Niklas has not yet received ER (submitted three weeks ago)

Questions to HR:

  • Do we take US or national holidays (or both?) (which of them are paid?)
  • How to handle overtime, usually accumulates during travels
  • How long/many holidays contractors can/should take?
  • Compensation off for extra hours?

Niklas going to wmcon in April.

Akademy talks get confirmed on April 15th

Stand-up meeting 2013-03-21 (14:00 UTC)

[edit]

अलोलिता (Alolita):

  • मैंने किया:
    • 1:1s
    • Meetings, meetings
  • मैं करूँगी:
    • Team meeting
    • 1:1s
    • Hiphop presentation by Facebook at WMF
    • Need to review/signoff for the TUX blog post
  • मुझे चाहिए:
    • Amir - thank you for the home page! :-)
    • Runa - need a photo for your staff page entry :-)

אמיר (Amir)

  • עשיתי:
    • home page for Alolita :)
    • task 2715 - Update Hebrew CLDR
      • Contacted the guy who added the new plural rule - I happen to know him (for reference http://unicode.org/cldr/trac/ticket/4447 ). He explained the change. It's a correct, but rarely used grammatical rule. I think that it's not defined correctly in CLDR, however. After clarifying some things, I reported a CLDR bug: http://unicode.org/cldr/trac/ticket/5828 .
      • I updated the core MediaWiki code. It is still an override, but it's closer to the latest CLDR version. I added documentation, too.
    • task 2564: better filtering for the "additions" message group:

c/54632/ https://gerrit.wikimedia.org/r/#/c/54632/].

      • testing it
  • אעשה:
    • finish task 2564
    • translation notifications bugs
  • צריך:
    • Merging of my pull requests in jquery.ime. Not urgent for anything, but shouldn't stay open for too long.

Niklas

Pau

  • Fet:
  • A fer:
    • Integrate settings into prototype
    • Team meeting
  • Necessitats:
    • Switch language with jquery.i18n for the prototype

রুণা (Runa)

  • সমাপ্ত কাজ:
    • TUX blog post redone
  • চলমান কাজ:
    • Working on the Language Matrix tasks to be prepared for the tech-spec meeting tomorrow
    • File issues in uls
    • Weekly meeting
  • প্রয়োজন:

സന്തോഷ് (Santhosh) (did not join)

  • ചെയ്തു:
    • Working on twn frontpage html skeleton
  • ചെയ്യും:
  • വേണം:

Siebrand (traveling back to NL)

Stand-up meeting 2013-03-20 (14:00 UTC)

[edit]

अलोलिता (Alolita):

  • मैंने किया:
    • Final Roadmapping session w Siebrand
    • Sprint planning (closing session, demos, retrospective, opening session)
    • Meeting on Indic fonts
    • 1:1s
  • मैं करूँगी:
    • 1:1s
    • Meetings w Google
    • Touch base w Siebrand before he goes back home
  • मुझे चाहिए:

אמיר (Amir)

  • עשיתי:
    • Times for bug triage and Language team meeting. Thanks to Runa.
    • read the shared roadmap doc
    • restoring my TranslationNotifications installation - haven't touched it in a while
    • proofreading tooltips fixed according to feedback from Pau and Siebrand
    • !additions group fixes
    • a little conversation with CIS, suggested them how to do their work better - to learn the data about the languages before investing resources
    • OPW: helpng Priyanka deploy her work on the Bengali Wikipedia
  • אעשה:
    • TranslationNotifications bugs
  • צריך:

Niklas

  • Tein:
    • Read the roadmap
    • front page skeleton in translatewiki.git repo in gerrit
    • code review (Lua embedded in PHP in jobqueue)
    • Commit summaries nobody reads
  • Teen:
  • Tarvin:

Pau

  • Fet:
    • sprint planning
    • Summary of ULs meeting (waiting for confirmation from Howie and Erik)
    • Started to work on ULS prototype for wikipedia integration
  • A fer:
    • Work on ULS prototype
    • 1:1 with Alolita
  • Necessitats:

রুণা (Runa)

  • সমাপ্ত কাজ:
    • IME work, updated
    • set meetings
  • চলমান কাজ:
    • working on blogs: TUX and volunteer contributor
  • প্রয়োজন:

സന്തോഷ് (Santhosh)

  • ചെയ്തു:
    • Position group selector menu correctly (Merged)
    • Remove custom plurals for Nso and Sl in favour of CLDR (Merged), made all tests for Kaldari's patch passed
    • Use ULS for long language list in SearchTranslations
    • (Bug 46237) - [TUX] "You have unsaved changes" warning broken
    • (Bug 45639) - [TUX] Messages from wrong message group displayed
  • ചെയ്യും:
    • twn main page
    • Offline till 1 PM IST, also less working time(house maintanance going on)
    • 37 hrs for the sprint remaining
  • വേണം:

Stand-up meeting 2013-03-18 (14:00 UTC)

[edit]

अलोलिता (Alolita):

  • मैंने किया:
    • Roadmapping w Siebrand
    • 1:1s
    • JD up
  • मैं करूँगी:
    • ULS
    • Roadmapping w Siebrand
    • Sprint planning
  • मुझे चाहिए:

אמיר (Amir)

Niklas

  • Tein:
    • Remaining cards
    • Code review
    • Investigating git issues on twn
  • Teen:
    • Not much time before sprint ends
  • Tarvin:
    • No i18n deployment tomorrow

Pau

রুণা (Runa)

  • সমাপ্ত কাজ:
    • Meeting with Chris MacMohan
    • Meeting With Andre. Notes sent to the mailing list.
    • Translate tour and checking through the design spec for the blog post
    • Blog post for TUX - first draft sent out for review (Thanks!)
    • Language Matrix - Report of work done
    • Submitted a talk for Akademy
  • চলমান কাজ:
    • New input method for Sanskrit - check the syntax error
    • Language Support Team - Signup form for the pilot
    • Browser support matrix
  • প্রয়োজন:
    • Language test plan document - not sure if its done, Google Drive is not opening
    • Lang Support Matrix meeting - meeting time is in short supply :)

സന്തോഷ് (Santhosh)

Siebrand (not present to prevent 18 hour day)

  • Done:
    • Meeting about i18n testing /w Chris and Zjelko. Exiting outcome, that Runa will probably already have told you about.
    • Roadmapping
    • twn support and exports
    • Changes for FreeCol done (move from subversion to git), and follow-up some trailing whitespace issues and duplicate keys
  • Will do:
    • Meeting on ULS launch points (2h) with Howie, Pau, Alolita (done)
    • Review my new contract, and sign or provide feedback to HR (~1h) (done)
    • Lunch with Patrick of change.org, w/ Alolita (done)
    • Prepare presentation on "Current i18n status" for Wikia on Tuesday (17:00 UTC or so) (~3h) (done)
    • Prepare roadmap meeting (1h) (done)
    • Roadmap meeting (2h) w/ Alolita (in progress)
    • Prepare new sprint (~2h)
    • Sprint end meeting (2h)
  • Need:
    • Please everyone prioritize getting code reviewed, fixed and merged on the last day of the sprint, before creating new patch sets. When creating new patch sets, immediately seek a review after submitting.

Stand-up meeting 2013-03-15 (14:00 UTC)

[edit]

अलोलिता (Alolita):

  • मैंने किया:
    • Weekly team meeting
    • 1:1s
    • Budgets
    • Language Support Team discussion w Runa, Amir
    • LUA meets Wikipedia - presentation
  • मैं करूँगी:
    • Roadmapping w Siebrand
    • Hiring follow-up (HR should have posted the JD already)
    • Budgets
    • Conversation w Google India on web fonts
    • Wikimania talk proposal development (going to be on the weekend)
  • मुझे चाहिए:
    • Review Language Test Plan before it is published
    • Review Language Coverage Matrix (good work Runa!)
    • Blogpost by Siebrand on conference and presentation

אמיר (Amir)

  • עשיתי:
    • Language Support Team discussion w Runa, Alolita
    • code review and rebasing
      • Echo i18n - bsitu
      • TUX
    • bugs
  • אעשה:
    • more code review
    • bugs all over the weekend
    • meeting about testing with Runa, Chris, Željko, Siebrand
  • צריך:

Niklas

Pau

রুণা (Runa)

  • সমাপ্ত কাজ:
    • Language Matrix - mapping with ULS language list and information from jquery.i18n module
    • Meeting with Alolita and Amir about the Support team
    • Weekly meeting
  • চলমান কাজ:
    • Language Matrix - Report of work done
    • New input method for Sanskrit - ran into a syntax error
    • Language Support Team - Signup form for the pilot
    • Translate tour and checking through the design spec for the blog post
    • Meeting with Chris MacMohan's team
  • প্রয়োজন:
    • Language test plan - not sure if the document is to go into mediawiki.org
    • Contributor collaboration blog will not happen this spring - what should i do with the card?

സന്തോഷ് (Santhosh)

  • ചെയ്തു:
    • CR
    • weekly meeting
    • bugs
      • (Bug 45559) - Clicking group selector does nothing until data is loaded
      • Fix javascript error on click on Show all messages link (Merged)
      • (Bug 45959) [TUX] Workflow state selector hard to hide (Merged)
      • Update jquery.uls - compact mode changes- optional
  • ചെയ്യും:
    • CR
  • വേണം:
    • CR

Siebrand

  • Done:
    • At http://www.lingoport.com/events/2013-internationalization-localization-conference/ all day. About 32 mins of content and 15 mins of demos and questions. Interesting information exchanges. The recorded presentations should come online within a week or so. It was very intense to come across so much positive energy towards what we are doing with Wikipedia and all of the languages we have projects in. I think I often forget that what we are doing is pretty special (Santhosh: "We are inside. you can appreciate only when you go outside and watch :)")
      • I got invited to "think Latin America" in April in Ireland (http://thinklatinamerica.com/ ) for participating in a workshop on crowd translation.
  • Will do:
    • Meeting about i18n testing
    • Lunch w/ Alolita
    • Roadmapping
  • Need:

Weekly Team Meeting 2013-03-14 (1800 UTC; 10:15 - 10:45 PT)

[edit]

Sprint Highlights, Major Blockers

[edit]

Team [3 mins]

Amir has 22 hours, Pau 12 hours

We are fixing bugs, but more appear all the time.


TUX editor improvements update

[edit]

Santhosh [3 mins]

Few features added - translation search page integrating ULS with a 6 language list, more messages, edge cases, polishing, minor usability issues, proofreading has improved dramatically (showing other people count reading proofreading page, more compact and readable)

Translate search improvements

[edit]

Niklas [3 mins]

  • We are collecting feedback
  • Will need schema update later on
  • Only minor bug fixes in sprint...
  • Apart from deploying Solr to twn production

Thinking about Content+Page Translation

[edit]

Alolita [5 mins]

Start for seriously thinking the workflows.

Amir notes: avoid getting stuck too deeply into foundations internal needs.

Having Translate also in WMF's workflows makes it even more important.

Roadmap update

[edit]

Alolita [5 mins]

Seven buckets.

Communications, Outreach, QA update

[edit]

Language Team plan, Office Hours feedback etc.

Runa [3 mins]

Language Tools Testing update

[edit]

Runa, Amir [3 mins]

Questions? Comments? Feedback?

[edit]

Team [5 mins]

Expense report outline will be sent by Rachel


Stand-up meeting 2013-03-14 (14:00 UTC)

[edit]

अलोलिता (Alolita):

  • मै&# 2306;ने किया:
    • Team office hours
    • Roadmapping w Siebrand
    • 1:1s
    • Internships discussion
    • Content translation discussion w Comm team (Tilman)
  • मैं करूँगी:
    • Weekly team meeting
    • 1:1s
    • Budgets
    • Language Support Team discussion w Runa, Amir
    • Wikimania talk proposal development
    • LUA meets Wikipedia - presentation
  • मुझे चाहिए:

אמיר (Amir)

  • עשיתי:
    • tooltip preference - committed
    • 2604 - revert translation - mostly done
    • 2684 - started learning how it works
  • אעשה:
    • more bugs
    • Language Support Team discussion with Runa, Alolita
  • צריך:

Niklas

Pau

  • Fet:
    • CSS styling
    • Office hours
  • A fer:
    • CSS review
    • Competitive review for UI vs content selection
  • Necessitats:

রুণা (Runa)

  • সমাপ্ত কাজ:
    • Language Matrix - unique language mappings done
    • Office hour - done
  • চলমান কাজ:
    • Language Matrix - Map information from jQuery.i18n (grammar rules) and jQuery.uls (langdb.yaml)
    • Blog post about TUX design summary for translators
    • Weekly Meeting
    • Meeting with Alolita and Amir for the Language Support Team
    • 1 x 1 with Alolita
  • প্রয়োজন:
    • May have to ping Pau about the blog post

സന്തോഷ് (Santhosh)

  • ചെയ്തു:
    • Team office hours
    • bugs
      • Add Tuladha Jejeg font for Javanese( webfonts, ULS)
      • Use ULS for long language list in SearchTranslations page(took more time than expected)
      • (Bug 45959) - [TUX] Workflow state selector hard to hide/de-expand
  • ചെയ്യും:
    • meetings- 1:1, weekly
    • random bug squashing
  • വേണം:

Siebrand (not present)

Stand-up meeting 2013-03-13 (14:00 UTC)

[edit]

अलोलिता (Alolita):

  • मैंने किया:
  • मैं करूँगी:
    • Team office hours
    • Roadmapping w Siebrand
    • 1:1s
    • Language Support Team discussion w Runa, Amir
    • Wikimania talk proposal development
    • Internships discussion
  • मुझ& #2375; चाहिए:

אמיר (Amir)

  • עשיתי:
    • finished 2577, 2579
    • started 2604 - Allow to restore original translation
    • code review
    • proofread the final version of the testing plan draft, for presentation at the team meeting
  • אעשה:
    • language teams meeting
    • office hours
    • bugs
  • צריך:

Niklas

  • Tein:
    • Optimizing pngs
    • Code review and testing TUX
    • Documentation updates
    • Fixed maps in translatewiki.net
    • ((( Started preparing Akademy proposal )))
    • Emailed Greg
  • Teen:
    • Office hours
    • Fix my -1 patches
    • ((( My first financial statement ))) <- Congrats! :)

Pau

রুণা (Runa)

  • সমাপ্ত কাজ:
    • Testing plan document
  • চলমান কাজ:
    • Language Matrix document - unique language mapping code
    • Office hour
    • Meeting with Amir and Alolita about the Language Support Team
  • প্রয়োজন:
    • Feedback about the earlier document for the Language support team. Can be addressed during the meeting tonight with Alolita and Amir.
    • Information for the Office-hour text and people willing to take lead for any of the sections in the agenda

സന്തോഷ് (Santhosh)

  • ചെയ്തു:
    • bugs
      • Update jquery.ime from upstream
      • (Bug 42378) - Make "disable IME tools" effects immediate as a preview(was planned for sprint 38)
      • (Bug 46050) - [TUX] Skip and next does not work in filtered list
      • Remove unwanted h1 underline in SpecialSearchTranslation
    • CR
  • ചെയ്യും:
    • bugs(8.5 hours in this sprint)
    • office hours
  • വേണം:

Siebrand

  • Done:
    • ULS meeting with Pau, Alolita, Howie and Erik.
    • Remote employee taskforce meeting
    • Prepared presentation story line (no actial content yet) for Thursday
    • Reviewed and merged a lot of code. Mostly code by IAlex and Shirayuki
  • Will do:
    • Prepare presentation
    • Office hours
    • Lunch meeting with Erik Moeller (tentative)
    • Language Module discussion (no further information, meeting with Brandon, Ori, Kaldari, Steven Walling)
    • "Product Management: Career Path" meeting
    • 1:1 w/ Howie
    • Roadmapping
  • Need:

Stand-up meeting 2013-03-12 (14:00 UTC)

[edit]

अलोलिता (Alolita):

  • मैंने किया:
    • Roadmapping w Siebrand
    • Budgeting
    • TechOps review
    • Review blogpost for sprint 36
  • मैं करूँगी:
    • ULS discussion
    • Budgeting
    • Wikimania talk proposal development
    • Roadmapping
    • Review Language Testing progress
    • Remote Employee Task Force

אמיר (Amir)

Niklas

  • Tein:
    • Started with Translate documentation
    • Registered for ams
    • Debugged export issues for Siebrand
    • Bug triage with Runa...
    • Little code review
  • Teen:
    • Office hours
    • Bugs, docs

Pau

রুণা (Runa)

  • সমাপ্ত কাজ:
  • চলমান কাজ:
    • Document for the testing plan
    • Language Support Team - spec document

സന്തോഷ് (Santhosh)

  • ചെയ്തു:
    • bugs
      • (Bug 45551) Show other user votes when proofreading (Merged)
      • (Bug 45552) Add Unproofread filter for the Proofread view
    • bug triage
    • cr
  • ചെയ്യും:
    • cr
    • bugs

Siebrand

  • Done:
    • Changed hotels
    • Lots of "How 'ya doin'"
    • Meeting with Howie
    • Roadmap meeting with Alolita at end of day
    • Reviewed code
    • Code quality patches for Milkshake and Translate
  • Will do:
    • ULS meeting with Pau, Alolita, Howie and Erik.
    • Remote employee taskforce meeting -- any high priority input?
    • Preparation of presentation for Thursday
  • Need:
    • So much to do, so little time...

Stand-up meeting 2013-03-11 (14:00 UTC)

[edit]

अलोलिता (Alolita):

  • मैंने किया:
    • Language test matrix review
    • Budget discussions
    • Roadmap thinking
    • ULS scenarios by Pau review
  • मैं करूँगी:
    • Roadmapping w Siebrand
    • Budgeting
    • TechOps review
    • Wikimania talk proposal development
    • Review blogpost for sprint 36
  • मुझे चाहिए:
    • More time needed to process raw images for Ellora Caves to complete upload

אמיר (Amir)

Niklas

  • Tein:
    • Solr
    • Fun Translate stuff
    • Roadmap input
    • Wikimania talk proposal udpate
    • Reading a book
  • Teen:
    • Meet runa
    • Few bugs still to fix
    • Start with translate documentation
  • Tarvin:
    • Anything to deploy? - no deployments tomorrow

Pau

রুণা (Runa)

  • সমাপ্ত কাজ:
  • চলমান কাজ:
    • Prepare for office hours
    • Submit blog for publishing
    • Language Support Team - spec document
    • Any other preparation for bug triage tomorrow
  • প্রয়োজন:
    • Sign off for the sprint 36 submission blog

സന്തോഷ് (Santhosh)

  • ചെയ്തു:
    • Sent the roadmap
    • (Bug 45423) Add "Loading..." while translation helpers are loading
    • (Bug 45433) - Floating/sticking headers/footers should be adjusted when ...
    • Show message when the language is blacklisted
    • Api should not return results for blacklisted languages
    • (bug 45639) Messages from wrong message group displayed
    • (Bug 45434) - [TUX] Unclear filtering completion status (Merged)
    • update jquery.ime from upstream
    • jquery.i18n grammar support for Malayalam- dative and genitive. #pet http://thottingal.in/projects/js/jquery.i18n/demo/mlgrammar.html
    • CR
  • ചെയ്യും:
    • more bug squashing
    • CR
    • bug triage tomorrow #2649
  • വ&# 3399;ണം:

Siebrand

  • Done:
    • Travelled to SF, trying to beat the jetlag.
    • Went to office on Sunday. Had meeting with JamesF and OliverK
    • (Re)read all your roadmap input. Thanks a lot. There are great ideas in there.
    • Planned roadmap meetings with Alolita for today, Friday and next Monday.
    • Did exports on twn and some Support, but not much
    • Saw three films; slept through most of one of them on Saturday evening. Fell asleep even before it started :).
  • Will do:
    • Change hotels
    • Lots of "How 'ya doin'"
    • Meeting with Howie
    • Roadmap meeting with Alolita at end of day
  • Need:

Stand-up meeting 2013-03-08 (08:00 UTC)

[edit]

אמיר (Amir)

  • עשיתי:
  • אעשה:
    • finish 2600 and 2579
    • roadmap wishlist
  • צריך:
    • details about behavior and suggestions about internal implementations forhttps://mingle.corp.wikimedia.org/projects/internationalization/cards/2600:
      • Pau: Does it attach to all the buttons in all the lines?
        • To all buttons
      • Pau: Does it appear on hover or always?
        • On hover. There is an especial case: the first time* the user accesses the proofread mode, on the first proofread mark only (and only if it is unmarked) a tooltip will appear automatically to invite the user to start proofreading. *Alternatively, if tracking first time is difficult, we can do it for users that had not proofread yet each time they enter the proofread mode.
      • Pau: Does it appear in any way to users who already proofread something?
        • Yes but only on hover. If the message is already proofread, the tooltip should indicate "unmark as proofread" instead. The automatic initial tooltip is only for "new proofreading users".
      • Niklas: How to implement it: check translate_reviews (problematic)? add a user preference? add a cookie? something else?
    • Pau: Images for https://mingle.corp.wikimedia.org/projects/internationalization/cards/2579

Niklas

  • Tein:
    • TUX fixes
    • LQT bug investigation
    • Translatewiki.net server maintenance
    • Weekly
    • Monthly
  • Teen:
    • Clean up my roadmap suggestions and send them
    • Update my Wikimania talk proposal
    • Working only until noon
  • Tarvin:
    • Are the photos from the India trip (especially the caves) uploaded to somewhere?
      • SM: I have some, obviously, but they're still only on my phone...

Pau

রুণা (Runa)

  • সমাপ্ত কাজ:
    • Meeting with Amir and first draft of the document for the testing plan was created.
    • sprint 36 blog shared for review
    • Weekly Meeting
    • Roadmap document - reviewed (need to take another closer look)
    • Wikimania talk details added
  • চলমান কাজ:
    • Blog - draft for the blog on community collaboration
    • Test scenarios for the browser tests
    • Bug triaging
  • প্রয়োজন:

സന്തോഷ് (Santhosh)

  • ചെയ്തു:
    • bug fixes
    • meeting
  • ചെയ്യും:
    • more bug fixes
    • roadmap
  • വേണം:

Siebrand

  • Gedaan:
    • Alolita did not show up for planned 1-on-1.
    • Weekly team meeting
    • Monthly metrics meeting. Apparently there was hot pizza, so the talk with Sue was very brief. I wasn't able to locate the pizza, though.
    • Attended workshop on EventLogging
    • Did code review and merging, mostly for Translate
    • Processed FFS changes for PythonSingleFFS in pywikipediabot. One remaining issue. Made Niklas aware of that. I put a temporary fix in place to be able to generate proper export files.
  • Te doen:
    • Pack and leave for San Francisco.
    • Working for another client today.
  • Nodig:

Weekly Team Meeting 2013-03-07 (1800 UTC; 10:00 - 10:30 PT)

[edit]

Sprint Highlights, Major Blockers

[edit]

Siebrand [5 mins]


Big push on TUX and other important bugs in bugzilla. We have planned 43 for fixing 2 days ago. We have now been able to close 13 (mingle data of 30 minutes before meeting started). Sprint is on track, as far as it's possible to say about 20% in.


Latest TUX Editor, Proof reading feature Demo

[edit]

Santhosh, Pau [10 mins]

Live demo, live bugs - squashed.


March 13 office hours prep / topics / communications update

[edit]

Runa [5 mins]


Analytics workshop on March 7 and i18n metrics update

[edit]

Alolita - [5 mins]


Testing plan update

[edit]

Amir and Runa (5 mins)

Document shared for context


Questions? Comments? Feedback?

[edit]

Team [5 mins]

Font Spec - Pravin has no time to work on spec till end of March :-(

   Santhosh will post on FB about font spec now available on github in LaTEX

Stand-up meeting 2013-03-07 (08:00 UTC)

[edit]

אמיר (Amir)

  • עשיתי:
    • unread emails reduction (97 -> 14)
    • set times for meetings with Runa
    • 2571 - http://bugzilla.wikimedia.org/45432 (was resolved already, verified)
    • code review
    • testing i18n in the Commons mobile app
  • אעשה:
    • meeting with Runa on Language test plan
    • bugs!
  • צריך:

Niklas

  • Tein:
    • Lot of TUX and TUX-inspired bug fixes and patches
    • Started preparing roadmap input
    • Started preparing amsterdam toto list
    • Asked Siebrand to set owners for stories (please check)
    • 1:1 with Alolita
  • Teen:
    • Squash more bugs
    • Weekly meeting
    • Read blog post about Parsoid
  • Tarvin:

Pau

  • Fet:
    • Styling for empty message in the list
    • Adjustments on side-by-side view to accomodate short messages
    • 1:1 with Alolita
  • A fer:
    • Ideas for roadmap
    • Exemplify ULS content language selection & integration in WP
    • Empty tux etherpad
  • Necessitats:

রুণা (Runa)

  • সমাপ্ত কাজ:
    • cleared email backlog
    • Started working on 2 blogs
  • চলমান কাজ:
    • Work on blogs
    • Meeting with Amir
    • Review the roadmap document
    • Wikimania talk details
    • Weekly meeting
  • প্রয়োজন:

സന്തോഷ് (Santhosh)

  • ചെയ്തു:
    • Update jquery.uls from upstream
    • Api should not return results for blacklisted languages
    • Show message when the language is blacklisted
    • (Bug 45739) Pre-fetch information for the first element of the message list (merged)
    • (Bug 45546) [TUX] Filtering by a word does not work for non-Latin scripts (Merged)
    • (Bug 45689) [TUX] Add tooltip to expand and close icons (Merged)
    • Update jquery.ime from upstream (Merged)
  • ചെയ്യും:
    • CR
    • rest of the cards
    • weekly midnight team meeting
  • വേണം:

Siebrand

  • Gedaan:
  • Te doen:
  • Nodig:

Stand-up meeting 2013-03-04 (08:00 UTC)

[edit]

אמיר (Amir)

  • עשיתי:
    • Thursday - MLEB release
    • Weekend - vacation, totally offline.
  • אעשה:
    • 2431 - Diffs for translatable page unit changes not okay
    • 2478 - IME should stay enabled on next message
  • צריך:

Niklas

translatewiki.net/wiki/Project:News http://translatewiki.net/wiki/Project:News]

Pau

রুণা (Runa)

  • সমাপ্ত কাজ:
    • Bug triaging - partially and hit by blockers
    • Office hour preparation - document shared on drive for sign-off on the announcement
    • Language team proposal - reading done
    • Language Matrix - details of the web-fonts have been verified
  • চলমান কাজ:
    • Language team proposal page - final review and implementation spec
    • Detailed proposal for Wikimania
    • Language portal page - add information
    • Send out a summary report of the information in the language matrix to the team mailing list
    • Create task list for tomorrow's meeting
  • প্রয়োজন:
    • Can't find needinfo extension/field on WMF bugzilla
    • Taking too much time to cross refer the bugs (mostly Narayam) and their status on ULS

സന്തോഷ് (Santhosh)

  • ചെയ്തു:
    • CR
    • bugs(dont remember the list)
    • ((public talk to librarians about digital libraries, wikisource))
  • ചെയ്യും:
    • work on font specification
    • more bugs
    • CR
  • വേണം:

Siebrand

Stand-up meeting 2013-03-01 (08:00 UTC)

[edit]

אמיר (Amir) (off)

Niklas

  • Tein:
    • Converted half of Translate logging to LogFormatter
    • Watched partly techchat
    • 1:1 with Alolita
    • Little TUX code review
    • Filed some annoying TUX bugs into bugzilla
  • Teen:
    • Meeting with Siebrand and Wikia
    • Reply to Chris S.
    • Other half of logging
    • Should finish Wikimania talk proposal
    • TUX stuff
    • Email Chad asking to have "delete tags" permission fixed (perhaps went away during upgrade?) Noticed yesterday when we were doing MLEB release
    • Update translatewiki.net uptime for February
  • Tarvin:
    • I got 23 "Updated Invitation: Daily meeting" emails from Siebrand during February

Pau

  • Fet:
    • Complete the UX testing summary
    • Review Amir patschet
    • Proofreading markers into sprites
  • A fer:
    • Pending designs
    • 1:1 with Alolita
  • Necessitats:

রুণা (Runa)

സന്തോഷ് (Santhosh)

  • ചെയ്തു:
    • (bug 45421) Avoid inconsistencies in breadcrumbs of project selector
    • (bug 45494) Make "translated" the default filter for proofreading merged
    • (bug 45556) Show blue pencil mark for untranslated messages merged
    • (bug 45547) Add the "page" view for a side-by-side translation
    • Unbreak group selector in old interface merged
    • Allow insert from helper language merged
    • no 1:1
  • ചെയ്യും:
    • more bugs
  • വേണം:

Stand-up meeting 2013-02-28 (08:00 UTC)

[edit]

אמיר (Amir)

Niklas

  • Tein:
    • Some cr
    • expense report
    • presentation and meeting
  • Teen:
    • figure out why today is flag day (hint: wikipedia)
    • tux or logging tasks
  • Tarvin:

Pau

  • Fet:
    • Styling Proofreading UI
    • Design walkthrough
    • Added some more bugs
  • A fer:
    • Complete the UX testing summary
    • Pending designs
    • Review Amir patschet
  • Necessitats:

রুণা (Runa)

  • সমাপ্ত কাজ:
    • Blog for gnunify published.
    • Blog for sprint 35 completion - submitted
    • Deprecated links from the Language Portal - noted down
    • Attended Weekly meeting
    • Attended Pau's presentation
    • Started working on test scenarios for IME
  • চলমান কাজ:
    • Compare the list of languages in the matrix with the ULS list and Names.php
    • Add sorted details of the IMs and Web-fonts
    • Start on the office hour preparation
    • Start on bug triaging
  • প্রয়োজন:
    • Should I give lower priority to the last remaining blog post in favour of bug triaging? Probably...

സന്തോഷ് (Santhosh)

  • ചെയ്തു:
    • (bug 45494) Make "translated" the default filter for proofreading
    • (bug 45481) Move focus to search for the project selector
    • (bug 45488) Remove delay in enablement of "save translation" button
    • interview with candidate
    • meetings
  • ചെയ്യും:
    • more bugs and CR
  • വേണം:

Siebrand

  • Gedaan:
    • Attended Translate UX design walkthrough
    • Weekly team meeting
    • Changed changed "e-mail" to "email" in core and extensions
  • Te doen:
    • Briefing on 2013-2014 roadmap process and request for input.
    • Take care of the kids. Kind of a full time parent until Monday evening; will try to do as much as I can.
  • Nodig:

Weekly Team Meeting 2013-02-27 (10:00 - 10:30 PT)

[edit]

Sprint Highlights, Major Blockers

[edit]

Siebrand [5 mins]

Sprint is short, 7 days instead of the regular 9. Amir at 60% because of extended stay in India and Niklas at 40% or less because of illness. Output will be relatively low, compared to a full sprint where everyone's completely available.

NL: wanted to have few days off after travel anyway, happened this way :o

Dealing with Niklas' illness by reducing planning by 21 hours. Details: Moved "Translate logging update" story to release backlog (-5h) (possibly next sprint priority), deleted "bug fixing and other fun stuff" (-4), TUX code review from 8 to 4 hours because there's not that much code to review anymore (-4) and unassiged tasks for TUX (-8) that Santhosh may be able to pick up, as he's ahead with his work.

Red areas:

  • Runa: 37.5 hours open
  • Amir: 23.5 hours open with 1 day of work left because of time off until Monday from "now" on.
  • Siebrand: 22.5 open with about 1 day of work left -- will be busy in the weekend and at night...
  • Niklas: free to pick anything on the *sprint* backlog

Blog posts and communications update

[edit]

Runa [5 mins]

Since the last weekly meeting we have published 2 blogs. 1 more is in review and another ready to be posted tomorrow. Besides the blogs we have published two event reports. 1 more is planned for this sprint.

For March, 4 more blog posts can be planned. 2 will be sprint completion blogs for sprint 36 and 37. For 2 others, I was planning on having feature highlights from the ULS (if not done already) and a collaboration discussion.

Besides these, the office hours is planned for 13th March and preparation needs to be done for it. -> communication about 10 days before, 1 day before and 1 hour before to wikimedia-l and mediawiki-i18n mailing lists. See previous announcements. Aside from the topics, my advice would be to not spend too much time on formulating new text each time. Clarity of the message is most important, so if you see a way to improve that, don't hesitate to interate(?) with that in mind.

Language Summit follow-up update

[edit]

Alolita - [5 mins]

i18n/L10n Roadmap for 2013-14

[edit]

Alolita [5 mins]

Siebrand sends instructions to everyone this week, everyone provides input next week.

Changing daily standup time for Alolita to join in

[edit]

Team [5 mins]

Possible times are:

March 11 onwards -

0700-0720 PDT (16:00 - 16:20 CET ,17:00-17:20, 18:30 -18:50 IST)

SM: +1.PG: +1, AS +1, RB: +1, ST+1

NL: +0.8

1000-1020 PDT (1900-1920 CET, 2330-2350 IST),

- (ST: -1) (RB: -1)

2200-2220 PDT (0700-0720 CET, 1130-1150 IST),

2130-2150 PDT (0630-0650 CET, 1100-1120 IST)

Sticking with the current time:

0000-0020 PDT (0900-0920 CET, 1330-1350 IST)

NL: waking up regularly before 0700 CET can be difficult for me (it's unlikely I would go sleeping earlier)

Questions? Comments? Feedback?

[edit]

Team [5 mins]

NL: When to expect confirmations for Ams/Wikimania?

NL: Going to Wmcon in April (18–21 at Milan), eats two working days

ST: List our job opening at wikimediafoundation.org/wiki/job_openings?

Stand-up meeting 2013-02-27 (08:00 UTC)

[edit]

אמיר (Amir)

  • עשית&# 1497;:
    • code review
    • 2449 - Implement "Hide your translations" button in proofread view - committed WIP, seems to work correctly, but needs code cleanup and visual styling
    • Started 2451 - Implement search filter in proofread view
    • a bit of proofreading for Runa's posts
  • אעשה:
    • task 2431 - diffs bug
    • finish 2451 - Implement search filter in proofread view
    • MLEB release
  • צריך:
    • Santhosh, Pau: review https://gerrit.wikimedia.org/r/#/c/51112/
    • Which Translate version to pick for the MLEB release? Before the proofread changes started? -- One more day after this in Feb. Do we need to address the fatal for ULS in <1.21.

Niklas

  • Tein:
    • Little bit of code review
  • Teen:
    • Meetings
    • Catchup emails
    • Finish expense reports
  • Tarvin:

Pau

  • Fet:
    • Testing with Runa
    • Walkthrough announced
    • Some bugs filled
  • A fer:
    • Summarizing UX testing findings
    • Add more bugs to bugzilla
    • Review and styling of proofreadig UI
    • Review Amir's patchset
    • Design walkthrough
  • Necessitats:

রুণা (Runa)

  • সমাপ্ত কাজ:
    • Gnunify Event Report page - created
    • Gnunify blog - submitted for review
    • Usability test with Pau
    • Languages from the incubator projects included in the matrix
    • Reviewed the gerrit patch for Amir
  • চলমান কাজ:
    • Verify names of the languages in Names.php and ULS lang.db with the list in the matrix
    • Test scenarios
  • প্রয়োজন:

സന്തോഷ് (Santhosh) (not present)

Siebrand

Stand-up meeting 2013-02-26 (08:00 UTC)

[edit]

אמיר (Amir)

  • עשיתי:
    • Addressed Niklas' comments in https://gerrit.wikimedia.org/r/#/c/49977/
    • Reviewed Santhosh's proofread changes
    • Meeting with Santhosh and Pau about proofreading status.
    • Started "Hide your translations" button.
  • אעשה:
    • Finish "Hide your translations" button. (2449)
    • Finish task 2431, if Niklas is online.
    • Start 2451 - Implement search filter in proofread view
  • צריך:

Niklas (ill)

Pau

  • Fet:
    • Adapted editor prototype to bn and hi
    • Styling of Proofread UI
  • A fer:
    • Bugs on bugzilla
    • Testing session with Runa
    • Announce tomorrow's design walkthrough
  • Necessitats:

রুণা (Runa)

  • সমাপ্ত কাজ:
  • চলমান কাজ:
    • Adding languages from the Incubator into the language matrix
    • Usability test with Pau
    • Gerrit review for Pali language autonym
    • Browser testing scenarios
  • প্রয়োজন:

സന്തോഷ് (Santhosh)

  • ചെയ്തു:
    • Proofread - more polishing, reviews, merges
    • groupselector - some fixes
  • ചെയ്യും:
    • CR(github and gerrit)
    • (might take some 3 hr off tomorrow morning IST)
  • വേണം:

Siebrand

  • Gedaan:
    • Did a bunch of code review; not enough to my liking, but hey...
    • Started expense report for Pune trip; need to do a few more (SF September, Pune/Bangalore November, Brussels February). Shared data found with others present by e-mail and Google doc.
    • twn support
    • Did some L10n QA on twn. Mostly for Echo and RevisionCommentSupplement. Dogfooding TUX at the same time.
  • Te doen:
    • Review prepared communications
    • #2516: Prepare communication for translators
    • #2485: twn: rally follow-up
    • #2498: Code review Siebrand s36w2
  • Nodig:

Stand-up meeting 2013-02-25 (08:00 UTC)

[edit]

אמיר (Amir)

  • עשיתי:
    • recovering
    • expense reports
    • code review
  • אעשה:
    • resolve issues in my current patches
    • start with proofread tasks
  • צריך:

Niklas

  • Tein:
    • Recovering
    • Necessary SMW migration on translatewiki.net
    • Caught up with emails
  • Teen:
    • More recovering(?)
  • Tarvin:
    • Notes to fill ER

Pau

  • Fet:
    • EE and design stuff
  • A fer:
    • Adapt prototypes
    • Review Proofread UI
    • Fill bugs at bugzilla for UX issues
  • Necessitats:

রুণা (Runa)

  • সমাপ্ত কাজ:
    • Event blog - ready for signoff (due for publication: 27.02)
    • Event report - ready for signoff
  • চলমান কাজ:
    • sprint completion blog - writing (due for publication: 28.02)
    • Browser testing scenarios
    • Review list of languages in language matrix (existing and incubator)
  • প্রয়োজন:
    • May need inputs for the sprint blog
    • Gnunify photo for the blog/report

സന്തോഷ് (Santhosh)

Siebrand

  • Gedaan:
    • Had a meeting with QA Chris, Zeljko and Runa. They have very impressive tools -- https://wmf.ci.cloudbees.com/ . We wrote some scenarios that they implemented: http://etherpad.wikimedia.org/i18n-qa . Need more test content there for ULS initially and TUX later. We also need to decide on which wiki will be test wiki (sandbox?) and update that often (once/hour on schedule?) so that tests run against an updated master.
    • Integrated FUEL further into the twn workflow. Using git repo now, and updated configurations to match file structure in repo. Found that #. docs are not displayed in TUX editor, reported as bug (HIGH prio next sprint, because regression).
    • Got feedback from Ankit. He pointed out two issues, that I reported. I replied with CC to team list.
    • Did updates and exports on twn
    • Did code review for most open LQT patch sets (12), merged 8. JamesF has declared to be Product Manager for LQT, despite all signs on mediawiki.org being at "cancelled". He's declared this previously, without action. I think that's annoying, because I would expect action, not inertia. I'm planning on getting something out of him if he maintains that WMF finds itself responsible for maintenance of LQT, because I think that the Gerrit record shows, that it is in no way spending any time on LQT.
    • Tended to twn's Support page, and processed all I could.
    • Did L10n QA on recently added messages, reported some 15 new issues.
    • WMF's travel desk had forgotten to follow-up on my flight approvals in December. Luckily I found this out and was able to ask permission for a new flight.
  • Te doen:
    • Working for another client during the day.
    • Planning on doing code review this evening.
    • Give some thought to comms on plurals. Also want to get Niklas and Santhosh in the loop to ensure I communicate correct information to the translators. :). New wmf branch is made today, so we'll have 2 weeks to get this fixed.
    • Expense report prep for 2013-02 Pune trip.
  • Nodig:
    • More time!

Stand-up meeting 2013-02-20 (08:00 UTC)

[edit]

אמיר (Amir)

  • עשיתי:
    • entered this etherpad for the first time in a while welcome back!
    • 2438: committed, needs review and styling
    • 2431 - researched, see needs
    • 2341 - mostly done
  • אעשה:
    • walk around Pune
    • try to finish other cards
  • צריך:
    • review https://gerrit.wikimedia.org/r/#/c/49977/ (mostly Pau)
    • consulting about 2431, probably from Niklas. The reason for the bug is simple, but the solution may require a change in the database behavior that may break BC.

Pau

  • Fet:
    • Usability test
    • Adapt prototype to chinese
  • A fer:
    • Summarize testing results
    • Two usability tests
    • Update designs: optional message warning, proofreading voting
  • Necessitats:

রুণা (Runa)

  • সমাপ্ত কাজ:
    • Language Summit blog posted
    • Mediawiki page with the full report posted
  • চলমান কাজ:
    • Wikimania proposals
    • List of open tasks for next sprint
  • প্রয়োজন:

Stand-up meeting 2013-02-19 (08:00 UTC)

[edit]

Pau

  • Fet:
    • Wikimania proposals
    • Adapt prototype to French and Finnish
    • Updated ULS Extension to use SVG icons
  • A fer:
  • Necessitats:

Stand-up meeting 2013-01-18 (08:00 UTC)

[edit]

Pau

  • Fet:
    • UX testing
    • Scheduled tests for this week
  • A fer:
    • Wikimania proposals
    • UX tests
  • Necessitats:

സന്തോഷ് (Santhosh)

  • ചെയ്തു:
    • going through the email backlog, reading stuff
  • ചെയ്യും:
    • clear code review backlog(gerrit/github)
    • finish all tasks in sprint - 9 hours pending.
  • വേണം:

Stand-up meeting 2013-01-DD (08:00 UTC)

[edit]

Niklas

  • Tein:
    • Events
    • Wikimania proposals
  • Teen:
  • Tarvin:

Pau

  • Fet:
    • Initial design for saving at the search list
    • Reviewed Amir patchset, looked fine
  • A fer:
    • Start prototype for advanced editing features
    • Review current state for Tux
  • Necessitats:
    • See pictures of the caves trip

സന്തോഷ് (Santhosh)

  • ചെയ്തു:
    • [prep day]discussed with Aravinda about elaborate font documentation, items to be documented , went through the opentype spec
    • extracted ime list for language support matrix
    • (Ellora caves, Music festival)
  • ചെയ്യും:
    • more prep for the lang summit
  • വേണം:

Stand-up meeting 2013-02-08 (08:00 UTC)

[edit]

Niklas

  • Tein:
    • Blogging
    • Collection of tux fixes
  • Teen:
  • Tarvin:

Pau

  • Fet:
    • Meetings
  • A fer:
    • Design search list edting status feedack
    • Recruit more participants
    • Review Amir's patchset
  • Necessitats:

রুণা (Runa)

  • সমাপ্ত কাজ:
    • Mingle training with Siebrand
    • Meeting with Red Hat i18n team to prepare for the Language Summit
    • Communication walkthrough with Alolita, Amir, Siebrand
  • চলমান কাজ:
  • প্রয়োজন:

സന്തോഷ് (Santhosh)

  • ചെയ്തു:
    • Fuzzy fix for message collection API
    • misc minor fixes in tux
    • CR(gerrit and github)
    • Sprint meetings
  • ചെയ്യും:
    • work on rest of the cards and meeting with RH i18n team
  • വേണം:

Siebrand

Stand-up meeting 2013-02-06 (08:00 UTC)

[edit]

אמיר (Amir) (travelling)

Niklas (travelling)

Pau

  • Fet:
    • CSS styling for workflow state selector.
    • Contact test participants.
  • A fer:
    • Usability test
    • Summarize testing observations.
  • Necessitats:

রুণা (Runa)

  • সমাপ্ত কাজ:
    • Set up Mediawiki instance locally with extensions
    • All accounts set up
  • চলমান কাজ:
    • Set up Translate for the Mediawiki instance
    • Work on the Language Matrix
  • প্রয়োজন:

സന്തോഷ് (Santhosh) (travelling)

Siebrand (travelling)

Stand-up meeting 2013-02-04 (08:00 UTC)

[edit]

রুণা (Runa)

  • সমাপ্ত কাজ:
  • চলমান কাজ:
    • Set up Mediawiki instance locally for the gerrit workflow
  • প্রয়োজন:

സന്തോഷ് (Santhosh)

  • ചെയ്തു:
    • Change Ic0daa07b: WIP - Dynamic rendering and selection of workflow states
  • ചെയ്യും:
    • complete Ic0daa07b
  • വേണം:

Stand-up meeting 2013-02-01 (08:00 UTC)

[edit]

אמיר (Amir)

  • עשיתי:
    • MLEB release
    • code review
    • wikidata bug reporting
  • אעשה:
    • finishe TUX tasks
  • צריך:

Niklas

Pau

  • Fet:
    • Reviewed Search integration into message list
  • A fer:
    • Review workflow state
  • Necessitats:
    • Instructions for testing workflow state

സന്തോഷ് (Santhosh)

  • ചെയ്തു:
    • ajaxify message filters
    • addressing CRs
  • ചെയ്യും:
    • workflow states- make it dynamically rendered at client side using the recent api changes
  • വേണം:

Siebrand

  • Gedaan:
    • Made legal aware of the possible legal threat. They made an assessment. No action needed at the moment.
    • Code review (although not as much as I'd have liked)
  • Te doen:
    • Get haircut
    • Drive to Brussels
    • Enjoy team mates company and FOSDEM
  • Nodig:
    • My visa for India is still not in. I'll be calling the airline this afternoon to discuss alternative flight dates.


Stand-up meeting 2013-01-31 (08:00 UTC)

[edit]

אמיר (Amir)

  • עשיתי:
  • אעשה:
  • צריך:

Niklas

  • Tein:
  • Teen:
  • Tarvin:

Pau

  • Fet:
    • Visual spec
    • Usability testing
  • A fer:
    • Review for search and workflow integration
    • FOSDEM prep
  • Necessitats:

Runa

  • সমাপ্ত কাজ:
    • Lohit bug list
    • Gerrit set up - first round
    • Bugzilla default -cc on all components & whining set up
  • চলমান কাজ:
    • Gerrit set up
    • Various administrative setup - wikimedia page, blog etc
  • প্রয়োজন:

സന്തോഷ്

  • ചെയ്തു:
    • Worked on the message filter
    • made inline editor functional on search page
    • CR
    • API update to get workflow states
  • ചെയ്യും:
    • User workflow information from APIs for listing the state dropdown
    • CR
  • വേണം:
    • Pau's style review for search, workflow integration

Siebrand (not present)

Stand-up meeting 2013-01-30 (08:00 UTC)

[edit]

Amir

  • עשיתי:
    • code review
    • fix group description display after selecting a group
    • 2339 - Make Template:Identical work
    • 1:1
    • help Runa set up Gerrit
  • אעשה:
    • TUX tasks
    • in the morning - vaccination
    • in the evening - test Wikidata deployment in the Hebrew Wikipedia
  • צריך:

Niklas(not present)

Pau

  • Fet:
  • A fer:
    • Usability test planned
    • Brainstorming about "Suggestion for translation fragments specification"
    • CSS fixes for search integration.
  • Necessitats:

Runa

  • সমাপ্ত কাজ:
    • Weekly meeting & 1:1
    • Got default cc-ed on the bugzilla for most of the important extensions
    • Preliminary skeleton for language matrix and discussion with Alolita
    • Follow up on the email id
  • চলমান কাজ:
    • Gerrit - Self-learning and account set-up (as a follow up on the training from Amir)
    • Build the list of open bugs on wikimedia for Lohit
    • Complete the recommended list of default-cc components on bugzilla and set up whining
  • প্রয়োজন:

സന്തോഷ്

  • ചെയ്തു:
    • Working on search integration
    • CR
    • some minor tux fixes
    • meeting with Alolita
  • ചെയ്യും:
    • commit the search integration
    • CR
  • വേണം:
    • search integration require Pau's styling

Siebrand ( not present)

Weekly team meeting 2013-01-29 (22:00 PT)

[edit]

Sprint Update, Blockers

[edit]

Siebrand [5 mins]

Nuttin' special to report.

Welcome Runa!

[edit]

Alolita [5 mins]

Spring Language Summit schedule update

[edit]

Alolita - [5 mins]

  • Brief update on summit schedule so far
  • Participation
  • Prep work progress

GNUNIFY talks and tutorial

[edit]

Alolita + team discussion [5 mins]

  • Proposal submission
  • Hackathon request
  • Translation sprint request

FOSDEM to do list

[edit]

team discussion [5 mins]

  • Plans to attend dev rooms, talks - maximum coverage

Lightning talks -

https://fosdem.org/2013/schedule/ track/lightning_talks/

=== Any last minute issues before half the team travels Jan 31/Feb 1 [5 mins]

Team Discussion [5 mins]

  • Flights, visa, hotel in Brussels

Siebrand: My visa is not yet in, but expecting it on time.

Stand-up meeting 2013-01-29 (08:00 UTC)

[edit]

אמיר (Amir)

  • עשיתי:
    • code review
    • 2314 - Allow selection of Message documentation - started, found some weird stuff on the way, should talk to Santhosh about it.
  • אעשה:
    • TUX tasks
  • צריך:
    • A bit of pair-programming with Santhosh

Pau: Not present.

  • Fet:
    • Updated spec with search and homepage
    • Reviewed style for "paste source" patchset
  • Per fer:
    • Add interaction details to the spec

Runa

  • সমাপ্ত কাজ:
    • Accounts set up - gerrit, mingle, blog
    • Quick look through the Narayam and ULS bugs in various open states
  • চলমান কাজ:
    • Get permissions set up for the blog
    • Look through the open bugs for - Translate, Webfonts and all i18n bugs for Mediawiki core
    • Preliminary work for the Language Support Matrix
  • প্রয়োজন:

സന്തോഷ് (Santhosh)

  • ചെയ്തു:
    • workflow states to tux
    • CR
    • meeting
  • ചെയ്യും:
    • Workflow state(ajax)
    • finish other cards
  • വേണം:
    • Kaldari needs help

Siebrand

  • Gedaan:
    • MediaWiki L10n backporting MediaWiki core.
    • MediaWiki core magic words, namespace, special page L10n updates
    • Wrote https://translatewiki.net/wiki/Project:News/Newsletter_2013-01 and updated mailing list. Waiting for Niklas to review and approve text so I can send it out.
    • Code review
    • E-mail
    • Wikimedia HR office hours
    • Some maintenance on Babel, APC and Translate
  • Te doen:
    • Working for another client today. Yay for scripting installations of WoodWing Enterprise with a bunch of custom plugins!
    • Send out newsletter
    • Moar code review
  • Nodig:

Stand-up meeting 2013-01-28 (08:00 UTC)

[edit]

Amir

  • עשיתי:
    • task 2317: Allow inserting source text - committed basic functionality, no styling yet
    • task 2356: wrote abstracts for Gnunify talks
    • task 2357: release notes for MLEB
    • task 2352: code review
    • a few simple refactoring commits in Translate
    • bug https://bugzilla.wikimedia.org/show_bug.cgi?id=44381
  • אעשה:
    • TUX tasks.
  • צריך:

Niklas

  • Tein:
    • #2315 collapsing of same-text tm suggestions
    • #2320 /en for translatable pages
    • #2295 twn housekeeping: reduced new messages >500 to <200 and acted on few threads
    • Mingle updates
  • Teen:
    • #2308 send deployment email
    • Not really working this week except for deployment & review tasks
  • Tarvin:

Pau

  • Fet:
  • A fer:
    • Complete spec with some lacking parts (homepage, search)
    • Review CSS (paste original)
  • Necessitats:

Runa

  • সমাপ্ত কাজ:
    • First day!
  • চলমান কাজ:
  • প্রয়োজন:
    • Task list. Will create one with other team member's help.
    • GNUnify plan
    • Language Summit plan
    • @wikimedia.org account and other access (mingle for example)

സന്തോഷ്

Siebrand (possibly not in daily)

Stand-up meeting 2013-01-24 (08:00 UTC)

[edit]

Amir

  • עשיתי:
    • MLEB meeting with Niklas.
    • address the comments in some old commits
    • Video for the blog post.
    • code review
  • אעשה:
    • MLEB release notes
    • 2314 - Allow selection of Message documentation
    • 2317 - Allow inserting source text
  • צריך:

Niklas

  • Tein:
    • Weekly
  • Teen:
    • Moar coding
    • Moar review
    • ((( Cleaning )))
  • Tarvin:

Pau

സന്തോഷ്

  • ചെയ്തു:
    • weekly midnight meeting
    • Refactoring and cleanup on tux javascript, and on the way doing some of the cards
  • ചെയ്യും:
    • Rest of the cards, refactoring
    • CR
  • വേണം:
    • CR
    • need a working search server to configure :)

Siebrand

  • Gedaan:
    • Code review
    • Weekly team meeting
    • 1-on-1 w/ Alolita
  • Te doen:
  • Nodig:
    • Get those open patch sets merged, please!

Weekly team meeting 2013-01-24 (18:00 UTC)

[edit]

Sprint Update, Blockers

[edit]

Siebrand [5 mins]

We had some trouble getting a full program for this sprint. There are about 20 hours not planned. Niklas is mostly not available next week.

Main items of this sprint are:

  • Remove production (twn) blockers for the translation editor. Most will be removed, except for the proofread use case. That'll be the top priority during the sprint where the devs are together in Pune, India.
  • Cross integration of search in the TUX editor.
  • Pau is preparing and completing the visual and UX design for things we will be working on soon (full page proofreading, twn registration and twn front page).

Hiring update

[edit]

Alolita [5 mins]

Runa B will be joining the team next week. Santhosh will be Runa's mentor. Amir will be pulled in as needed.

Spring Language Summit pre-summit-prep tasks to accomplish

[edit]

Alolita, team discussion - [20 mins]

GNUNIFY talks and tutorial

[edit]

Alolita + team discussion [15 mins]

FOSDEM to do list

[edit]

team discussion [5 mins]

Sprint Demos

[edit]

discussion [5 mins]

=== Semi-annual feedback

Alolita [5 mins]

Stand-up meeting 2013-01-24 (08:00 UTC)

[edit]

Amir

  • עשיתי:
    • nothing much, offline most of the day
  • אעשה:

wikimedia.org/r/#/c/45069/ https://gerrit.wikimedia.org/r/#/c/45069/]

Niklas

  • Tein:
  • Teen:
    • Finish docs
    • MLEB 2013.01 if Amir has time
    • Coding tasks as time permits as well as code review
  • Tarvin:
    • Alolita asks to prepare, but I don't understand what concrete steps should be done
    • Can we have the important dates listed somewhere (fosdem, language summit, gnunify....) because I have no idea when the prep. deadline is and where I have time to do it
    • This pad feels sluggish, is it just me?
    • Can I commit to Sumana's proposal?

Pau

സന്തോഷ്

  • ചെയ്തു:
    • Message table - loads after page, group selection and language selection is ajaxified
    • Prevented multiple hits for recentgroups in messagegroup selector
    • Meeting about mid year checkin
    • Meeting about LS2
  • ചെയ്യും:
    • ( Do we have weekly team meeting ) ? attend : sleep;
      • looks so, given Alolita's email
    • more cards
  • വേണം:

Siebrand

Stand-up meeting 2013-01-23 (08:00 UTC)

[edit]

Amir

  • עשיתי:
    • blog post draft: http://etherpad.wikimedia.org/phZxEYi3YB
      • (my connection today can't handle Google docs)
    • sprint meetings
    • 1:1
    • voted, and managed not to go to sleep too late, despite the very interesting results.
  • אעשה:
    • mostly offline most of the day - have a meeting about a Wikimedia education project with speakers of the Circassian language - the first item in the jquery.ime menu. I'll demo it to them.
    • If I have time:

wikimedia.org/r/#/c/45069/ https://gerrit.wikimedia.org/r/#/c/45069/]

Niklas

  • Tein:
  • Teen:
  • Tarvin:

Pau

  • Fet:
  • A fer:
  • Necessitats:

സന്തോഷ്

  • ചെയ്തു:
    • meetings, meetings, meetings
    • #2346 Prepare the initial batch of messages on page load
  • ചെയ്യും:
    • #2346 Prepare the initial batch of messages on page load
  • വേണം:

Siebrand

  • Gedaan:
  • Te doen:
  • Nodig:

Stand-up meeting 2013-01-21 (08:00 UTC)

[edit]

Amir

Niklas

  • Tein:
    • Tried to get Solr on twn (fun stuff that turned unfun)
    • Unit test debugging (unfun stuff thay stayed unfun)
    • Reading Git book
  • Teen:
  • Tarvin:

Pau

  • Fet:
    • Two usability tests
  • A fer:
    • Two tests planned
    • Summarize findings for 2nd round of tests
  • Necessitats:

സന്തോഷ്

  • ചെയ്തു:
  • ചെയ്യും:
    • commafy support at js
    • and some CR, translate bug fixes
  • വേണം:

Siebrand

  • Gedaan:
    • Nothing much.
  • Te doen:
    • A lot, but no time.
    • Working for another client
  • Nodig:
    • Please have all code reviewed that is needed for this sprint.

Stand-up meeting 2013-01-DD (08:00 UTC)

[edit]

Amir

  • עשיתי:
  • אעשה:
  • צריך:

Niklas

  • Tein:
    • Meetings
  • Teen:
    • CR, bug fixes
  • Tarvin:

Pau

സന്തോഷ്

  • ചെയ്തു:
  • ചെയ്യും:
    • try commafy support in js
    • gnunify proposal
    • CR
  • വേണം:

Weekly team meeting 2013-01-17 (18:00 UTC)

[edit]

Sprint update, blockers

[edit]

Siebrand [5 mins]

Deployment issues and fixes on ULS done by Niklas

Echo-i18n

Translate UX testing update

[edit]

Pau [5 mins]

Hiring update

[edit]

Alolita [5 mins]

Work sprint in Pune

[edit]

(face-to-face) - Task planning - Feb 6-11, Feb 14, Feb 18 -Team discussion [5 minutes]

Spring Language Summit projects

[edit]

Team discussion - [10 mins]

list of tasks to accomplish

FOSDEM

[edit]

[5 minutes]

Interactions for Niklas, Siebrand, Pau, Alolita

  • Check beforehand who you want to talk with

GNUNIFY talks

[edit]

Alolita + team discussion [5 mins]

Time slots are 1 hour. We should propose 30 minute talks and share timeslots. 60 minute presentations are usually boring, because having 100% quality content for that time takes a huge amount of time and effort to prepare. 30 minute talks with adequate content is something most of our team members can fairly easily do.

Travel details

[edit]

Alolita [5 minutes]

Please add your travel itinerary to shared GDoc spreadsheet

SM: Which gdoc?

Caching and ULS

[edit]

Alolita [5 mins]

Update by Siebrand:

2013-01-10: Sent mail to preilly asking about status of Varnish for ULS.

2013-01-10: Asked Ori about the patch on IRC.

2013-01-10: Talked to Ori. Added Niklas as reviewer on https://gerrit.wikimedia.org/r/#/c/42362/ and asked him to do a sanity check on it per Ori's request.

2013-01-11: Niklas spoke to Ori on IRC. Their opinion: We need some extra code to add cache-disabling headers and someone to approve it (mark, asher, etc.). This is probably the best we can do without varnish

2013-01-11: preilly indicated he would start working on ULS and Varnish after the datacenter switch over. So before the end of the month.

2013-01-14: Asked Ori on IRC: I was wondering if there was any news from Tim... No reply.

==

Stand-up meeting 2013-01-17 (08:00 UTC)

Amir

  • עשיתי:
    • ULS IME fix
    • i18n bugs - read about language codes, started implementing
    • installed Solr for testing
    • helped Yuvi debug IME for the mobile Java version
  • אעשה:
    • Solr testing
    • i18n bugs
    • meeting Or and Tomer
    • Solr/search knowledge transfer? ;) - everyone does it :)
  • צריך:
    • patches in Gerrit

Niklas

Pau

സന്തോഷ്

Siebrand

  • Gedaan:
    • Wrote a reply to Quim that we want to participate in the volunteer engagement/QA events. I wrote that we want to commit to a 5 week cycle, committing ~110 hours in total. Will hopefully have a follow-up meeting with Quim on Friday, so we can start planning for next sprint.
    • Meeting with E2/Echo team on i18n for Echo.
    • Visa application India was found lacking info. Needs updating.
  • Te doen:
    • 5 meetings
      • Daily
      • Solr knowledge transfer
      • translatewiki app weekly meeting (not sure if I'm home on time)
      • 1-on-1 w/ Alolita
      • Weekly
    • Update visa letters
    • Get photo IDs taken
    • Drive to The Hague to bring my updated docs to CIBT
    • working for another client tomorrow.
  • Nodig:

Stand-up meeting 2013-01-16 (08:30 UTC) standup waits

[edit]

Amir

  • עשיתי:
  • אעשה:
    • more testing Translation search
    • i18n fixes
  • צריך:

Niklas

  • Tein:
    • Deployments mostly
  • Teen:
  • Tarvin:
    • Gnunify FAQ says talks are 60 minutes each, is that true? thats too long. *nod* Prepare for 30 minute sessions. We'll do two people per talk.
    • (why is it sometimes hard to get answers on the chat?)

Pau

  • Fet:
    • Propose changes based on 1st round of tests
    • Review inline editor
    • Review layout for infinite message loading
  • A fer:
    • Review additions to infinite message loading
    • Review workflows for homepage
  • Necessitats:

സന്തോഷ്

  • ചെയ്തു:
    • a qunit failure fix for core
    • support for mw.msg
    • assignment for interview
    • floating action bar in messagelist (with pau)
    • and deployment support with many patches
  • ചെയ്യും:
    • rest of the cards and meetings
    • CR
  • വേണം:

Siebrand

  • Gedaan:
    • Code review
    • Tested deployment stuff
    • twn support
  • Te doen:
    • Working for another client today
    • meeting with FR peeps on CN/Translate integration
    • bi-weekly meeting with Howie this evening
  • Nodig:
    • Please be on top of any reported issues on ULS deployments.

Stand-up meeting 2013-01-15 (08:00 UTC)

[edit]

Amir

Niklas

  • Tein:
    • Did I?
    • Prepared search/solr presentation
  • Teen:
    • Deployments
  • Tarvin:
    • Testers during deployment
    • I don't have any coding tasks left

Pau

  • Fet:
    • Two usability tests
    • Reviewed recordings
  • A fer:
    • Propose changes based on observations
    • Usability test
    • Review inline editor
    • Review layout for infinite message loading
  • Necessitats:

സന്തോഷ്

  • ചെയ്തു:
    • Update the statsbar when messages are translated
    • Do not show !!FUZZY!! from message translation in the editor
    • Move the message filters to overflow menu if screensize is small
    • CR/merges at github
  • ചെയ്യും:
    • rest of the cards
  • വേണം:

Siebrand

Stand-up meeting 2013-01-14 (08:00 UTC)

[edit]

Amir

Niklas

Pau

  • Fet:
    • Two usability testing sessions
  • A fer:
    • Process results
    • Two more tests planned
    • Review layout for infinite message loading
  • Necessitats:

സന്തോഷ്

  • ചെയ്തു:
    • stats bar refactoring
    • CR
    • Gurmukhi phonetic keyboard fix.
    • reading lot of emails
    • some reading on whether we can have a commafy support in formatnum. seems possible.
  • ചെയ്യും:
    • #2251 stats bar update
    • find a question for assignment for interview candidate
    • CR
  • വേണം:

Siebrand

  • Gedaan:
  • Te doen:
    • prepare presentation I'm giving at Sanoma Media Netherlands this afternoon
    • have India visa application picked up
    • grr. Bangalore and SF expense reports.
  • Nodig:

Weekly team meeting 2013-01-10 (10:30 UTC)

[edit]

Sprint update, blockers

[edit]

Siebrand [5 mins]

https://mingle.corp.wikimedia.org/projects/internationalization/cards/1954

  • No blockers.
  • ULS for logged in users to be deployed to all Wikimedia sites running Translate. Change to be made on Tuesday, together with an update of ULS and Translate extension. (hurrah!)
  • Sprint summary:
    • Exposure of new search schema with facets and the whole shebang.
    • Dynamic message list for TUX ("endless scrolling")
    • twn newsletter
    • Expansion of language code validation functions in MediaWiki language class
    • Roadmap review 6 of 12 months in (by Siebrand)
    • Echo developers have asked for a meeting on i18n in Echo. No specifics. Who wants to join, and what questions for agenda do we have? Est. time: 45 mins initially, probably followed by i18n review of the code, and then review of patch sets to fix.
      • Alolita wants to join; Santhosh.
      • Siebrand replied.

2013-2014 Language features and roadmap thinking

[edit]

Alolita + team discussion - [25 mins]

https://docs.google.com/a/wikimedia.org/spreadsheet/ccc?key=0Ar8ziwjAnNjWdGowU3pGNTNOQ3lyVHlISG5uMjlrMHc#gid=0 for roadmap work by Alolita on Wikimedia and Red Hat.

Interviews project, feedback

[edit]

[5 mins]

FOSDEM

[edit]

Alolita + team discussion [4 mins]

Language Summit at Red Hat

[edit]

Alolita + team discussion [4 mins]

GNUNIFY

[edit]

Alolita + team discussion [4 mins]

Presentation proposal! Register as speaker: http://www.gnunify.in/speaker/registration

We need to discuss who will register to talk on what subject(s). I'd like us to be specific and go deep, rather than shallow and wide.

Translation sprint is an option. Need to discuss details. We could also do a (low level, brief) workshop. Help in getting a "MediaWiki community" of the ground???

What kind of event GNUnify is? Open Source Technologies - audience is composed of developers and are students mostly. (gnunify.in)

Misc/Admin

[edit]
  • git-deploy: anyone to give support in European times (i18n deploy window?)
  • Niklas has requested days off before Feb
  • There might be a course on Apertium machine translation in March-April
    • Univ. Helsinki

Stand-up meeting 2013-01-11 (08:00 UTC)

[edit]

Amir

  • עשיתי:
    • ☃☃☃
    • 2240 - Don't display Add docs before docs are there - committed
    • TM suggestions display refactoring and sorting - merged (follow-up waiting for merge)
    • Fix styling of translated messages and behavior of "Hide translated" - merged
    • A little i18n fix for TimedMediaHandler - merged
    • meeting with Or and Tomer
      • finished: log in and can list messages and translations.
      • next tasks: "load more messages" button; add "accept" button.
    • Submitted blog post.
  • אעשה:
    • refactor getTranslationSuggestions()? yes, just do it.
    • 2212 - Broken display in recent tab
    • 2189 - Handle discouraged info in project selector
  • צריך:

Niklas

  • Tein:
    • Search (even more of it, Pau too) please review!
    • Key based offsets
    • Reviewing & tweaking tux
    • Chat with Ori about ULS caching (possible solution for enabling ULS for anon. without language detection)
  • Teen:
    • Language:isSupported...
  • Tarvin:

Pau

  • Fet:
    • Styling of long documentation messages on message editor
    • Styling of initial search view
    • Scheduled testing sessions with RedHat and more testers
    • Meeting with mobile twn app devs
  • A fer:
    • 3 usability tests planned
  • Necessitats:

സന്തോഷ്

  • ചെയ്തു:
    • small performance tweak on large message list
    • CR
    • working on support
  • ചെയ്യും:
    • working on , got it working, adding tests now
    • interview, meetings
  • വേണം:

Siebrand

    • 1-on-1 w/ Alolita
    • Moved sprint meetings from 5 Feb to 7 Feb (5 Feb people are travelling to India)
    • Chatted with Ori and preilly on ULS caching.
  • Te doen:
    • Weekly meeting
    • Interview with QA/outreach candidate
    • Communication about deployment of ULS for logged in users to sites with Translate on Tuesday.
    • twn support and exports over the weekend (FreeCol is moving to a new repo)
  • Nodig:

Stand-up meeting 2013-01-10 (08:00 UTC)

[edit]

Amir

  • עשיתי:
    • ULS bugs
    • qqq not appearing in ULS in TWN, although it works in my wiki. Strange, working on that.
    • Translated comments from Russian in Pau's TUX testing.
    • Snowman :)
  • אעשה:
    • qqq in ULS/TWN
  • צריך:

Niklas

  • Tein:
    • Search
  • Teen:
    • Started working on key-based offsets
    • Maybe 1:1
  • Tarvin:
    • When do you want have solr/search kt?
    • GNUnify - what kind of talks do they have?
    • TWN captcha not holding

Pau

  • Fet:
    • Usability test
    • Styling for
      • Permission request text
      • "More filters" sub-menu
    • Asked some TWN users to join the testing sessions
  • A fer:
    • Two usability tests planned
    • CSS review (long documentation messages, search)
  • Necessitats:

സന്തോഷ്

  • ചെയ്തു:
    • lazy loaded mesages
    • 1:1 with alolita
    • close the editor on last message
    • CR
  • ചെയ്യും:
    • correcting the counters, depends on API change for messagecollection offset
    • CR
  • വേണം:

Siebrand

  • Gedaan:
  • Te doen:
  • Nodig:

Stand-up meeting 2013-01-09 (08:00 UTC)

[edit]

Amir

  • עשיתי:
    • started the blogpost, going to make a nice screencast
    • fixing some mw.uls issues, that appeared after recent jquery.uls changes
  • אעשה:
    • publish blog post
    • 2236 - qqq selectable in TUX ULS
  • צריך:
    • review of ULS commits in GitHub - not immediately, later.

Niklas

  • Tein:
  • Teen:
    • Search
  • Tarvin:

Pau

  • A fer:
    • Two usability tests planned
    • CSS review
  • Necessitats:

സന്തോഷ്

  • ചെയ്തു:
    • meetings
    • Started on message list scroll
  • ചെയ്യും:
    • message list scroll
  • വേണം:

Siebrand (probably not in daily)

  • Gedaan:
    • Sprint 33 started!
  • Te doen:
    • Working for another client during the day.
  • Nodig:

Stand-up meeting 2013-01-07 (08:00 UTC)

[edit]

Amir

Niklas

Pau

  • Fet:
  • A fer:
    • Review latest developments and suggested patchsets
    • Usability testing sessions
    • Meeting with Siebrand about cross-language translation (14.00?)
  • Necessitats:

സന്തോഷ്

  • ചെയ്തു:
    • #2194, #2188
    • CR
    • Addressing CR comments
  • ചെയ്യും:
    • CR, address CR comments
  • വേണം:

Siebrand

  • Gedaan:
    • code review
    • twn support
  • Te doen:
    • Design meeting with Pau
    • Start new India visa application
    • twn support and stuffs
    • Dogfood TUX
  • Nodig:

Stand-up meeting 2013-01-04 (08:00 UTC)

[edit]

Amir

Niklas

  • Tein:
  • Teen:
    • Install Skype (on the laptop)
    • Search
    • will work a bit on the weekend to catch up for yesterday(me too)
  • Tarvin:

Pau: Holiday

സന്തോഷ്

  • ചെയ്തു:
    • interview with candidate
    • catching up mails
  • ചെയ്യും:
    • pending CRs
    • pending tasks
  • വേണം:

Siebrand

  • Gedaan:
    • Code review
    • Some pre-processing for translation rally payments
  • Te doen:
    • Getting cards done.
  • Nodig:

Stand-up meeting 2013-01-03 (08:00 UTC)

[edit]

Amir

Niklas (not attending)

Pau: Holiday

സന്തോഷ്: Day off

Siebrand

  • Gedaan:
    • Code review.
  • Te doen:
    • Removing L10n support in twn for SemanticResultFormats. Main developer shows active disdain for i18n related issues. I refuse to be spit on and have our translators work on that extension anymore. https://gerrit.wikimedia.org/r/#/c/41939/
  • Nodig:

Stand-up meeting 2013-01-02 (08:00 UTC)

[edit]

Amir

  • עשיתי:
  • אעשה:
    • finish 2195 - Fix ugly wrapping of language selection
    • other TUX tasks
  • צריך:
    • decide how to override the langdb in a robust way (discussed in Skype)
    • clarification how to reproduce [https://bugzilla.

wikimedia.org/show_bug.cgi?id=42375 https://bugzilla.wikimedia.org/show_bug.cgi?id=42375]

Niklas

  • Tein:
    • Translation helpers api
  • Teen:
    • Search story
    • Small tux cards
  • Tarvin:

Pau

  • Fet:
  • A fer:
  • Necessitats:

സന്തോഷ്

  • ചെയ്തു:
    • Sprint cards - message filter in menu
    • help link for non-logged in users
    • "All" appearing everywhere
    • CR
  • ചെയ്യും:
    • sprint tasks
  • വേണം:
    • Translation Helper API ready?

Siebrand

  • Gedaan:
    • mostly twn support and code review. Happy about ReviewerBot adding me as reviewer to patch sets with L10n changes.
  • Te doen:
  • Nodig:

Stand-up meeting 2012-12-19 (07:00 UTC)

[edit]

Amir

Niklas

  • Tein:
    • Extension bundle creator
    • FYI: kde had to disable tm because too slow
    • Etherpad-lite wants to use translatewiki.net (yay)
    • translatewiki.net https improved
    • Translate extension change notes updated, waiting for submit
  • Teen:
    • extension bundler stuff
    • maybe shorten twn backlog
  • Tarvin:

Pau

സന്തോഷ്

  • ചെയ്തു:
  • ചെയ്യും:
    • Merge pending pull requests at github and CRs in gerrit
    • continue fixes
  • വേണം:

Siebrand

  • Gedaan:
    • Didn't do too much. A tiny little number of twn support issues.
  • Te doen:
    • twn support and exports.
    • Milkshake triage w/ Amir and Santhosh.
    • Chasing of communications dept. of the i18n team.
  • Nodig:

Srikanth( not present )

  • செய்தவை:
  • செய்யப்போவது:
  • தேவை:

Stand-up meeting 2012-11-16 (07:00 UTC)

[edit]

Amir

  • עשיתי:
    • submitted Lakshmi's blog post
    • technical cleanups for Urdu Wikipedia - mobile language support, fix namespace translation and asked about https://bugzilla.wikimedia.org/show_bug.cgi?id=32515
    • committed some existing pull requests in IME, cleaned up some existing code and tests, added a few new tests
    • publicized jquery.i18n and ULS a bit on StackOverflow
  • אעשה:
    • ULS bugs
    • dosa
  • צריך:

Arun

  • Did:
  • Will do:
  • Need:

Niklas

  • Tein:
    • Grumble
  • Teen:
    • Grumble
    • Start MediaWiki language extension bundle (melange?<-name?<-just an idea<-name already used by Google for their project<-not a public name)
    • Scan and submit BLR ER
    • Grumble some more - technology sucks
    • Bake something
  • Tarvin:

Pau

സന്തോഷ്

  • ചെയ്തു:
    • multiple bug fixes and pull request merges in jquery.*(see commit notifications)
    • Review, fix of old Narayam patches
    • Added Javanese to Narayam and jquery.ime
    • meetings
  • ചെയ്യും:
    • more bug fixes as planned
  • വേണം:
    • Urgent: blog posts

Siebrand

  • Gedaan:
  • Te doen:
  • Nodig:

Srikanth

  • செய்தவை:
  • செய்யப்போவது:
    • Test document for ULS - IME test hour.
    • DevCamp blogpost.
  • தேவை:

Alolita

  • Did - Sprint Planning meetings; Started working on Language Summit Retrospective; Catchup / Responding on Email; Followed up with HR
  • Will do - Work with RHT next week on tasks
  • Need - N/A

Stand-up meeting 2012-11-02 (07:00 UTC)

[edit]

Amir

  • עשיתי:
  • אעשה:
  • צריך:

Arun

  • Did:
    • Status check on Tshirts. Delivery expected tomorrow
    • Review Pau's suggestions fo devcamp design track, looks good
    • Confirmation for Amir's reservation in Mumbai
  • Will do:
    • Phone coordination for tshirt delivery
  • Need:

Niklas

  • Tein:
    • 2 blog post drafts
    • Some work on bugzilla to on ULS bugs
  • Teen:
    • Fix the commit Siebrand mentioned yesterday
    • Give +1/-1 to solr related commits
    • Watch metrics/techchat from youtube maybe
  • Tarvin:

Pau

  • Fet:
  • A fer:
  • Necessitats:

സന്തോഷ്

  • ചെയ്തു:
    • ULS, IME bug fixes
    • y'day reviewed blog post, comments not addressed so far
  • ചെയ്യും:
    • ULS, IME bug fixes ( looking into Bug 41625 now)
  • വേണം:

Siebrand

  • Gedaan:
    • Watched the monthly metrics.
    • Did some other stuff I forgot about
  • Te doen:
    • Check in for flights
    • Review blog post
    • Send mailing to DevCamp participants
    • Write twn newsletter
    • Pack
    • Go to bed on time
  • Nodig:

Srikanth

  • செய்தவை:
  • செய்யப்போவது:
  • தேவை:

Stand-up meeting 2012-11-01 (07:00 UTC)

[edit]

Amir

  • עשיתי:
    • Fix bug 28525 - MediaWiki:mwe-upwiz-source-ownwork-assert-any-license needs working GENDER suport - committed
    • Slides about testing - sent to the team, need review and fact-checking
  • אעשה:
    • possibly won't attend the daily meeting
    • various preparations for travel
    • browser i18n support slides for the Language summit (request form Alolita)
  • צריך:

Arun[not attending]

  • Did:
  • Will do:
    • Review design track plan
    • Check up on Pune tshirt delivery status
  • Need:

Niklas

  • Tarvin:

Pau

സന്തോഷ്

  • ചെയ്തു:
    • IME UX - css fixes
    • Fixing the preference for IME
    • working on i18n bug
  • ചെയ്യും:
    • working on i18n bug
  • വേണം:

Siebrand

  • Gedaan:
    • Observed that Wikimedia deployers were making change sets outside of Gerrit to operations/mediawiki-config repo. Sent a mail to Robla, Sam (offender) and Chad (Gerrit admin) about this. Chad quickly closed outside of Gerrit pushing to the repo; problem solved.
    • Exported namespace, magic words, special page aliases for MediaWiki core from twn. Ran into issues with Jenkins not performing well; had to merge patch sets without waiting for Jenkins approval after 30 minutes, because I needed updates files for exporting the next magic type. Also did some cleanup in MessagesXx.php files (ordering, superfluous whitespace above the messages array).
    • Found out that Wikia had migrated to GitHub over a week ago; they'd forgotten to tell their localisation platform. Updated translatewiki.net scripts, but waiting for commit access.
    • Timo told me that Toolserver i18n was moved to GitHub. Still todo. Only needs script updates, new checkouts and processing hopefully.
  • Te doen:
    • Will send prep lists to DevCamp invitees.
    • Working for another.
  • Nodig:

Srikanth

  • செய்தவை:
    • Cyclone, power/internet problems
  • செய்யப்போவது:
    • Catchup on emails, bugs
    • Blogpost
  • தேவை:
    • Blogpost Review.

Stand-up meeting 2012-11-30 (08:00 UTC)

[edit]

Amir

  • עשיתי:
    • a little code cleanup in GitHub
    • code review for group selector
    • code review for community Narayam/IME commits
    • meeting with Or and Tomer about TWN mobile app - I suggested them to write a draft program with milestones to discuss next week with Siebrand and Pau
  • אעשה:
    • Friday-Saturday - WM-IL meeting (I mentioned it to Siebrand in SF). I'll try to attend the testing meeting on Friday.
    • code review for group selector
    • uls tests
  • צריך:

Arun

Niklas

  • Tein:
    • Work on API modules and message list
  • Teen:
    • Test meeting?
    • Group selector recent-related stuff
  • Tarvin:
    • Symbols for message statuses
    • Grid system in Translate before I push anything to Gerrit for review
    • Language Bundle story ready for review
    • I'm unable to get truncation to work on message listing... ideas welcome
    • How to technically implement progress bar? with one image, many images, or divs with background color or something else?

Pau

സന്തോഷ്

  • ചെയ്തു:
    • working on msggroup selector
  • ചെയ്യും:
    • msggroup selector ux+workflow
  • വേണം:

Siebrand (ho ho ho)

  • Gedaan:
  • Te doen:
  • Nodig:

Srikanth

  • செய்தவை:
  • செய்யப்போவது:
  • தேவை:

Stand-up meeting 2012-11-29 (08:00 UTC)

[edit]

Amir

Arun

Niklas

  • Tein:
    • Released MLEB - 0 downloads
  • Teen:
    • Things I planned to do yesterday - blockers first
    • Update mingle
  • Tarvin:

Pau

സന്തോഷ്

  • ചെയ്തു:
  • ചെയ്യും:
    • work on message group selector
  • വേണം:
    • apis

Siebrand (attending from road)

  • Gedaan:
    • Further structured twn configuration with an updated patch
    • Did backports for MediaWiki core L10n to 1.20, 1.19 and 1.18. Dropped support for 1.18 right after on twn, as 1.18 is end of life.
    • Some twn support
  • Te doen:
    • Gather some icons and update config files
  • Nodig:

Srikanth: AWOL

Stand-up meeting 2012-11-28 (08:00 UTC)

[edit]

Amir

  • עשיתי:
    • blog post
    • uls bugs
  • אעשה:
    • uls tests
  • צריך:
    • questions for Santhosh

Arun

  • Did:
    • Polishing up the mobile uls design
  • Will do:
    • Discuss twn homepage changes and use cases with Pau
    • Start work on header and login design for twn homepage
    • Upload the mobile uls screens
  • Need:

Niklas

  • Tein:
    • Had a meeting with Santhosh to come up with a plan to conquer the world
    • Prepared new MLEB
      • TODO: push tags
      • TODO: send announcements to wikitech-l, mediawiki-i18n, my blog
  • Teen:
    • Proceed according to the plan, starting with backend stuff for message list and API enhancements
    • ((( Chapter general assembly )))
  • Tarvin:
    • Santhosh: While helping wizardist to make this patch, we noticed that there are plural tests for bh, but bh is a language family. Would the correct thing be to move plural tests to bho and copy bh cldr plural rule to mediawiki overrides?

Pau

  • Fet:
    • Sprint planning and EE projects
  • A fer:
    • Pending ULS fixes in GitHub
    • Review TWN Home design
  • Necessitats:

സന്തോഷ്

Siebrand (probably not in meeting, or from the car)

  • Gedaan:
    • Sprint end/start
    • Started some tasks (twn support, gathering icons for projects)
    • Change twn config. Patch in gerrit.
    • Planned a meeting with QA people. Please join if you're able to and got an invitation.
  • Te doen:
    • Working for another client today and tomorrow.
    • Will probably do stuff with icons this evening.
  • Nodig:

Stand-up meeting 2012-11-26 (08:00 UTC)

[edit]

Amir

  • עשיתי:
    • IPA keyboard
    • code review
  • אעשה:
  • צריך:

Arun

  • Did:
    • Exploring nearby villages and connecting with locals
    • Reading up on WMF emails
  • Will do:
    • Expense reports
    • Publish Mobile ULS screens from DevCamp
  • Need:

Niklas

  • Tein:
    • Some code review
  • Teen:
    • Write/review newsletter
    • Prepare some announcement for mleb
  • Tarvin:
    • Mleb status? Make release today or later?
    • Anything to deploy? The arabic fonts? (yes, merged)
    • IPv6 for translatewiki.net not working
    • 160(!) open hours in Mingle

Pau

സന്തോഷ്

  • ചെയ്തു:
    • bug fixes, reviews, merges
    • some fixes on chrome extension
    • [lot of reading, writing, chatting, movies, songs]
  • ചെയ്യും:
    • bug fixes, reviews, merges
  • വേണം:

Siebrand

  • Gedaan:
    • Not much work over the weekend
    • Went to a Skunk Anansie concert yesterday. Ears are still beeping. Concert was awesome!
  • Te doen:
    • going to move tomorrow's appointments (start one hour later, finish a few hours earlier) DONE
    • twn support DONE
    • twn imports/exports DONE
    • twn newsletter DONE
    • language bundle test so Niklas can release DONE
    • appointment with my accountant on 2011 books DONE
  • Nodig:

Srikanth: Not available

Stand-up meeting 2012-11-23 (08:00 UTC)

[edit]

Amir

Arun[not attending]

  • Did:
    • End of travelling, shifted to Dharamshala, at the Himalayan foothills
    • Internet setup, accomodation stuff
  • Will do:
    • Catchup on emails and team progress
  • Need:

Niklas

  • Tein:
    • Meeting with Alolita
  • Teen:
    • Photo coming
    • Some code review, depends on blockers
    • Travel
  • Tarvin:
    • Feeback on mleb

Pau

  • Fet:
    • 2 usability tests
    • Registered and reported usability test problems
  • A fer:
    • Create bugzilla bugs
    • Alternative positionings for IME menu
  • Necessitats:

Stand-up meeting 2012-11-22 (08:00 UTC)

[edit]

Amir

Arun: Unavailable.

Niklas

Pau

സന്തോഷ്

  • ചെയ്തു:
    • bugs
    • office hour
  • ചെയ്യും:
    • bugs
  • വേണം:

Siebrand (not attending daily)

  • Gedaan:
    • Code review
    • DIDN'T test langauge bundle
  • Te doen:
    • Working for another client all day.
  • Nodig:

Srikanth: AWOL

Alolita:

  • Did:
   * Met with Red Hat team twice for Language Summit retrospective. 
   * Met with language community members for Marathi, HIndi for tools usage feedback
   * Happy to get jquery.ime back (yay Pau!)
   * Office Hours participation
   * Reviewed Annual Report i18n section

* 1:1 with Santhosh on Tuesday ( not for today , it was y'day:)

  • To do:
   * Complete retrospective writeups
   * Meet with Red Hat i18n testing team
   * Meeting in Delhi and Kolkata with language community members next week
   * Contact Denny
   * Ping Google again for Translate API
   * 1:1 w Amir, Niklas
  • Blockers
   * None
   * Alolita on vacation/travel for next week but will be on email and will join into standups as available 

Stand-up meeting 2012-11-21 (07:00 UTC)

[edit]

Amir

Arun

Niklas

Pau

  • Fet:
    • CSS adjustments:
    • Usability test
      • Summary: able to change and set-up language, problems figuring out the mappings for input methods
    • Github followup
  • A fer:
    • More CSS fixes
    • More usability testing
      • Process results (+ share with Wikidata team)
  • Necessitats:
    • Santhosh to take the draft commit on gerrit

സന്തോഷ്

  • ചെയ്തു:
    • more tests and fixes to jquery.i18n
    • bug fixes
    • 1:1
  • ചെയ്യും:
    • bug fixes
    • merge Pau's css adjustments
  • വേണം:

Siebrand

  • Gedaan:
    • twn support and exports
    • updated twn to master
    • tested language bundle installation (using vagrant/virtual box)
    • Some code review
    • Etherpad-lite translated
  • Te doen:
    • test language bundle installation (using vagrant/virtual box)
    • need to reboot OSX
  • Nodig:

Srikanth: AWOL.

Stand-up meeting 2012-11-20 (07:00 UTC)

[edit]

Amir

Niklas

Pau

  • Fet:
  • A fer:
    • CSS adjustments
    • Usability testing: adapt prototypes and perform tests
  • Necessitats:
    • Decide what to do with Foundation grid not passing CSSLint: ignore or adapt?- ignore It complains about borderbox, our build does not mandate csslint pass. So no issue

സന്തോഷ്

  • ചെയ്തു:
    • bug fixes
    • working on #1503 more qunit tests for jquery.i18n
  • ചെയ്യും:
    • #1503
  • വേണം:

Siebrand

  • Gedaan:
    • ULS modules triage with Amir and Santhosh
    • twn support
    • code review and merging
  • Te doen:
    • twn support and exports
    • update twn to master
    • test language bundle installation (using vagrant/virtual box)
  • Nodig:

Srikanth( not present )

Stand-up meeting 2012-10-31 (07:00 UTC)

[edit]

Amir

Arun

  • Did:
    • Made reservations for Amir in Mumbai
  • Will do:
    • Chalk up details of DevCamp design track with Pau
  • Need:
    • Details of DevCamp attendees who only signed up for design

Niklas

  • Tein:
    • Not
    • Deployments
    • Blogged on Monday
  • Teen:
    • Not today
  • Tarvin:

Pau

  • Fet:
    • EE and Design team work and meetings
  • A fer:
    • Fix style problems for ULS+IME
    • Visual spec for project list and navigation
  • Necessitats:

സന്തോഷ്

  • ചെയ്തു:
    • 1:1
    • disable IME feature
  • ചെയ്യും:
    • more bug fixes on ULS, IME
  • വേണം:
    • Pau's help in addressing UI complaints about IME in wikidata

Siebrand

  • Gedaan:
    • Ended sprint. No planning for new sprint, as the India event is eating up all of our time.
  • Te doen:
  • Nodig:

Srikanth(Not present)

  • செய்தவை:
  • செய்யப்போவது:
  • தேவை:

Stand-up meeting 2012-10-29 (07:00 UTC)

[edit]

Amir

  • עשיתי:
    • ULS code review.
    • Fix bug 31565 - Allow list of group member names for userrights-groupsmember and userrights-groupsmember-auto - submitted, needs review
    • Fix bug 39559 - Mediawiki:Mwe-upwiz-deeds-macro-prompt needs Template:GENDER - submitted, merged
    • Fix bug 32237 - MediaWiki:Emailuser needs GENDER - submitted, needs review, but there's still the sidebar issue
  • אעשה:
    • Fix bug 40874 - Load font of language displayed in recent languages - need help from Santhosh - but probably it's impossible
    • remaining GENDER bugs
  • צריך:

Arun[Not attending]

  • Did:
    • Checked status of Tshirts, on schedule and ready for dispatch to Pune tomorrow.
    • Family stuff, wedding.
  • Will do:
    • Travel to Thiruvananthapuram to see my grandmom
  • Need:

Niklas

projects/internationalization/cards/789 https://mingle.corp.wikimedia.org/projects/internationalization/cards/789]

    • TWN newsletter

Pau

സന്തോഷ്

  • ചെയ്തു:
    • Completed Srikanths qunit tests for ime selector https://github.com/wikimedia/jquery.ime/commit/8c824ba36b3da1d283fb2ab13ce29302f2772f4a
    • Multiple commits/fixes/improvements/review/merge on ULS+IME integration(and corresponding changes in github)
    • Prepared a detailed how-to for a Bengali keymap( Nasir khan asked this). Can be used for Tamil Bamini, Wijesekhara etc
    • Expense report for last 3 months
    • TWN translation rally payments done
    • (Some pet project stuff)
    • Fixed Bug 41454 Avoid 404s in non-localized locales ( And updated jquery.i18n for this) - Review pending
    • Travel arrangements for Mumbai-Pune travel
  • ചെയ്യും:
    • ULS+IME fixes as per review
    • Leaving bug fixing on gender and analytics task low priority and taking ULS bug fixes on high priority(Siebrand to correct if wrong)
  • വേണം:
    • ULS, IME IE(8.9,10) testing
    • CR

Siebrand

  • Gedaan:
    • Respond to DevCamp inquiries
    • Some coding, see Gerrit.
    • Revived discussions about removing preferences clutter on 6-7 patches in Gerrit
    • twn exports
    • reenabled iHRIS on twn, other various twn support
    • Did some translations and QA on L10n on twn. Found issue with unwanted enabling of jquery.ime. Was resolved by Santhosh this morning.
  • Te doen:
    • twn newsletter
    • complete reviewing Translate UX development plan
    • Plan meetings until end of year
  • Nodig:
    • 120 hours open in sprint. Srikanth (29), Pau (29), Santhosh (20 - known), Alolita (12), Siebrand (11 - known)

Srikanth

  • செய்தவை:
    • jquery.ime testing, unit test
    • ULS + jquery.ime testing
    • Mails for Language Summit, Meetups
    • Fixed Javanese Narayam map.
    • 1:1
  • செய்யப்போவது:
    • ULS+jquery.ime unit tests
    • IE Testing.
  • தேவை:

Stand-up meeting 2012-10-26 (07:00 UTC)

[edit]

Amir

  • עשיתי:
    • Visa
    • IME review
    • very last tweaks to the bug list and the presentation
  • אעשה:
    • gender bugs
    • one uls webfonts bug, for which I'll need help
  • צריך:

Arun

  • Did:
  • Will do:
  • Need:

Niklas

  • Tein:
    • Weekly
    • Tracking extension eval
  • Teen:
    • Unavailable in the afternoon
    • FlaggedRevs gender bug
  • Tarvin:

Pau (Not attending)

സന്തോഷ്

  • ചെയ്തു:
  • ചെയ്യും:
    • More UX fixed for ULS
  • വേണം:

Siebrand

  • Gedaan:
    • I forgot.
  • Te doen:
    • Get all my cards done.
  • Nodig:
    • Europe going on winter time this weekend. For India, meetings are going to be one hour earlier (I think).

Srikanth

Weekly meeting 2012-10-25 (17:00 UTC)

[edit]

Sprint Update, Blockers [5 min]

[edit]
  • Twn newsletter
  • Stories close to completion: TUX development plan and tracking/logging evaluation
  • ULS ime integration crash-landing
  • Mingle says 200h open
  • Amir and Srikanth are committed to finishing their current sprint tasks on time
  • Niklas, Siebrand are ok
  • Pau and Santhosh will have some tasks spill over into the next sprint

India engineering events update

[edit]

DevCamp, Bangalore [3 min]

[edit]

Topics: We need to add more to the list of tasks - bug lists,

related links (github repos etc.). Update from Srikanth

  • Amir to polish bug list and spread it soon

Registration update [2 min]

[edit]
  • Siebrand: (total numbers, 135 invitations sent)

Language Summit Sessions [5-20 min]

[edit]

Topics for tutorials, invitations, followup with Red Hat

Pune_LanguageSummit_November_2012

  • Flesh out i18n future with Mobile and VE in Pune
  • To be or BiDi (Amir and Alolita to figure out talk content)

From Unicode conf:

  • We have possibility work with Behdad - indic fonts rendering
  • Praveen from Redhat - tutorial of FontForge - we will get it too

Editors w Language team meetup in Bangalore and Pune [5 min]

[edit]

Srikanth will be organizing these meetups reaching out to editors and admins who give us active feedback and test our tools. Scheduled for Pune on Nov 4 Sunday (2012-11-04) at 1700 and for Bangalore on Nov 11 Sunday (2012-11-11) at 1400.

Admin: Travel, Visas, Expense Reports [5 mins]

[edit]
  • Niklas' LUX ER processed

TUX Development plan

[edit]
  • Moved to wiki and updated as promised
  • Siebrand is redacting

ClickTracking/EventLogging evaluation

[edit]
  • Shared with Diederik
  • ClickTracking is basically dead
  • Need the API for the analytics end point

Stand-up meeting 2012-10-25 (07:00 UTC)

[edit]

Amir

  • עשיתי:
    • listing design bugs.
    • code committed for gender bugs:
      • 18277 - Message Abusefilter-diff-version needs date/time separated, and GENDER support - merged
      • 31986 - Fix gender in user namespaces for Portuguese wikis - trivial, but needs community input
    • jquery.ime refactoring
    • task 1768: Prepare tutorial "How to i18n your code".
      • Used the presentation from the SF Tech days. Tried to adapt it for people who are less familiar with i18n and MediaWiki.
    • Fixed PostEdit for RTL.
  • אעשה:
    • Fetch the visa.
    • IME review.
    • Gender bugs.
  • צריך:

Arun

  • Did:
  • Will do:
  • Need:

Niklas

Pau

സന്തോഷ്

  • ചെയ്തു:
    • #1828 ULS bug on jumping regions
    • #1803 Gender bug in Moodbar
    • Review of pending pull requests in github for multiple projects
    • Fixed Altgr not working - jquery.ime
    • Fixed jumping to WW on scrollup - jquery.uls
    • More logistics mails about lang summit
    • ( took a few hours off , reading, family )
  • ചെയ്യും:
    • QA and bug, UI fixes for ULS+IME(planned for y'day)
    • CR/test/merge of any pull requests
    • Not attending weekly meeting
  • വേണം:
    • Review and test of IME+ULS integration code
    • Pau's help in tuning UX of IME integration(CSS and images mainly)

Siebrand

  • Gedaan:
    • 1854: Sent DevCamp e-mails (invitations and rejections).
    • 1850: Partial review Translate UI/UX development plan. It's a lot of work if the goals is to fully agree with the contents after redacting.
    • Code review
  • Te doen:
    • 1836: Write ULS deployment plan; have to send it before the team meeting.
    • Weekly meeting
    • OTRS follow-ups to rejections and invitations.
  • Nodig:

Srikanth

Stand-up meeting 2012-10-24 (07:00 UTC)

[edit]

Amir

  • עשיתי:
    • Gender bugs
    • Headache.
  • אעשה:
    • listing design bugs
  • צריך:

Arun[Might attend if i'm back home from shopping]

  • Did:
    • Mostly out of home visiting relatives
    • Was a judge for WLM India, rated 250 shortlisted images in around 2 hours, some highlights on https://twitter.com/planemad
    • Fixed a reciepent for my old laptop. Its going to an NGO which plans to use it for educating girl children in rural Madhya Pradesh. Did a clean install of ubuntu on it.
  • Will do:
    • Secret stuff
  • Need:
    • A way to sleep while mosquitoes perform Symphony No 9 by your ears

Niklas

Pau

  • Fet:
    • Updated prototype for testing (support for translations and typos included)
    • Contacted participants for testing
  • A fer:
    • Usability test
    • Visual spec
  • Necessitats:

സന്തോഷ്

Siebrand

  • Gedaan:
    • Completed: 1852: Complete review of registrations for DevCamp
    • Almost complete: 1854: Made concepts of invitation e-mail and rejection e-mail for DevCamp, made mailing lists, configured mail server, OTRS queue updated. Sent mail to Alolita and Tomasz for review.
    • Helped in fixing fatal error with TIFF files in Wikimedia deployment https://bugzilla.wikimedia.org/41305 w/ Sam Reed and Niklas.
    • E-mailed James Forrester and Trevor about Visual Editor documentation from previous sprint. Everything e-mailed is on mediawiki.org and bugzilla. Per our meeting in September, the LangEng team's goal was to create documentation for the Visual Editor team in such a way that LangEng expertise is only needed to create those docs, and that tests can then be executed by anyone (VE developer, QA resource or volunteer tester). In our opinion we have now provided all information and requirements that would allow the team to assess (in)correct behaviour in RTL and Indic scripts in VE, so that you can start making process in its proper support, or report issues with upstream vendors.
    • Reviewed business card designs.
  • Te doen:
    • Working for another client all day.
    • 1854: Will probably send DevCamp e-mails in the evening.
    • 1836: Start ULS deployment plan. Must do this today, otherwise we cannot discuss it in Thurday's weekly.
    • 1850: Review Translate UI/UX development plan. Niklas is done with the update.
  • Nodig:

Srikanth

  • செய்தவை:
  • செய்யப்போவது:
    • jquery.ime fixes to qunit errors on rules
    • Patch for autonyms. I shall submit without autonyms where not possible.
    • jquery.ime test plan
  • தேவை:

Stand-up meeting 2012-10-23 (07:00 UTC)

[edit]

Amir

  • עשיתי:
    • Gender bugs - somewhat more complicated than I though.
    • added a few more potential bugs to the devcamp bug list.
  • אעשה:
    • Gender bugs.
  • צריך:
    • help picking easy design bugs for the devcamp.

Arun

  • Did:
    • Festival stuff
    • Sync with tshirt vendor. Everything on schedule
  • Will do:
    • More festival stuff, getting blessings from an elephant this afternoon.
    • Put more details into plan for design activities at devcamp, lot of my friends are interested but i'm not sure how useful it is to have a big bunch of designers there. Initial for remote participation: Bangalore_DevCamp_November_2012/Topics/Design
  • Need:

Niklas

  • Tein:
    • Fixing bugs in Translate, related or unrelated to the mwextffs story
  • Teen:
    • hopefully other sprint tasks
  • Tarvin:

Pau

സന്തോഷ്

  • ചെയ്തു:
    • contacted TWN translation rally winners from India for bank details for money transfer(1/4 payment done)
    • langsummit - sent some invites
    • IME+ULS
  • ചെയ്യും:
    • IME+ULS
    • more lang summit invitations
  • വേണം:

Siebrand

  • Gedaan:
    • 1796: Lots of twn work related to Niklas' development. Now pretty stable and a bit quicker in certain areas.
  • Te doen:
    • 1852: Complete review of registrations for DevCamp
    • 1854: Make concepts of invitation e-mail and rejection e-mail for DevCamp
    • 1836: Start ULS deployment plan
  • Nodig:

Srikanth

  • செய்தவை:
    • Started jQuery.ime testing
    • Outreach for DevCamp
    • Bug list for DevCamp
  • செய்யப்போவது:
    • Complete Bug list for DevCamp
    • jQuery.ime Test document
  • தேவை:

Stand-up meeting 2012-10-22 (07:00 UTC)

[edit]

Amir

  • עשיתי:
    • Reviewing and refactoring ULS/IME integration.
      • Done what I could, but need Santhosh's help with bringing it all together. Santhosh says that it's a good idea, but should be done later.
    • Worked with Yaron Shahrabani (yarons@github, User:YaronSh) and helped him to submit a patch to jquery.i18n.(patch merged)
    • Finished looking for easy MediaWiki i18n and mobile bugs for the DevCamp.
  • אעשה:
    • Gender bugs
  • צריך:
    • Clarifications about the required functionality for Gender bugs. Some of them are very easy technically, but require some specs.

Arun

  • Did:[Not attending]
    • Travel to Chennai, parents, relatives, food, its festival season http://en.wikipedia.org/wiki/Navratri
    • Watched a play in Tamil by a well known writer. Not very impressive, society seems to still be sitting inside the box.
    • Met Srikanth to handover the Galaxy Nexus, discussions about life.
  • Will do:
  • Need:

Niklas

Pau

സന്തോഷ്

  • ചെയ്തു:
    • jsfoo(see mail to team list)
    • continue on ULS+IME
  • ചെയ്യും:
    • continue on ULS+IME
  • വേണം:

Siebrand

  • Gedaan:
  • Te doen:
  • Nodig:

Srikanth (without webcam)

  • செய்தவை:
  • செய்யப்போவது:
    • Autonyms - Bit confused on this (ask Amir).
    • Provide context to the bugs
    • Test jquery.ime.
  • தேவை:

Stand-up meeting 2012-10-19 (07:00 UTC)

[edit]

Amir

Arun[Not attending, at the park]

  • Did:
    • Reading
  • Will do:
    • Expense reports
    • 1:1
  • Need:

Niklas

  • Tein:
    • Weekly
    • TUX
    • Started story #789
  • Teen:
    • Maybe fetch visa
    • Expand TUX or continue with #789
  • Tarvin:

Pau

  • Fet:
    • Review TUX doc and anwsered some comments
    • Full-page prototype base (using jquery.i18n)
    • India preps: Vaccination and getting passport back
  • A fer:
    • Complete full-page prototype
  • Necessitats:

സന്തോഷ് (traveling)

Siebrand

  • Gedaan:
    • Weekly meeting
    • Attended the Hangout on Air brownbag session. Vid is online now. Was nice.
    • E-mailed with Chris Steipp about security review of ULS. It appears to have one page with output that may be executable from the web.
  • Te doen:
    • A lot. On that.
    • Get shots for India travel
  • Nodig:

Srikanth

  • செய்தவை:
    • Blogpost
    • Outreach to India events
    • Weekly
    • Watched tech-chat on youtube
  • செய்யப்போவது:
    • Fix autonyms in jquery.ime
    • More outreach / spamming.
    • Bug list for Devcamp
    • 1:1
  • தேவை:
    • Review blogpost

Weekly meeting 2012-10-18 (17:00 UTC)

[edit]

1. Sprint Update - Siebrand [10 min]

  • Blog post should be posted asap. Siebrand will proofread.

2. India engineering events update - Alolita, Srikanth

a. DevCamp, Bangalore [5 min] -

Topics: We need to add more to the list of tasks - bug lists,

related links (github repos etc.). Update from Srikanth

Registration update [5 min] : Siebrand and Alolita

b. Language Summit Sessions [5 min] - Alolita

Alolita has been iterating with Santhosh & Red Hat to discuss &

finalize schedule and format. Please review the shared GDoc. Look

forward to your comments.

https://docs.google.com/ spreadsheet/ccc?key=0Asnprhp63DAtdDRWTDUxX2NkazRESFRidkVHTV9kN0E

c. Editors w Language team meetup in Bangalore and Pune [5 min]:

Srikanth will be organizing these meetups reaching out to editors and

admins who give us active feedback and test our tools. Scheduled for

Pune on Nov 4 Sunday at 1700 and for Bangalore on Nov 11 Sunday at

1400.

d. What are doing for Outreach? [5 min] Srikanth

  • Breadth and depth

2.5 Wikidata update

  • Would love to use ULS right from the start
  • Stable releases - continuous integration
  • Denny to connect Chris M.? and Niklas on possible issues
  • Will keep uptodated with ULS phase 2

3. Walkthrough of Translation UI/UX technical plan [20 min]

4. Admin - Questions, Issues re: Travel, Visas, Expense Reports, oDesk

etc. - [5 mins]

Stand-up meeting 2012-10-18 (07:00 UTC)

[edit]

Amir

  • Did:
  • Will do:
    • Same.
  • Need:
    • Help from Santhosh with ULS and jquery.webfonts weirdness.

Arun[Not attending]

  • Did:
    • Added two images for the blogpost
    • Macbook for servicing. It wont be ready by the time I leave to meet parents. Will be using only a netbook until Pune. Going to use this time to get back into code.
  • Will do:
    • Will be offline. Picked up a book from the flea market 'Design, Philip Rawson' that I will be reading
  • Need:

Bunny (hopefully waking up after late bugfixing night)

  • Tein:
    • TUX plan (translation and search)
    • Expense report
    • Quick check on Translate+CentralNotice bugs, added one comment
    • Investigating invisible pink issue in Translate blocking deployment
    • Special:ActiveUsers slow
    • JobQueue related bugs
  • Teen:
    • Tux technical plan finish
    • Maybe something else
  • Tarvin:

Pau

Santhosh

  • ചെയ്തു:
    • jquery.ime + mw.uls
    • office hour
    • Language summit- reaching out people
  • ചെയ്യും:
    • jquery.ime + mw.uls
    • Will not attend weekly meeting since I am travelling to Bangalore tonight
    • Attending JSFoo on next 2 days- not working
  • വേണം:
    • [SL] blog post - high priority
    • [SL] complete jquery.ime porting(fix language autonyms) - high priority
    • [AA] Port Narayam test cases to jquery.ime (#1705) - high priority
    • [SL] QA on jquery.ime - medium priority

Siebrand( not attending )

  • Gedaan:
  • Te doen:
  • Nodig:

Srikanth

  • செய்தவை:
    • Office hours
    • Outreach
    • Bug list with Amir
    • Blogpost
  • செய்யப்போவது:
    • Complete blogpost
    • jquery.ime fix autonyms
    • Bug list.
    • Weekly
  • தேவை:

Stand-up meeting 2012-10-17 (07:00 UTC)

[edit]

Amir

  • Did:
    • jquery.ime tests and code cleanup
  • Will do:
    • ULS bugs
    • or Prep for India events
  • Need:

Arun

  • Did:
    • Finalize T-shirt contract and invoice
    • Macbook checkup
    • Updates to blog post
  • Will do:
    • Add image to blogpost
    • Send Macbook for service
    • Language portal wiki changes
  • Need:
    • Srikanth to prepare the blog post

Niklas

  • Tein:
    • 1:1 w/ Alolita
    • Added Narayam integration to Translate
  • Teen:
  • Tarvin:
    • Core seems to still broken (new failure this time)
      • Going to report at least two bugs

Pau

  • Did:
    • Review Arun user journeys for Translate UX
    • Review multi-lingual design blog post
    • Sprint planning
  • Will do:
    • Task priorizing
    • Review ULS
    • ULS minor changes
  • Need:

Santhosh

  • Did:
    • Meeting with Sankarshan(RH) and Alolita on lang summit plan
    • jshint cleanup on mw uls
    • some bug fixes in ULS
    • sprint meetings
    • 1:1 meeting
    • started in jquery.ime integration with ULS
  • Will do:
    • jquery.ime integration
  • Need:

Siebrand

  • Did:
  • Will do:
    • Install Collection extension on sandbox.translatewiki.net and try to fix master. Wikimedia is running a "beginning of August" version now.
    • Hold and record the sprint demo using Google Hangouts on Air, download the mp4, convert to ogv and upload to Commons.
    • E-mail all VE docs to James Forrester
    • Working for another client all day.
  • Need:
    • Srikanth's general IME test description for VE and the Indic tests.

Srikanth

  • Did:
    • Sprint meetings
    • Completed porting IMEs
  • Will do:
    • Sprint blogpost
    • Outreach on mailing lists
  • Need:

Stand-up meeting 2012-10-15 (07:00 UTC)

[edit]

Amir

  • Did:
    • 1727 - Writing detailed test procedures for RTL languages
    • code review and cleanup for jquery.ime.
    • started jquery.ime tests
    • Fixed a few RTL bugs in Wikidata.
    • HTML5 bidirectional tests group meeting
  • Will do:
    • jquery.ime tests
    • ULS bug
  • Need:
    • help from Santhosh

Arun (

  • Did:
    • Created adobe fireworks component library and agora color palletes to make more consistent screens
    • Tshirt stuff with vendor
    • Weekend: Trekking/meetups with the new India chapter EC
  • Will do:
    • Finish translator journey screens
    • Write blog post
    • CSS for language portal wikipage
  • Need:

Niklas

  • Did:
    • Nothing
    • Told my mom to stop paying 40€ for internet that doesn't work :( Get a new provider.
  • Will do:
    • tux plan
    • unit tests
    • Update twn to master
    • odesk
  • Need:

Pau (off)

Santhosh (wearing Change.org shirt, localised stand-up questions)

  • ചെയ്തു:
    • Finished documentation of jquery.ime APIs, tech specification https://github.com/wikimedia/jquery.ime/wiki/Technical-Specification
    • Fixed Bug 40714 - ULS geoclient needs proper interface
    • I4f2333c5 Fix some TODO items in font repository
    • Added project ideas to Banglore dev camp wiki page
    • CR of pull requests
    • CR of link syntax to jqueryMsg ( https://gerrit.wikimedia.org/r/#/c/4055/ ) - added some parser tests
    • pet project (this weeks topic : typography)
      • Patch for a liature combination in FreeSans
      • Bug fixes and updates in Meera Tamil font
      • Genrated ligature report for Meera Tamil
      • GNU FreeSans will include Meera Tamil as Tamil glyphs set
      • Tests and bug reports in some Malayalam fonts
      • And a long discussion with Steve White of GNU Freefont about orthography switch in fonts
  • ചെയ്യും:
    • CR(in gerrit and github)
  • വേണം:
    • task 1705: unit tests for jquery.ime <- Amir
    • task 1708: Port Narayam input methods to jquery.ime <- Srikanth
    • task 1667: ULS i18n in TWN <- siebrand

Siebrand (wearing GSoC 2012 shirt)

  • Did:
  • Will do:
    • Update twn to master
    • 1667
    • Tad behind on tasks. Lot to to day.
  • Need:

Srikanth

  • செய்தவை:
    • Porting IMEs( for lang autonyms, use ULS)
    • https://github.com/wikimedia/jquery.ime/pull/7 - First js debugging and minor fix
      • Publicize Bangalore Devcamp (15 signups in just few hours!)
    • Bug hunting.
    • Reviewed Meera-tamil ligature report.
  • செய்யப்போகவை:
    • Complete IME blockers. (cyrl, eo)
    • Complete L10n wiki, VE test documents.
  • தேவை:
    • Some help from Santhosh on cyrl, eo maps.

Stand-up meeting 2012-10-12 (07:00 UTC)

[edit]

Amir

  • Did:
  • Will do:
    • ULS bugs
    • jquery.ime tests
  • Need:
    • help from Santhosh with ULS bugs

Arun

  • Did:
    • Make changes to India event designs
    • Translator singup and search workflow screens
    • 1:1
  • Will do:
    • Translation workflow screens
    • Create final tshirt design files for production
    • Design central notice banner for Devcamp
  • Need:

Niklas

  • Did:
    • Weekly meeting
  • Will do:
    • Remaining sprint tasks
    • Unit tests
    • tux technical plan
  • Need:
    • Got no answers from roan about installing parsoid/ve

Pau (not attending)

Santhosh

Siebrand

  • Did:
    • jshint fixes for LQT
  • Will do:
  • Need:

Srikanth

  • Did:
  • Will do:
    • Complete 1705
    • Prepare bugs / topics for devcamp
    • Finish other sprint tasks
  • Need:

Weekly meeting 2012-10-BUNNY (17:00 UTC)

[edit]

Sprint update [SM]

  • ContentHandler
  • Mingle status seems lagging again
  • Translation UX technical plan has been started, not ready yet
  • jquery.ime is progressing.

India events [AS, SL]

- DevCamp Bangalore

More indepth topics need at Bangalore_DevCamp_November_2012/Topics

- Language Summit sessions

- Meetups in Bangalore and Pune

TUX (Translation UX) [PG, AG]

  • gdocs presentation

Paperwar

  • Niklas will get 1y visa (at least it is cheaper)
  • Expense reports - Rachel is quite busy

Qn:

1 ) Any plans for Unicode conference?

2 ) Follow ups for Google meet up?

Stand-up meeting 2012-10-17 (07:00 UTC)

[edit]

Amir

  • Did:
    • jquery.ime tests and code cleanup
  • Will do:
    • ULS bugs
    • or Prep for India events
  • Need:

Arun

  • Did:
    • Finalize T-shirt contract and invoice
    • Macbook checkup
    • Updates to blog post
  • Will do:
    • Add image to blogpost
    • Send Macbook for service
    • Language portal wiki changes
  • Need:
    • Srikanth to prepare the blog post

Niklas

  • Tein:
    • 1:1 w/ Alolita
    • Added Narayam integration to Translate
  • Teen:
  • Tarvin:
    • Core seems to still broken (new failure this time)
      • Going to report at least two bugs

Pau

  • Did:
    • Review Arun user journeys for Translate UX
    • Review multi-lingual design blog post
    • Sprint planning
  • Will do:
    • Task priorizing
    • Review ULS
    • ULS minor changes
  • Need:

Santhosh

  • Did:
    • Meeting with Sankarshan(RH) and Alolita on lang summit plan
    • jshint cleanup on mw uls
    • some bug fixes in ULS
    • sprint meetings
    • 1:1 meeting
    • started in jquery.ime integration with ULS
  • Will do:
    • jquery.ime integration
  • Need:

Siebrand

  • Did:
  • Will do:
    • Install Collection extension on sandbox.translatewiki.net and try to fix master. Wikimedia is running a "beginning of August" version now.
    • Hold and record the sprint demo using Google Hangouts on Air, download the mp4, convert to ogv and upload to Commons.
    • E-mail all VE docs to James Forrester
    • Working for another client all day.
  • Need:
    • Srikanth's general IME test description for VE and the Indic tests.

Srikanth

  • Did:
    • Sprint meetings
    • Completed porting IMEs
  • Will do:
    • Sprint blogpost
    • Outreach on mailing lists
  • Need:

Stand-up meeting 2012-10-15 (07:00 UTC)

[edit]

Amir

  • Did:
    • 1727 - Writing detailed test procedures for RTL languages
    • code review and cleanup for jquery.ime.
    • started jquery.ime tests
    • Fixed a few RTL bugs in Wikidata.
    • HTML5 bidirectional tests group meeting
  • Will do:
    • jquery.ime tests
    • ULS bug
  • Need:
    • help from Santhosh

Arun (

  • Did:
    • Created adobe fireworks component library and agora color palletes to make more consistent screens
    • Tshirt stuff with vendor
    • Weekend: Trekking/meetups with the new India chapter EC
  • Will do:
    • Finish translator journey screens
    • Write blog post
    • CSS for language portal wikipage
  • Need:

Niklas

  • Did:
    • Nothing
    • Told my mom to stop paying 40€ for internet that doesn't work :( Get a new provider.
  • Will do:
    • tux plan
    • unit tests
    • Update twn to master
    • odesk
  • Need:

Pau (off)

Santhosh (wearing Change.org shirt, localised stand-up questions)

  • ചെയ്തു:
    • Finished documentation of jquery.ime APIs, tech specification https://github.com/wikimedia/jquery.ime/wiki/Technical-Specification
    • Fixed Bug 40714 - ULS geoclient needs proper interface
    • I4f2333c5 Fix some TODO items in font repository
    • Added project ideas to Banglore dev camp wiki page
    • CR of pull requests
    • CR of link syntax to jqueryMsg ( https://gerrit.wikimedia.org/r/#/c/4055/ ) - added some parser tests
    • pet project (this weeks topic : typography)
      • Patch for a liature combination in FreeSans
      • Bug fixes and updates in Meera Tamil font
      • Genrated ligature report for Meera Tamil
      • GNU FreeSans will include Meera Tamil as Tamil glyphs set
      • Tests and bug reports in some Malayalam fonts
      • And a long discussion with Steve White of GNU Freefont about orthography switch in fonts
  • ചെയ്യും:
    • CR(in gerrit and github)
  • വേണം:
    • task 1705: unit tests for jquery.ime <- Amir
    • task 1708: Port Narayam input methods to jquery.ime <- Srikanth
    • task 1667: ULS i18n in TWN <- siebrand

Siebrand (wearing GSoC 2012 shirt)

  • Did:
  • Will do:
    • Update twn to master
    • 1667
    • Tad behind on tasks. Lot to to day.
  • Need:

Srikanth

  • செய்தவை:
    • Porting IMEs( for lang autonyms, use ULS)
    • https://github.com/wikimedia/jquery.ime/pull/7 - First js debugging and minor fix
      • Publicize Bangalore Devcamp (15 signups in just few hours!)
    • Bug hunting.
    • Reviewed Meera-tamil ligature report.
  • செய்யப்போகவை:
    • Complete IME blockers. (cyrl, eo)
    • Complete L10n wiki, VE test documents.
  • தேவை:
    • Some help from Santhosh on cyrl, eo maps.

Stand-up meeting 2012-10-12 (07:00 UTC)

[edit]

Amir

  • Did:
  • Will do:
    • ULS bugs
    • jquery.ime tests
  • Need:
    • help from Santhosh with ULS bugs

Arun

  • Did:
    • Make changes to India event designs
    • Translator singup and search workflow screens
    • 1:1
  • Will do:
    • Translation workflow screens
    • Create final tshirt design files for production
    • Design central notice banner for Devcamp
  • Need:

Niklas

  • Did:
    • Weekly meeting
  • Will do:
    • Remaining sprint tasks
    • Unit tests
    • tux technical plan
  • Need:
    • Got no answers from roan about installing parsoid/ve

Pau (not attending)

Santhosh

Siebrand

  • Did:
    • jshint fixes for LQT
  • Will do:
  • Need:

Srikanth

  • Did:
  • Will do:
    • Complete 1705
    • Prepare bugs / topics for devcamp
    • Finish other sprint tasks
  • Need:

Weekly meeting 2012-10-BUNNY (17:00 UTC)

[edit]

Sprint update [SM]

  • ContentHandler
  • Mingle status seems lagging again
  • Translation UX technical plan has been started, not ready yet
  • jquery.ime is progressing.

India events [AS, SL]

- DevCamp Bangalore

More indepth topics need at Bangalore_DevCamp_November_2012/Topics

- Language Summit sessions

- Meetups in Bangalore and Pune

TUX (Translation UX) [PG, AG]

  • gdocs presentation

Paperwar

  • Niklas will get 1y visa (at least it is cheaper)
  • Expense reports - Rachel is quite busy

Qn:

1 ) Any plans for Unicode conference?

2 ) Follow ups for Google meet up?

Stand-up meeting 2012-10-BUNNY (07:00 UTC)

[edit]

Amir

Arun

Niklas

  • Did:
    • Filed visa application (so much easier than previous time), should take about a week and there is online tracking
  • Will do:
    • Weekly meeting
    • ((( Another meeting )))
  • Need:

Pau

  • Did:
    • Visa application
  • Will do:
    • Review translate ux presentation (answer to comments)
    • Complete ideas for DevCamp
    • Review input method menu CSS?
  • Need:

Santhosh

  • Did:
    • I5b81cd85 Fix the jqueryMsg tests for plural rule parsing
    • I9e148f6f Test RL modules files exists Improved test for checking any js missing for RL
    • I898bcf6e Load the fallback locales
    • 1e913e08 Update jquery.i18n from upstream
    • 2d2ee30d Add .jshintrc to ULS
    • bea91095ee jshint fixes for jquery.ime
    • aec52af6b7 Add test case for fr plural with empty singlular form
    • CR for many commits waiting for me in gerrit
  • Will do:
    • develop a minimal preference system for jquery.ime
    • weekly team meeting.
  • Need:
    • task 1705 and 1708

Siebrand(not attending)

Srikanth

Stand-up meeting 2012-10-10 (07:00 UTC)

[edit]

Amir

Arun (traveling)

Niklas

  • Did:
    • Weekly with Alolita
    • Deployments - a spelling mistake in one place caused 5 min delay
  • Will do:
    • Visa
    • Remaining in Mingle:
      • Newsletter review (blocked)
      • CN related docs, unit tests and support
      • Parsoid (blocked)
      • TUX plan (have some questions, will we have presentation tomorrow?)
  • Need:
    • Still waiting for fosdem expense report handling (last communication 2012-10-09)
    • Still waiting for prefilled expense report template (SFO)
    • Parsoid + VE installation waiting help from Roan (emailed last friday)

Pau (on vacation)

Santhosh

Siebrand

  • Did: Not much. Worked for another client most of the day.
    • Output fsckups in Collection extension.
    • Investigating JavaScript performance issues with Narayam and others. I think I was able to expedite jQuery 1.8.2 merge and deployment because of testing in sandbox.translatewiki.net.
  • Will do: Probably not much; still a lot of work for another client.
  • Need:

Srikanth

Stand-up meeting 2012-10-09 (07:00 UTC)

[edit]

Amir

  • Did:
    • Noticed that my patch to The Parser was merged by Tim Starling on September 26 ( https://gerrit.wikimedia.org/r/#/c/22435/ ). Accomplishment :)
    • the remaining ULS bugs - they are all easy, but I need some help from Santhosh with finishing all of them.
    • Started reviewing jQuery.ime.
  • Will do:
    • Finish ULS bugs.
    • Review jQuery.ime.
    • 1:1
  • Need:
    • some work with Santhosh to fix the bugs

Niklas (if not sleeping)

  • Did:
    • Random stuff
    • JsonFFS
    • wfMsg
  • Will do:
    • Deployment (SL : Have a request!)
  • Need:

Santhosh (in Fedora shirt)

  • Did:
    • Tested and reviewed many pull requests of jquery.i18n, jquery.uls
    • Debug/Fix IE transliteration issue with jquery.ime(took lot of time since I was using crossbrowsertesting live testing through VNC)
  • Will do:
    • Noted more bugs in some regex handling in jquery.ime- debug+fix
    • 1:1 w/ Alolita
  • Need:
    • sprint blog post published, No :x sent another reminder.

Siebrand

  • Did:
  • Will do:
    • Sprint demo and conversion. It's really important to get it done, and it should just be done on the day it's planned for, otherwise things get messed up as they did. I guess one of the power of agile-like is that "things just get done on a particular day" and even though that sometimes sucks, it's one of the things that makes it work. (and it if doesn't it should be changed).
    • Bangalore registration form.(+1 saw requests about this in twitter)+1 Need for mailing
    • Will merge Wikidata's ContentHandler feature into core in a few hours. Plan on getting it deployed on sandbox.translatewiki.net asap, and from there to twn production.
    • Supposed to be working for another client today.
  • Need:

Srikanth

  • Did:
    • QA on ULS (Needs a lot of crossbrowser testing)
    • Bug triage
  • Will do:
    • India events(prepare wiki pages)
    • Complete VE testing documents.
  • Need:
    • Where's the blogpost? (!)

Stand-up meeting 2012-10-08 (07:00 UTC)

[edit]

Amir

  • Did:
    • finished Bug 39963 - jQuery.uls.data. ... function names. Submitted as a GitHub pull request, needs review and merge.
    • started bug 39224 - Scrolling in languages when one of the three areas is selected makes the selection jump
    • updated ULS tests and abandoned old Gerrit commits about it (thanks to Santhosh for fixing this)
    • reviewing typing tests by Srikant
  • Will do:
    • work with Srikanth on typing tests
    • bug 39224
    • probably more ULS bugs
  • Need:

8 https://github.com/wikimedia/jquery.uls/pull/8]

    • Bug 39931 - Map region highlighting is not synchronized with list when scrolling up - probably WORKSFORME, needs verification VERIFIED FIXED
    • Visa letter from Red Hat (can wait until Israeli Tuesday)
    • Prefilled expense report template about San Francisco

Arun[not attending, leaving for LAX at 5am, flight at 12:55. Reach home on Oct 10]

  • Did:
    • Skeleton page for Language_portal
    • Started generating screens for translator journey. 25% done and progressing fast. Will start updating presentation when I reach.
  • Will do:
  • Need:
    • an uneventful flight

Niklas

  • Did:
    • Some Translate + CentralNotice stuff
    • translatewiki.net error log irc relay re-enabled
      • !recent and graphs timing out, no time to investigate
    • Started Translate UX technical plan
    • Baked buns https://dl.dropbox.com/u/11452060/081020121806.jpg
    • Haz new contract (yay!)
  • Will do:
    • Workings less hours today
    • Translate+CN is taking more time as expected
      • Testing is difficult
      • Code should be there
      • Should write more unit tests and help with code review when needed
    • JsonFFS
    • Kill some wfMsgs
  • Need:
    • Anything to deploy?
      • Bunnies and carrots
      • ...
    • CN stuff is waiting for review (both in Translate and in CN) > need who?
    • Still waiting for fosdem expense report handling (last communication 2012-10-05)
    • Still waiting for visa letters (BLR)
    • Still waiting for prefilled expense report template (SFO)
    • Parsoid + VE installation waiting help from Roan (emailed last friday)

Pau (off)

Santhosh

  • Did:
    • prepared presentation for jsfoo
    • investigated travis build fail for jquery.uls(updated phantomjs seems to fix it)
    • jquery.ime enable/disabe workflow, extended keyboard support, default ime selection, tickmarks for selection....
    • ((pet projects, reading, talked about wikipedia in a local meeting of merchants ))
  • Will do:
    • API documentation for jquer.ime
    • test framework
    • CR/test the pull requests by Amir
  • Need:

Siebrand

  • Did:
    • Almost completed wfMsg replacements on core, twn and Wikimedia used extensions, and more (some 170). 2 uses remaining in Translate that Niklas' help is needed on.
    • twn exports.
  • Will do:
    • Look into finding a new project for a non-developer (#1 for the day) to contribute to in MediaWiki code.
    • Sprint demo and conversion. It's really important to get it done, and it should just be done on the day it's planned for, otherwise things get messed up as they did. I guess one of the power of agile-like is that "things just get done on a particular day" and even though that sometimes sucks, it's one of the things that makes it work. (and it if doesn't it should be changed).
    • Bangalore registration form.(+1 saw requests about this in twitter)
  • Need:
    • Hmm... Nothing, really...

Srikanth

  • Did:
  • Will do:
    • VE Indic document
    • QA for ULS
    • bug triage.
  • Info:
    • On a spare laptop

Stand-up meeting 2012-10-05 (07:00 UTC)

[edit]

Amir

  • Did:
    • Fixed issue in TranslationNotifications (plural support)
    • Fix for https://bugzilla.wikimedia.org/show_bug.cgi?id=39932 is in GitHub (Clicking twice in a region moves the focus to the Worldwide region)
    • Started fixing more ULS bugs:
      • Bug 39963 - jQuery.uls.data. ... function names
      • Bug 39931 - Map region highlighting is not synchronized with list when scrolling up
    • FFS doc published
    • more proofreading for documentation by Niklas
    • Wrote a very primitive ULS build procedure for myself - just grunt and copy the files. See needs.(can be added to mw.uls scripts-updateJqueryULS.sh)
  • Will do:
    • Will probably be offline for a few hours on Friday, but will work on Sunday.
    • ULS bugs.
    • Work with Srikanth on VE test procedures (Srikanth already sent some drafts).
  • Need:
    • Better build procedure for ULS that copies the built JS/CSS from jquery.uls to the MW ULS. If I understand correctly, this requires submodule support in Gerrit. Not really a blocker, but it's not so robust.
    • ULS QUnit tests to work in GitHub. Santhosh says that it might be a PhantomJS issue. Again, not a blocker, but will make building and testing more efficient.

Arun[not attending]

  • Did:
    • Running slow on creating screens, was a pain working with the netbook
    • Decided I had to get a machine if I had to complete work, bought off craigslist. Had to setup Adobe software, migrate files from inkscape.
    • Travel to LA
  • Will do:
    • I have some work time in the morning and on my train to San Diego, will finish signup journey
    • Create base page for language portal
  • Need:
    • an office desk

Niklas

Pau

Santhosh

  • Did:
    • Worked on the UX of jquery.ime(all code available at github)
    • Ported more IMs to jquery.ime(de,am,hi,mr,ml,ta,he) - SL: I can port others if you have finalized.(not yet)
    • Mapped OpenDyslexic to 25 languages
    • Team meeting
  • Will do:
    • jquery.ime UX workflows(that takes more time than the actual core functionality)
    • (prepare presentation for jsfoo)
  • Need:

Siebrand

  • Did:
    • stuff
  • Will do:
    • more stuff (not really a lot to update)
  • Need:

Srikanth

  • Did:
  • Will do:
    • Complete Javanese patches
    • File bugs for VE?
    • ve-indic test document.
    • 1:1 Alolita
  • Need:
    • https://bugzilla.wikimedia.org/40630 if anyone has time.
      • Given that narayam is excluded as an issue, per comment 3, I don't think we should give this priority. This is most likely a community issue, that should be analysed by them first.

Weekly meeting 2012-08-30 (17:00 UTC)

[edit]

Sessions in the Language Summit

[edit]

[10 min]

Intro by Alolita: I have walked through the agenda with Red Hat's team and added more detail to the Language Summit sessions. Through these discussions, I've added session owners which includes Santhosh, Amir, Pau, Alolita and Siebrand. Unfortunately Niklas is not going to be there so his participation is limited at this summit.

DevCamp in Bangalore

[edit]

[10 min]

Intro by Alolita: We need to add more topics/interesting projects to work on at the Dev Camp. This means that I want input from all team members on topics and bugs that we should suggest as a to-do list for the DevCamp. Siebrand and I also need to work on the registration + developer test questions. Ideally registration should be enabled via geo-targeted Central Notices on the Indic projects as well as en.wp as soon as possible.

Bangalore_DevCamp_November_2012/Topics

(Santhosh and Yuvi can do some outreach at JSFoo)

Editors / Language team meetup in Bangalore and Pune

[edit]

[7 min]

Intro by Alolita: This session should be used as a face-to-face with the language team members we're cultivating in Indic and related language communities who are interested in learning about our i18n tools; testing and providing feedback on our tools. Srikanth will be the main organizer for this. I am envisioning that we do this as a session on Nov 5 afternoon / evening in Pune and Nov 9 evening session in Bangalore.

  • Sprint updates (If time allows )
  • Admin [Visas, Contracts etc.] - [3 mins]

Need - can Rachel prepare expense report for all of us for SF visit? Alolita: Yes

Stand-up meeting 2012-10-04 (07:00 UTC)

[edit]

Amir

Arun

  • Did:
    • Went to get a macbook from a contact, did not work out
    • Fallback to my netbook and inkscape, started working on screens for translate signup
  • Will do:
    • Complete signup and search screens and handover to pau for review
    • Travelling to LA in the evening
  • Need:

Niklas

Pau

  • Did:
    • Compile design info for presentation
    • UX review for jquery.ime
  • Will do:
    • Summarize testing results
    • Update documentation
    • Complete ULS video
  • Need:
    • User journey images from Arun (add to presentation)

Santhosh

  • Did:
    • jquery.ime ( discussed the UI/UX with Pau, working on core implementation, input method definition) -> going according to plan (time and technical wise)? -> Yes.
  • Will do:
    • jquery.ime
    • weekly meeting
  • Need:

Siebrand

  • Did:
    • Gave MediaWiki branch support in twn a lot of love. 1.20, 1.19 and 1.18 translations have been backported and are in fine working order.
    • Didn't complete any of the planned items of yesterday. Working for another client today. Srikanth should probably just work towards publishing the sprint blog post, and remove dependencies on my work.
  • Will do:
  • Need:

Srikanth

  • Did:
    • Sprint Blogpost
    • Installed VE, testing
  • Will do:
    • VE IME Test docs
    • Send office hours invite
    • Weekly
  • Need:

Stand-up meeting 2012-10-03 (07:00 UTC)

[edit]

Amir

  • Did:
    • FFS documentation and some code cleanup (card 1666) linky?
  • Will do:
    • Finish FFS documentation
    • Help Srikanth with preparing VE typing test, if needed (card 1725)
    • ULS bugs
  • Need:
    • A few minutes with Niklas may help me finish 1666 faster

Arun

  • Did:
    • Off-day. Moving from SF to Santa Clara
  • Will do:
    • Screens for signup and search workflows
  • Need:

Niklas

Pau

Santhosh

  • Did:
    • Sprint Meetings
    • jquery.ime
    • Read Niklas' standup meeting note.
  • Will do:
    • jquery.ime
  • Need:
    • UX review for jquery.ime

Siebrand

  • Did:
    • end/start sprint
    • twn maintenance (f.e. added support for 1.20 branch of core)
  • Will do:
    • Working for another client all day (also tomorrow)
    • Convert and upload sprint demo video for sprint 24
    • Create, record, upload, convert, upload sprint demo for sprint 25
  • Need:

Srikanth

  • Did:
    • Sprint meetings
    • Javanese Narayam, WebFonts
    • India meetups emails
  • Will do:
    • Sprint Blogpost
    • Install VE locally
    • L10n portal with Arun.
  • Need:

Stand-up meeting 2012-09-DD (07:00 UTC)

[edit]

Amir

  • Did:
  • Will do:
  • Need:

Arun

Niklas

Pau

  • Did:
    • Presentation at SFSU
    • (Design cabal)
  • Will do:
    • (Design cabal: including i18n topics)
  • Need:

Santhosh

  • Did:
    • Presentation at SFSU
    • Resubmitted plural cleanup with correction
    • Continued on jquery.i18n+uls
  • Will do:
    • Continu on jquery.i18n+uls
  • Need:

Siebrand

  • Did:
  • Will do:
  • Need:

Srikanth

  • Did:
  • Will do:
  • Need:

Stand-up meeting 2012-09-20 (07:00 UTC)

[edit]

Amir

  • Did:
  • Will do:
  • Need:

Arun

Niklas

Pau

  • Did:
  • Will do:
    • Presentation at SFSU
    • (Design cabal)
  • Need:

Santhosh

  • Did:
    • ULS- i18n - did some fixes to jquery.i18n
    • Code review meeting
  • Will do:
    • Work on ULS i18n
    • SFSU meeting
  • Need:

Srikanth

  • Did:
    • Limited availability
    • Added Javanese Webfont
  • Will do:
    • Sprint blogpost
    • Update my backlog
  • Need:

Stand-up meeting 2012-09-19 11:10 PDT, Face to face!

[edit]

Amir

  • Did:
    • code review
    • fixed an old commit in Hindi Narayam
    • Font usage analysis with Pau
  • Will do:
    • DTD FFS
    • FFS doc
    • Publish doc on fonts on MediaWiki.org. Internationalization/Typography and then send ref to design mailing list.
    • Prep for presentation tomorrow.
  • Need:

Arun

  • Did:
    • Design cabal and syncing on design issues
    • Mobile wikipedia layout
  • Will do:
    • Detail the navigation schema of mobile layout, send to design list
    • Presentation on translate UX for tomorrow
    • Start working on India events collateral designs
  • Need:

Niklas

Pau

Santhosh

  • Did:
    • Meeting with Sue
    • Refactored jquery.i18n code with a MessageStore class
    • Moved ULS jquery libraries to github
    • Instructed the repo for using travis-ci with grunt build
  • Will do:
  • Need:

Siebrand

  • Did:
    • stuff
  • Will do:
    • ULS review
    • Code review practices with Niklas, Santhosh and Aaron
    • Prepare presentation for tomorrow in Google presentation
    • Do some coding
  • Need:

Srikanth

  • Did:
    • Office hours
    • failed jquery.i18n tests
  • Will do:
    • Limited Availability
  • Need:

Stand-up meeting 2012-09-17 (15:30 UTC)

[edit]

Amir

  • Did:
    • Food for the team
  • Will do:
    • Open code review
    • Meeting with VE team
  • Need:
    • PHP debugger

Arun

  • Did:
    • Mailman design
    • Learned git and how to push- yay!
  • Will do:
    • Complete blogpost
    • Translate UX
    • i18n portal page
  • Need:
    • Asked Alolita for a notebook

Niklas

  • Did:
  • Will do:
    • Help amir to finish DTD FFS fixes
    • Work on Translate-CentralAuth workflow state tasks
    • Monitor plural situation, possibly try to deploy
    • Belbin?
  • Need:

Pau

  • Did:
    • Completed translate page prototype
    • and tested with Niklas
  • Will do:
    • Define integration for translate UX designs
    • Summarize translate UX test results and blog post
    • Complete jquery.i18n example for Santhosh
  • Need:

Santhosh

  • Did:
    • Plural Fixes, cleanups
    • ULS bug fixes
  • Will do:
    • planned meetings
  • Need:

Siebrand

  • Did:
    • TechDays, including a day of sprint on CN/Translate integration. CN can now create message groups in Translate. The next day we'll be working on this we have to get "conditional export" done.
    • All staff: Was a lot of a fun.
  • Will do:
    • Prepare sprint, so we have to spend as little time as possible on planning. Most things have been planned beforehand, so it should be smooth.
    • Sprint demo is Tuesday 08:00 PDT, so I have to prepare everything today/Monday.
    • VE meeting is from 13-15. Make sure you've had lunch before that, and are on time! Meeting is in R36/Beauvais.
    • 17-18 we close the sprint.
    • 19:30-21:30 we do the Belbin meeting...
    • India events planning with Alolita (travel dates and start planning/booking flights).
  • Need:

Srikanth

  • Did:
    • Language team plan walk through with Bengali / Kannada volunteers.
    • ULS Common languages testing.
    • Punjabi key maps - still need inputs(note the failing tests)
    • jquery.i18n unit tests - failing.(see CI http://travis-ci.org/#!/wikimedia/jquery.i18n )
    • L10N wiki pages.
    • Office hours invite
    • Relocation hassles.
  • Will do:
    • Update cards
    • Meetings and some sleep in between.
  • Need:

Stand-up meeting 2012-09-07 (07:00 UTC)

[edit]

Amir

  • Did:
  • Will do:
  • Need:

Arun

  • Did:
    • Updates to translation task list and i18n portal from feedback
    • Presentation outline
  • Will do:
    • Reply to feedback mails
    • Travel stuff, take the train to Chennai tonight
  • Need:

Niklas

  • Did:
    • Preparations
  • Will do:
    • Preparations
    • Fix twn bug
    • Start packing and stuff
  • Need:

Pau (Not attending)

  • Did:
    • Review translation task list wireframes
    • Complete ULS presentation
  • Will do:
    • Fly to SF
    • Tasks involving thinking & sketching at the airport/plane
  • Need:

Santhosh

  • Did:
    • ULS bug fix tasks
    • ULS tech documentation
  • Will do:
    • ULS bug fixes
  • Need:

Siebrand

  • Did:
  • Will do:
  • Need:

Srikanth

  • Did:
    • L10N wiki stubs
    • Email potential language team members
  • Will do:
    • QA task
  • Need:

Stand-up meeting 2012-09-06 (07:00 UTC)

[edit]

Amir

org/r/#/c/21856/ https://gerrit.wikimedia.org/r/#/c/21856/] and comments about language aliasing (Niklas will look at it)

Arun

Niklas

  • Did:
  • Will do:
    • Complete above
    • Translate technical document review (also got mail from Peter G.)
  • Need:

Pau

  • Did:
    • Work on ULS presentation
    • Pending mails before SF
  • Will do:
    • Review translation task list wireframes
    • Planning with Arun
    • Complete ULS presentation
  • Need:

Santhosh

  • Did:
    • ULS bug fixes
    • Narayam typing speed fix with jQuery 1.8.1 later Krinkle filed a big set of improvements- tested and commented
  • Will do:
    • Bug fix cards
  • Need:

Siebrand

  • Did:
    • Admire the mountain of work ahead while working for another client.
    • Reviewed my new contract. Shared comments with rest of the team.
    • Reviewed blog posts from Srikanth for techblog, and Niklas' post for personal blog.
    • Read another great commit summary by Krinkle/Timo. https://gerrit.wikimedia.org/r/#/c/22854/
  • Will do:
    • Working for another client all day. Will probably be a long day.
    • There a no 1-on-1s today and there is no weekly meeting!
    • Not attending daily meeting.
  • Need:
    • Niklas: Please reply to Peter's e-mail.

Srikanth

Stand-up meeting 2012-09-05 (07:00 UTC)

[edit]

Amir

Arun

Niklas

  • Did:
  • Will do:
    • Blogging, preparations
  • Need:

Pau

  • Did:
    • Update observations for last test
    • Six meetings
    • T-shirt designs
  • Will do:
    • ULS presentation
  • Need:

Santhosh

  • Did:
    • Meetings
    • started on #1660
    • (got admin access to github projects)
  • Will do:
    • #1660 and rest of the cards
  • Need:

Siebrand (not present in daily)

  • Did:
    • Most of the same things you did.
  • Will do:
    • As much as I can and as little as I have to. Working for other clients Wed/Thu/Fri. Should be able to be in daily at least on Thursday.
  • Need:

Srikanth

  • Did:
    • Meetings
    • i18n portal phttp://etherpad.wikimedia.org/l10n-wiki1
  • Will do:
    • Blogpost
  • Need:

Stand-up meeting 2012-09-03 (07:00 UTC)

[edit]

Amir

  • Did:
    • Updated jquery.webfonts tests.
    • Code review for jquery.i18n, submitted tiny fixes for tests.
    • Submitted a fix to Bug 37018 - the inputbox always has the directionality of the content language.
    • Code review.
    • Reviewed Santhosh mobile webfonts document and made a few corrections.
    • Closed bug 38679 in ULS - Group all America languages together. Verified
    • Learned some Lua on a bus to Tel-Aviv and back.
  • Will do:
    • remaining FFS and RTL cards.
  • Need:

Arun[skype/ubuntu issues, reconnecting]

  • Did:
    • Meeting with Alolita and Srikanth on i18n landing page design and modifications
    • Concepts for translation watchlist -> wiki task manager
    • More call for participants for usability tests
    • Watched previous test observation videos
  • Will do:
    • 2 usability tests planned today, 1 with user unfamiliar with translations
    • Test observations and notes on mediawiki, documentation tasks
  • Need:

Niklas

  • Did:
    • Don't really remember, some bug hunting at least
  • Will do:
    • Taken from Friday :)
    • [high] Code review ULS/jquery.i18n (if any left)
    • [med] Blog post about translation memory on WMF
    • [low] Bugs for big corporation :)
    • [low] Waymarked trails help pages to translatewiki.net
  • Need:
    • Anything to deploy?

Pau

  • Did:
    • Usability testing
    • Review ULS: tests and latest updates
    • Quick fix for bug 39414
  • Will do:
    • Usability testing with 2 users
    • Process notes for the last round of tests
    • Update designs
  • Need:

Santhosh

  • Did:
    • Indic rendering on mobile - documented
    • Fixed Bug 39535 - Recent languages in languages settings
    • Fixed bug 39733 - setlang overrides uselang
    • Fixed bug 39687- Title of ULS when accessed from display settings
    • jquery.i18n - grammar support added for all languages in mw. Added tests too
    • Did some documentation in github wiki for jquery.i18n
  • Will do:
    • Do CR, and bug fixes(ULS)
  • Need:

Siebrand

  • Did:
    • twn support and exports
    • sent sprint demo invitation (just now) wikitech-l, mediawiki-i18n
    • moar (sic.) maintenance for extensions.
  • Will do:
    • Complete backlog.
  • Need:

Srikanth

  • Did:
  • Will do:
    • Verify ULS Fixes
    • Complete todo's on l10n wiki.
    • Publish language team plan.
  • Info:
    • In Chennai, hoping fewer power cuts.